Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23AE0036 and 23AE0037 have near-identical descriptions about 95 m apart (funding year 2023; ₱5.84M, ₱3.03M). Worth checking whether they cover the same works. One contract may be a continuation or a separate phase that was not labelled as such.

Public record entityRehabilitation of Flood Mitigation Structure (Phase 1) along Dayacos River, Barangay Bacsayan, San Juan, La Union
LocationSAN JUAN (LA UNION), LA UNION, Region IContract 23AE0036
Amount₱5,839,670.96 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Flood Mitigation Structure (Phase 1) along Dayacos River, Barangay Bacsayan, San Juan, La Union23AE0036Flood control100%July 17, 2023July 17, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 28, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23AE0036",
  "fundingYear": 2023,
  "municipality": "SAN JUAN (LA UNION)",
  "distanceMeters": 95.45745738617394,
  "titleSimilarity": 0.9337571956353639
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Rehabilitation of Flood Mitigation Structure (Phase 1) along Dayacos River, Barangay Bacsayan, San Juan, La Union.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/a941a62d-f2a7-40d6-ab8c-6d94114e4f4e

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)La UnionSan JuanBacsayan
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Tapah 2025
Hazard exposure
Active fault15.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.