| REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 92 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 94 | Check in |
| CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Flood Control Management Cluster | ₱853.1M | Reported complete | RAYMAN BUILDERS INC | 64 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱715.1M | 94% reported progress | MSB VITUG CONST | 66 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱669.3M | Reported complete | E M CUERPO INC | 93 | Check in |
| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱533.8M | 94% reported progress | TOKWING CONST CORP FOR TOKWING CONSTRUC | 84 | Check in |
| Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | SANTA CATALINA (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 28 | Check in |
| Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos Sur | TAGUDIN (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 74 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | Reported complete | ALPHA | 76 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | 95% reported progress | KATHA BUILDERS & SUPPLIES INC | 77 | Check in |
| Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱193.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 86 | Check in |
| CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE | Region I | ₱173.0M | Reported complete | BADOC BUILDERS | 92 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2) | Region I | ₱157.3M | Reported complete | A I P CONST | 76 | Check in |
| Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1) | QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR | ₱157.3M | Reported complete | A I P CONST | 74 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | BALINTUGAN CONST | 96 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 98 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion | BACNOTAN (LA UNION), LA UNION | ₱154.4M | Reported complete | RODEKOM GEN CONST AND ENT | 92 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 96 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La Union | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 98 | Check in |
| CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRA | Abra DEO | ₱148.5M | 92% reported progress | MG SAMIDAN CONST | 69 | Check in |
| Construction of Salangsang Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱148.5M | Reported complete | MG SAMIDAN CONST | 60 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNION | Region I | ₱146.3M | 35% reported progress | ST MATTHEW GEN CONTRACTOR | 92 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 91% reported progress | A I P CONST | 73 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 89% reported progress | A I P CONST | 77 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLOR | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 67 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 84 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRA | Abra DEO | ₱144.8M | 87% reported progress | MG SAMIDAN CONST | 66 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, Abra | LAGANGILANG (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra | LUBA (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 67 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra | MANABO (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 64 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRA | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 52 | Check in |
| Construction of Pudok Flood Control (Phase 2), Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 62 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 55 | Check in |
| Construction of Deet-Pudok Flood Control Structure, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 61 | Check in |
| Construction of Toon-San Gregorio Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | 739 BUILDERS | 59 | Check in |
| Construction of Naguillan Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / RM30 PSG CONST CORP | 59 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRA | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 81 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRA | Abra DEO | ₱144.7M | 95% reported progress | MG SAMIDAN CONST | 66 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN, | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 53 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | ₱144.7M | 73% reported progress | SILVERWOLVES CONST CORP | 90 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. JARDIN - TARANGOTONG, TAGUDIN, ILOCOS SUR, STA 8+118 - STA 9 | Region I | ₱144.7M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 71 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGDARAOAN, SAN FERNANDO CITY, LA UNION | Region I | ₱144.7M | 91% reported progress | SILVERWOLVES CONST CORP | 99 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, Abra | DOLORES (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 64 | Check in |
