Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24CA0023 and 23CA0012 have near-identical descriptions about 331 m apart (funding years 2023, 2024; ₱9.90M, ₱19.60M). Worth checking whether they cover the same works. It is possible that the second project repaired damage from the first, or that they cover different stretches of the same flood control structure.

Public record entityConstruction of Flood Control Structure along Barangay Pulo, Hermosa, Bataan
LocationHERMOSA (BATAAN), BATAAN, Region IIIContract 24CA0023
Amount₱9,899,999.43 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Barangay Pulo, Hermosa, Bataan24CA0023Flood control100%June 16, 2024June 13, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 18, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24CA0023",
  "coordinates": {
    "lat": 14.84087,
    "lon": 120.50165
  },
  "municipality": "HERMOSA (BATAAN)",
  "distanceMeters": 330.80456907847093,
  "titleSimilarity": 0.9090909090909091
}

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction of Flood Control Structure along Barangay Pulo, Hermosa, Bataan.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/9ad349cc-4693-4b31-9e0a-16f8e98115e2

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BataanHermosaPulo
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault48.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA3 (4.01-5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.