Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24CC0261 and 24CC0264 have near-identical descriptions about 292 m apart (funding year 2024; ₱72.37M, ₱72.37M). Worth checking whether they cover the same works. It is possible that one project is a specific reinforced concrete component of the broader flood control structure, or that the two are adjacent or sequential segments.

Public record entityConstruction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan
LocationCITY OF MALOLOS (CAPITAL) (BULACAN), BULACAN, Region IIIContract 24CC0261
Amount₱72,374,895.37 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan24CC0261Flood control100%November 27, 2024June 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 2, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24CC0261",
  "coordinates": {
    "lat": 14.827436,
    "lon": 120.82048
  },
  "municipality": "CITY OF MALOLOS (CAPITAL) (BULACAN)",
  "distanceMeters": 291.9271160632787,
  "titleSimilarity": 0.8863636363636364
}

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCity of MalolosBagna
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault34.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.