High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: E F CHUA CONST INC holds 32 flood-control contracts worth ₱2.30B, 2.27× the 95th-percentile contractor total (₱1.01B); up to 17 ran at the same time. This is a capacity question worth examining. The contractor may have specialized expertise or capacity that justifies handling a large number of projects.

Public record entityE F CHUA CONST INCOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 32Ongoing: 0Delayed: 0Status unknown: 0
Show 26 more projects in this bucket
Construction of Flood Control Structure along Zapote River, Barangay Molino 4, Bacoor City, Cavite22D00100Flood control100%December 6, 2023November 6, 2023—completedsumbong source
Construction of Flood Control Structure at Zapote River, Las Piñas City22OI0038Flood control100%August 7, 2022August 7, 2022—completedsumbong source
Construction of Flood Control Structure, Aplaya, Barangay Poblacion, Muntinlupa City22OI0045Flood control100%December 12, 2022December 12, 2022—completedsumbong source
Construction of Flood Control Structure, Balihatar Creek, Las Piñas City23OI0028Flood control100%August 11, 2023August 11, 2023—completedsumbong source
Construction of Flood Control Structure, Zapote River, Las Piñas City23OI0032Flood control100%December 19, 2023December 19, 2023—completedsumbong source
Construction of Flood Control Structures along Laguna Lake, Barangay Alabang and Barangay and Barangay Cupang, Muntinlupa City21OI0023Flood control100%December 13, 2022December 13, 2022—completedsumbong source
Construction of Flood Control Structures along Laguna Lake, Barangay Alabang, Muntinlupa City21OI0022Flood control100%December 13, 2022December 13, 2022—completedsumbong source
Construction of Flood Control Structures along Laguna Lake, Barangay Cupang, Muntinlupa City21OI0017Flood control100%December 13, 2022December 13, 2022—completedsumbong source
Construction of Flood Control Structures along Zapote River at Barangay San Nicolas 1, Bacoor, Cavite23D00168Flood control100%April 5, 2024April 5, 2024—completedsumbong source
Construction of Flood Control Structures along Zapote River, Brgy San Nicolas 3, Bacoor, Cavite23D00165Flood control100%April 5, 2024April 5, 2024—completedsumbong source
Construction of Flood Control Structures and Other Improvements, Zapote River, Brgy Molino 4, Bacoor, Cavite (Phase 3)23D00163Flood control100%April 5, 2024April 5, 2024—completedsumbong source
Construction of Flood Control Structures, Road and Other Improvements along Zapote River, Barangay Talon 2, Las Piñas City23OI0078Flood control100%October 22, 2023October 22, 2023—completedsumbong source
Construction of Flood Control Structures, Road and Other Improvements, Molino River, Brgy Molino 3, Bacoor, Cavite23D00164Flood control100%April 11, 2024April 11, 2024—completedsumbong source
Construction of Flood Control Structures, Road and Other Improvements, Zapote River, Brgy. Molino 4, Bacoor, Cavite (Phase 1)23D00161Flood control100%February 26, 2024February 14, 2024—completedsumbong source
Construction of Flood Control Structures, Road and Other Improvements, Zapote River, Brgy. Molino 4, Bacoor, Cavite (Phase 2)23D00166Flood control100%February 11, 2024February 11, 2024—completedsumbong source
Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, Cavite21D00079Flood control100%September 28, 2022September 28, 2022—completedsumbong source
Construction of South Pinagkabalian Pumping Station (Phase 2), Malabon City24O00023Flood control100%September 3, 2024August 31, 2024—completedsumbong source
Construction of Drainage Main along A.P. Reyes Avenue (North Bound) from H. Santos St. Drainage Main towards J.P. Rizal Avenue, District I, Makati City, Metro Manila22OC0005100%December 13, 2022October 24, 2022—completedsumbong source
Construction of Drainage Main along H. Santos St. towards Barangay Carmona Pumping Station Including One (1) Unit Additional Pump and Sump Pit with Accessories, Barangay Carmona, Makati City22OC0013100%December 13, 2022December 13, 2022—completedsumbong source
Construction of Revetment Wall Along Maricaban Creek Makati Side (Phase 5), Makati City22OC0007100%November 13, 2022November 13, 2022—completedsumbong source
Construction of Revetment Wall Along Maricaban Creek Makati Side (Phase 6), Makati City22OC0008100%November 13, 2022November 13, 2022—completedsumbong source
Construction of Slope Protection (River Drive), Molino 3 to San Nicolas 1 (Section) Phase 2, Bacoor City, Cavite22D00085100%December 15, 2023December 15, 2023—completedsumbong source
Construction of Slope Protection Structure along Zapote River, Brgy. Molino 4, Bacoor, Cavite22D00101100%August 16, 2023August 16, 2023—completedsumbong source
Construction of Slope Protection, Molino 4, Bacoor City, Cavite22D00103100%October 15, 2023October 15, 2023—completedsumbong source
Construction of Slope Protection, Springville Heights, Molino 7, Bacoor City, Cavite22D00102100%April 16, 2023April 16, 2023—completedsumbong source
Rehabilitation of Drainage Structure along J.P. Rizal Street (including Sidewalk and Driveway) Phase 2, District I, Makati City24OC0084100%November 19, 2024November 19, 2024—completedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "E F CHUA CONST INC",
  "projectCount": 32,
  "totalValuePhp": 2301812895.0099998,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name