| Construction of Poblacion-Deet Flood Control along Abra River, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / TWINFORMERS CONST SERVICES | 61 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MUDIIT FLOOD CONTROL ALONG ABRA RIVER, MUDIIT, DOLORES, ABRA | Abra DEO | ₱144.6M | 92% reported progress | MG SAMIDAN CONST | 67 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUC | Abra DEO | ₱142.8M | 96% reported progress | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.9M | 72% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 74 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 1, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.9M | 75% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 74 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BARANGAY STA. ANA, SOLSONA, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.4M | 61% reported progress | EUS CONST | 97 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTE | Region I | ₱140.4M | 0% reported progress | A B TAYLAN CONST & DEVT FORMERLY: ADSM CONST | 85 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRA | Abra DEO | ₱140.3M | 86% reported progress | MG SAMIDAN CONST | 67 | Check in |
| FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL, LAOAG CITY, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱139.0M | 19% reported progress | A B TAYLAN CONST | 93 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION, | Abra DEO | ₱139.0M | 90% reported progress | MG SAMIDAN CONST | 65 | Check in |
| CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | ₱139.0M | 95% reported progress | MG SAMIDAN CONST | 59 | Check in |
| CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRA | Abra DEO | ₱138.9M | 85% reported progress | MG SAMIDAN CONST | 71 | Check in |
| CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Abra DEO | ₱138.9M | 95% reported progress | MG SAMIDAN CONST | 63 | Check in |
| CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Abra DEO | ₱138.9M | 96% reported progress | MG SAMIDAN CONST | 67 | Check in |
| CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Abra DEO | ₱138.8M | 21% reported progress | MG SAMIDAN CONST | 64 | Check in |
| CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA | Abra DEO | ₱138.8M | 80% reported progress | MG SAMIDAN CONST | 99 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF CABARUYAN FLOOD CONTROL, CABARUYAN, DAGUIOMAN, ABRA | Abra DEO | ₱138.7M | 94% reported progress | MG SAMIDAN CONST | 86 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY LI | Abra DEO | ₱138.5M | 93% reported progress | MG SAMIDAN CONST | 60 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRA | Abra DEO | ₱138.3M | Reported complete | MG SAMIDAN CONST | 53 | Check in |
| CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Abra DEO | ₱138.2M | 95% reported progress | MG SAMIDAN CONST | 62 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Abra DEO | ₱138.1M | 95% reported progress | 739 BUILDERS | 68 | Check in |
| CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRA | Abra DEO | ₱138.0M | 40% reported progress | MG SAMIDAN CONST | 56 | Check in |
| CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | ₱137.8M | 95% reported progress | MG SAMIDAN CONST | 58 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF MAGMAGUEY FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱137.7M | 97% reported progress | MG SAMIDAN CONST | 65 | Check in |
| CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRA | Abra DEO | ₱137.7M | 47% reported progress | MG SAMIDAN CONST | 56 | Check in |
| CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRA | Abra DEO | ₱137.6M | 91% reported progress | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRA | Abra DEO | ₱137.6M | 76% reported progress | MG SAMIDAN CONST | 72 | Check in |
| CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRA | Abra DEO | ₱137.6M | 95% reported progress | MG SAMIDAN CONST | 56 | Check in |
| CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRA | Abra DEO | ₱137.6M | 91% reported progress | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRA | Abra DEO | ₱137.6M | 23% reported progress | MG SAMIDAN CONST | 73 | Check in |
| CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRA | Abra DEO | ₱137.6M | 0% reported progress | MG SAMIDAN CONST | 71 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL ALONG ABRA RIVER, BANGBANGCAG, BUCAY, ABRA | Abra DEO | ₱137.5M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION OF BAGATOY FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱137.5M | 89% reported progress | MG SAMIDAN CONST | 66 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY SAN GREGORIO, | Abra DEO | ₱137.5M | 85% reported progress | MG SAMIDAN CONST | 59 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF LAGAYAN FLOOD CONTROL (PHASE 2), LAGAYAN, ABRA | Abra DEO | ₱137.5M | 99% reported progress | MG SAMIDAN CONST | 71 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF NAGTUPACAN FLOOD CONTROL ALONG ABRA RIVER, NAGTUPACAN, LAGANGILANG, ABRA | Abra DEO | ₱137.5M | 90% reported progress | MG SAMIDAN CONST | 69 | Check in |
| CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRA | Abra DEO | ₱137.5M | 75% reported progress | MG SAMIDAN CONST | 55 | Check in |
| CONSTRUCTION OF NAGTUPACAN-ISIT FLOOD CONTROL, DOLORES, ABRA | Abra DEO | ₱137.5M | Reported complete | MG SAMIDAN CONST | 63 | Check in |
| CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRA | Abra DEO | ₱136.2M | 80% reported progress | MG SAMIDAN CONST | 92 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI-DAGSIAN FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱135.9M | 81% reported progress | MG SAMIDAN CONST | 64 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY CA | Abra DEO | ₱135.1M | 84% reported progress | MG SAMIDAN CONST | 63 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURES (AMBURAYAN RIVER), MINDORO, BANGAR, LA UNION | Region I | ₱126.2M | Reported complete | H G LOPEZ CONST | 74 | Check in |
| Rehabilitation of Flood Control Structure On Scoured and Eroded River Bank along Badoc River, barangay Las-ud and San Julian, Badoc, Ilocos Norte | BADOC (ILOCOS NORTE), ILOCOS NORTE | ₱125.4M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 63 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, BARANGAY MABALENG, BATAC CITY, ILOCOS NORTE | Region I | ₱122.7M | 75% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 74 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, BATAC CITY, ILOCOS NORTE | Region I | ₱115.8M | Reported complete | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 78 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | ₱115.8M | Reported complete | RCD GEN CONTRACTOR & CONST SUPPLY | 76 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. BIO-BUCAO - EAST BUCAO - WEST-SAN MIGUEL, TAGUDIN, ILOCOS SU | Region I | ₱115.8M | Reported complete | A P B CONST | 75 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF SWIP, BARANGAY CAMANDINGAN, CITY OF BATAC, ILOCOS NORTE | Region I | ₱112.3M | 0% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 84 | Check in |
| DISASTER-RELATED AND EMERGENCY REHABILITATION - FLOOD CONTROL SYSTEMS 1.) RECOVERY/RECONSTRUCTION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA 2.) REPAIR/REHABILITATION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA | Cordillera Administrative Region | ₱112.3M | 26% reported progress | S D PLATON CONST INC | 68 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SUR | Ilocos Sur 1st DEO | ₱112.3M | 95% reported progress | 739 BUILDERS | 36 | Check in |
| SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVERBANK PROTECTION AT NANGUNEG WEST AND SAN PEDRO, NARVACAN, ILOCOS SUR | Ilocos Sur 2nd DEO | ₱112.3M | 60% reported progress | SATRAP CONST CO INC | 41 | Check in |
| Construction of Flood Control Structure along Quiaoit River (Upstream of Barsa Bridge), Sitio Barsa, barangay Nalasin, Paoay, Ilocos Norte | PAOAY (ILOCOS NORTE), ILOCOS NORTE | ₱106.1M | Reported complete | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 78 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | ₱106.1M | 67% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 90 | Check in |
| Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos Sur | SANTA (ILOCOS SUR), ILOCOS SUR | ₱104.2M | Reported complete | BET CONST & SUPPLY / M G LUALHATI CONST CORP | 34 | Check in |
| Rehabilitation of Flood Control along Galpac Creek, Paoay, Ilocos Norte | PAOAY (ILOCOS NORTE), ILOCOS NORTE | ₱99.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY | 74 | Check in |
| Construction of Bato Creek Slope Protection, City of San Fernando, La Union | CITY OF SAN FERNANDO (CAPITAL) (LA UNION), LA UNION | ₱99.0M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 99 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION, PHASE II, BANTAY, ILOCOS SUR | Region I | ₱98.3M | Reported complete | A P B CONST | 38 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BAYUDAN-CHICO RIVER FLOOD-EROSION CONTROL PROJECT | Cordillera Administrative Region | ₱97.5M | Reported complete | FIAT CONST SERVICES | 99 | Check in |
