Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24NE0025 and 22NE0038 have near-identical descriptions about 222 m apart (funding years 2022, 2024; ₱57.19M, ₱29.70M). Worth checking whether they cover the same works. It is possible that the two contracts cover different sections of the same barangay or are part of a phased improvement near the bridge.

Public record entityConstruction of Flood Control Structure at Tag-iho Bridge I, Tag-abaca, Basilisa, Dinagat Islands
LocationBASILISA (RIZAL) (DINAGAT ISLANDS), DINAGAT ISLANDS, Region XIIIContract 24NE0025
Amount₱57,193,333.19 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure at Tag-iho Bridge I, Tag-abaca, Basilisa, Dinagat Islands24NE0025Flood control100%September 30, 2024September 29, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 5, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24NE0025",
  "coordinates": {
    "lat": 10.060228,
    "lon": 125.59872
  },
  "municipality": "BASILISA (RIZAL) (DINAGAT ISLANDS)",
  "distanceMeters": 222.258566073888,
  "titleSimilarity": 0.8852459016393442
}

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction of Flood Control Structure at Tag-iho Bridge I, Tag-abaca, Basilisa, Dinagat Islands.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/8cb34ba8-16f0-465e-abbf-127f118270ab

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Dinagat Islands
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Ewiniar 2024
Hazard exposure
Active fault34.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)no layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideno layer coverage for this provinceUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.