| Construction of Flood Control Structure, Barangay Cardona, Dolores, Abra | DOLORES (ABRA), ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 67 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF CATACDEGAN FLOOD CONTROL, MANABO, ABRA | Abra DEO | ₱96.5M | 95% reported progress | MG SAMIDAN CONST | 64 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banglolao - Labon, Bucay, Abra | BUCAY (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 66 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF LAGAYAN FLOOD CONTROL STRUCTURE, LAGAYAN, ABRA | Abra DEO | ₱96.5M | 95% reported progress | MG SAMIDAN CONST | 71 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Podayan, Patoc, Bucay, Abra | LAGANGILANG (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 64 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF KIWAS FLOOD CONTROL, LAGAYAN, ABRA | Abra DEO | ₱96.5M | 95% reported progress | MG SAMIDAN CONST | 71 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SUR | Ilocos Sur 1st DEO | ₱96.5M | 98% reported progress | 739 BUILDERS | 46 | Check in |
| Construction of Baybayatin Flood Control, Lagayan, Abra | LAGAYAN (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 71 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin (Phase II), Cabaroan, Tayum, Abra | TAYUM (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 60 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, Abra | BANGUED (CAPITAL) (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 53 | Check in |
| Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain Province | BAUKO (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE | ₱96.5M | Reported complete | MG SAMIDAN CONST / R S SEPIAN CONST & TRUCKING | 100 | Check in |
| Construction of ABIT Flood Control along Abit River, Tadian, Mountain Province | TADIAN (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE | ₱96.5M | Reported complete | OLSIM CONST / BALLIGI CONST DEVELOPMENT CORP FORMERLY:BALLIGI CONST / RODEKOM GEN CONST AND ENT | 99 | Check in |
| Construction of Manicbel Flood Control, Sallapadan, Abra | ABRA | ₱96.5M | Reported complete | 739 BUILDERS | 71 | Check in |
| Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet | BENGUET | ₱96.5M | Reported complete | RODEKOM GEN CONST AND ENT | 96 | Check in |
| CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS (VILP) - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, (RIGHT SIDE) BRGY. PUDOC EAST, TAGUDIN, ILOCOS SUR | Region I | ₱96.5M | Reported complete | A P B CONST | 74 | Check in |
| Construction of Flood Control and Drainage Structure along Payas Creek, Brgy. San Marcos, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 89 | Check in |
| Construction of Flood Control Structure along Padsan River and Tributary, Brgy. #24, Nagrebcan, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 92 | Check in |
| Construction of Flood Control Structure along Badoc River, Brgy. Bato, Badoc, Ilocos Norte | BADOC (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 64 | Check in |
| Construction of Flood Control Structure along Badoc River, Brgy. Balbaldez, Badoc, Ilocos Norte | BADOC (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 65 | Check in |
| Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 74 | Check in |
| Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Boli, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 74 | Check in |
| Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Cacanan 1, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 74 | Check in |
| Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan 2, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 75 | Check in |
| Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging 2, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 75 | Check in |
| Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 75 | Check in |
| Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 75 | Check in |
| Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Sinabaan, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 74 | Check in |
| Construction of Flood Mitigation Structure along Madungon River, both bank, barangay Bagbago, Solsona, Ilocos Norte | SOLSONA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | RCD GEN CONTRACTOR & CONST SUPPLY / A P B CONST | 94 | Check in |
| Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos Norte | NUEVA ERA (ILOCOS NORTE), ILOCOS NORTE | ₱96.5M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 75 | Check in |
| Rehabilitation of Flood Control Structure along Gantay River at Barangay Salincob, Bacnotan, La Union | BACNOTAN (LA UNION), LA UNION | ₱96.5M | Reported complete | MY BUILDERS AND CONST | 90 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin (Phase II), Bagalay, Tayum, Abra | TAYUM (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 65 | Check in |
| Construction of Flood Control along Mestizo River, Barangay Tamag, Vigan City, Ilocos Sur | CITY OF VIGAN (CAPITAL) (ILOCOS SUR), ILOCOS SUR | ₱96.5M | Reported complete | A P B CONST / AB DIAMOND23 CONST | 31 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SEAWALL, BRGY. PAGDARAOAN, CITY OF SAN FERNANDO, LA UNION | La Union 1st DEO | ₱96.5M | Reported complete | ANORE CONST | 100 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | ₱96.5M | 0% reported progress | RS RODRIGUEZ CONST & SUPPLIES | 67 | Check in |
| Construction of Pulot - Kiwas Flood Control, Lagayan, Abra | ABRA | ₱96.5M | Reported complete | SEJ CONST & AGGREGATES / EGB CONST CORP FORMERLY: EGB CONST | 70 | Check in |
| Construction of San Juan Flood Control, Manabo, Abra | ABRA | ₱96.5M | Reported complete | PHESCO INC | 64 | Check in |
| Construction of Patoc Flood Control Bucay, Abra | BUCAY (ABRA), ABRA | ₱96.5M | Reported complete | PHESCO INC | 65 | Check in |
| Construction of Patoc-Dugong Flood Control, Bucay, Abra | ABRA | ₱96.5M | Reported complete | PHESCO INC | 66 | Check in |
| Construction of Flood Control Structure, Canan - Poblacion, Barangay Canan and Poblacion, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 63 | Check in |
| CONSTRUCTION OF MALABBAGA FLOOD CONTROL, LA PAZ, ABRA | Abra DEO | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 68 | Check in |
| CONSTRUCTION OF UPPER CARDONA FLOOD CONTROL, DOLORES, ABRA | Abra DEO | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 67 | Check in |
| Construction of Canan Flood Control, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 63 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CALABA, BANGUED, | Abra DEO | ₱96.5M | 95% reported progress | NORTH TECH BUILDERS AND CONST SUPPLY | 57 | Check in |
| Construction of Buli Flood Control Structure, Buli, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 66 | Check in |
| Construction of Sidongan Flood Control Structure, Barangay Luis, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Paga, Cardona, Dolores, Abra | LAGANGILANG (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 67 | Check in |
| Construction of Pagala Flood Control, Bucay, Abra | ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 66 | Check in |
| Rechanneling of Baay River, Lagangilang Section, Lagangilang, Abra | LAGANGILANG (ABRA), ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 69 | Check in |
| Construction of Tayum Flood Control Structure, Tayum, Abra | TAYUM (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 61 | Check in |
| CONSTRUCTION OF BARBARSIC FLOOD CONTROL, SAN JUAN, ABRA | Abra DEO | ₱96.5M | Reported complete | PHESCO INC 145 | 71 | Check in |
| Construction of Sinalang Flood Control, Peñarrubia, Abra | ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 58 | Check in |
| Construction of Patiao Flood Control, Peñarrubia, Abra | ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 58 | Check in |
| Construction of Pantoc-Pakiling Flood Control, Bucay, Abra | ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 65 | Check in |
| Construction of Toon-San Gregorio Flood Control, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱96.5M | Reported complete | 739 BUILDERS | 59 | Check in |
| Construction of Wayangan Flood Control, Tubo, Abra | ABRA | ₱96.5M | Reported complete | 739 BUILDERS | 71 | Check in |
| Construction of Malanas Flood Control Structure, Culliong, San Juan, Abra | SAN JUAN (ABRA), ABRA | ₱96.5M | Reported complete | ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES | 71 | Check in |
| Construction of Malanas Flood Control Structure, Guimba and Daoidao, San Juan, Abra | SAN JUAN (ABRA), ABRA | ₱96.5M | Reported complete | ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES / UNIMAX STEEL STRUCTURE AND CONST CORP | 70 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF SAN GREGORIO FLOOD CONTROL STRUCTURE, SAN GREGORIO, LA PAZ, ABRA | Abra DEO | ₱96.5M | Reported complete | MG SAMIDAN CONST | 61 | Check in |
| CONSTRUCTION OF DEET-POBLACION FLOOD CONTROL, TAYUM, ABRA | Abra DEO | ₱96.5M | Reported complete | 739 BUILDERS | 61 | Check in |
| Construction of Flood Mitigation Structure along Maluyo River, Barangay Sablut, Balaoan, La Union | BALAOAN (LA UNION), LA UNION | ₱96.5M | Reported complete | SILVERWOLVES CONST CORP | 82 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SUR | Ilocos Sur 1st DEO | ₱96.4M | 95% reported progress | A P B CONST | 33 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. AMBALAYAT-PALLOGAN-PULA, TAGUDIN, ILOCOS SUR, STA. 0+000 - ST | Region I | ₱96.1M | Reported complete | ALPHA | 76 | Check in |
| Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, Abra | DOLORES (ABRA), ABRA | ₱95.6M | Reported complete | MG SAMIDAN CONST | 67 | Check in |
| Construction of Paga Flood Control, Dolores, Abra | DOLORES (ABRA), ABRA | ₱95.5M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| DREDGING / RECHANNELING OF ALONG SAN GREGORIO-CANAN, LAPAZ, ABRA, LA PAZ, ABRA | Abra DEO | ₱95.4M | Reported complete | PHESCO INC 145 | 60 | Check in |
| Construction of Flood Control Structure, Barangay Mudeng, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱95.2M | Reported complete | MG SAMIDAN CONST / RM30 PSG CONST CORP | 57 | Check in |
| DREDGING / RECHANNELING OF ALONG POBLACION-MALABBAGA, LAPAZ, ABRA, LA PAZ, ABRA | Abra DEO | ₱95.2M | Reported complete | PHESCO INC 145 | 67 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PALAQUIO FLOOD CONTROL STRUCTURE, BUCAY, ABRA | Abra DEO | ₱95.1M | 95% reported progress | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NANGUNEG WEST AND SAN PEDRO FLOOD CONTROL STRUCTURE, BARANGAY NANGUNEG WEST AND BARANGAY SAN PEDRO NARVACAN, ILOCOS SUR | Region I | ₱94.5M | 42% reported progress | SATRAP CONST CO INC | 41 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱94.3M | 78% reported progress | 739 BUILDERS | 66 | Check in |
| Construction of Flood Control Structure, Barangay Isit, Dolores, Abra | DOLORES (ABRA), ABRA | ₱94.1M | Reported complete | MG SAMIDAN CONST | 65 | Check in |
| Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱94.1M | Reported complete | 739 BUILDERS | 59 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY CALABA, BANGUED, ABRA | Abra DEO | ₱93.6M | 49% reported progress | 739 BUILDERS | 54 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GANTAY RIVER, BARANGAY SIPULO, BACNOTAN, LA UNION | Region I | ₱93.6M | 96% reported progress | MY BUILDERS AND CONST | 88 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SINALANG FLOOD CONTROL STRUCTURE, BANGUED, ABRA | Abra DEO | ₱92.7M | 90% reported progress | MG SAMIDAN CONST | 55 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BULI FLOOD CONTROL, LA PAZ, ABRA | Abra DEO | ₱92.5M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABOLOAN, BANGUED | Abra DEO | ₱92.5M | Reported complete | 739 BUILDERS | 54 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, PALAO, BANGUED, ABRA | Abra DEO | ₱92.3M | 90% reported progress | MG SAMIDAN CONST | 55 | Check in |
| Construction of Soot Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱92.1M | Reported complete | 739 BUILDERS | 58 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY BANGBANGAR, BANGUED, ABRA | Abra DEO | ₱91.9M | 74% reported progress | MG SAMIDAN CONST | 54 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF BUCAY FLOOD CONTROL STRUCTURE, BUCAY, ABRA | Abra DEO | ₱91.9M | Reported complete | MG SAMIDAN CONST | 66 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY BANGBANGAR, BANGUED, ABRA | Abra DEO | ₱91.7M | 85% reported progress | MG SAMIDAN CONST | 54 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABAROAN, DANGLAS | Abra DEO | ₱91.7M | 98% reported progress | MG SAMIDAN CONST | 63 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY SAN ANTONIO, BANGUED, ABRA | Abra DEO | ₱91.7M | 77% reported progress | MG SAMIDAN CONST | 54 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY MUDENG, LA PAZ, ABR | Abra DEO | ₱91.7M | 91% reported progress | 739 BUILDERS | 58 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, PAGA, MALABBAGA, LA PA | Abra DEO | ₱91.7M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY PALAO, BANGUED, ABRA | Abra DEO | ₱91.7M | 10% reported progress | 739 BUILDERS | 55 | Check in |
| Construction of Flood Control along Bantaoay River, San Vicente, Ilocos Sur | SAN VICENTE (ILOCOS SUR), ILOCOS SUR | ₱91.7M | Reported complete | A P B CONST / FIT CONST | 32 | Check in |
| Construction of Flood Control along Bungro River, Sto. Domingo, Ilocos Sur | SANTO DOMINGO (ILOCOS SUR), ILOCOS SUR | ₱91.7M | Reported complete | A P B CONST | 38 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY PALAO, BANGUED, ABRA | Abra DEO | ₱91.7M | 86% reported progress | 739 BUILDERS | 55 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MALABBAGA FLOOD CONTROL, LA PAZ, ABRA | Abra DEO | ₱91.6M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY CALABA, BANGUED, ABRA | Abra DEO | ₱91.6M | 49% reported progress | MG SAMIDAN CONST | 54 | Check in |
| REPAIR / REHABILITATION / IMPROVEMENT OF BAAC FLOOD CONTROL, LANGIDEN, ABRA | Cordillera Administrative Region | ₱91.6M | Reported complete | MONOLITHIC CONST | 52 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SINALANG RIVER, SINALANG, BANGUED, ABRA | Abra DEO | ₱91.6M | 77% reported progress | MG SAMIDAN CONST | 55 | Check in |
| Construction of Malabbaga Flood Control Structure (Phase III), Sta. 6 + 820 - Sta. 7 + 820, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱91.5M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| Construction of Flood Control Structure, Malabbaga, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱91.4M | Reported complete | MG SAMIDAN CONST | 68 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL , BATAC CITY, ILOCOS NORTE | Region I | ₱91.3M | Reported complete | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 76 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | ₱91.1M | Reported complete | ALPHA | 74 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL, BUCAY, ABRA | Abra DEO | ₱90.9M | 94% reported progress | MG SAMIDAN CONST | 68 | Check in |