Typhoon mode · September 5, 2025 – September 9, 2025

Tapah (Lannie) 2025

1,560 DPWH flood-control projects worth ₱64.11B sit within 100 km of this storm’s track. Peak sustained wind 64 kt (119 km/h, 1-minute average). Being on this list says nothing about a project’s quality. It is where photos after the storm are most useful.

Send a check-in photo

Track and projects

Red line: storm centre (best track). Shaded band: 100 km around the track (median 34-kt wind radius near the Philippines, or 100 km where radii were not reported). Blue dots: projects with DPWH coordinates.

Projects in path

1,560

Contract value

₱64.11B

Reported complete

1,248

Ongoing or not reported

312

Largest contractors in the path

  1. MG SAMIDAN CONST98 · ₱10.88B
  2. ST TIMOTHY CONST CORP61 · ₱3.48B
  3. 739 BUILDERS79 · ₱3.38B
  4. MEGAPOLITAN BUILDERS AND CONST SUPPLY64 · ₱2.86B
  5. TOKWING CONST CORP FOR TOKWING CONSTRUC3 · ₱2.26B
  6. A P B CONST46 · ₱1.71B
  7. NORTH TECH BUILDERS AND CONST SUPPLY59 · ₱1.67B
  8. FIRST NORTHWAY DEVELOPMENT60 · ₱1.62B
  9. VIKING CONST40 · ₱1.31B
  10. BJMJB CONST53 · ₱1.17B

By DPWH implementing office

  1. Abra DEO217 · ₱14.15B
  2. ABRA105 · ₱7.65B
  3. ILOCOS NORTE130 · ₱6.00B
  4. Region I97 · ₱5.94B
  5. Ilocos Norte 1st DEO279 · ₱5.70B
  6. Flood Control Management Cluster6 · ₱4.50B
  7. ILOCOS SUR135 · ₱4.39B
  8. Ilocos Norte 2nd DEO138 · ₱3.84B
  9. Ilocos Sur 1st DEO163 · ₱3.43B
  10. Ilocos Sur 2nd DEO146 · ₱3.34B
  11. LA UNION28 · ₱1.83B
  12. La Union 1st DEO83 · ₱1.80B

Satellite before and after

Largest projects in the path with archived imagery. Imagery dates are before and after the contract, not the storm. They are not proof of completion.

Imagery © Esri, Maxar, Earthstar Geographics, and the GIS User Community (World Imagery Wayback).

Projects to check (largest 1,500 of 1,560)

Near one of these? Open the project and use “Check in” to add a dated photo. Faces and plates are blurred automatically.

ProjectPlaceCostStatusContractorkm from track
REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC92Check in
REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC94Check in
CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRAFlood Control Management Cluster₱853.1MReported completeRAYMAN BUILDERS INC64Check in
CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱715.1M94% reported progressMSB VITUG CONST66Check in
REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱669.3MReported completeE M CUERPO INC93Check in
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱533.8M94% reported progressTOKWING CONST CORP FOR TOKWING CONSTRUC84Check in
Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos SurSANTA CATALINA (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST28Check in
Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos SurTAGUDIN (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST74Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B)Region I₱198.0MReported completeALPHA76Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B)Region I₱198.0M95% reported progressKATHA BUILDERS & SUPPLIES INC77Check in
Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos NorteSAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE₱193.0MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST86Check in
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTERegion I₱173.0MReported completeBADOC BUILDERS92Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2)Region I₱157.3MReported completeA I P CONST76Check in
Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR₱157.3MReported completeA I P CONST74Check in
Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnionSAN JUAN (LA UNION), LA UNION₱154.4MReported completeBALINTUGAN CONST96Check in
Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La UnionSAN GABRIEL (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST98Check in
Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnionBACNOTAN (LA UNION), LA UNION₱154.4MReported completeRODEKOM GEN CONST AND ENT92Check in
Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La UnionSAN GABRIEL (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST96Check in
Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La UnionSAN JUAN (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST98Check in
CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRAAbra DEO₱148.5M92% reported progressMG SAMIDAN CONST69Check in
Construction of Salangsang Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱148.5MReported completeMG SAMIDAN CONST60Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNIONRegion I₱146.3M35% reported progressST MATTHEW GEN CONTRACTOR92Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M91% reported progressA I P CONST73Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M89% reported progressA I P CONST77Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLORAbra DEO₱144.8M84% reported progressMG SAMIDAN CONST67Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRAAbra DEO₱144.8MReported completeMG SAMIDAN CONST84Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRAAbra DEO₱144.8M87% reported progressMG SAMIDAN CONST66Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, AbraLAGANGILANG (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST68Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, AbraLUBA (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST67Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, AbraMANABO (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST64Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRAAbra DEO₱144.8M84% reported progressMG SAMIDAN CONST52Check in
Construction of Pudok Flood Control (Phase 2), Tayum, AbraTAYUM (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST62Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRAAbra DEO₱144.8MReported completeMG SAMIDAN CONST55Check in
Construction of Deet-Pudok Flood Control Structure, Tayum, AbraTAYUM (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST61Check in
Construction of Toon-San Gregorio Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱144.7MReported complete739 BUILDERS59Check in
Construction of Naguillan Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST / RM30 PSG CONST CORP59Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRAAbra DEO₱144.7M93% reported progressMG SAMIDAN CONST81Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRAAbra DEO₱144.7M95% reported progressMG SAMIDAN CONST66Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN,Abra DEO₱144.7M93% reported progressMG SAMIDAN CONST53Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNIONRegion I₱144.7M73% reported progressSILVERWOLVES CONST CORP90Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. JARDIN - TARANGOTONG, TAGUDIN, ILOCOS SUR, STA 8+118 - STA 9Region I₱144.7MReported completeGEMMA CONST SUPPLY INC FORMERLY:GEMMA CON71Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGDARAOAN, SAN FERNANDO CITY, LA UNIONRegion I₱144.7M91% reported progressSILVERWOLVES CONST CORP99Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, AbraDOLORES (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST64Check in
Construction of Poblacion-Deet Flood Control along Abra River, Tayum, AbraTAYUM (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST / TWINFORMERS CONST SERVICES61Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MUDIIT FLOOD CONTROL ALONG ABRA RIVER, MUDIIT, DOLORES, ABRAAbra DEO₱144.6M92% reported progressMG SAMIDAN CONST67Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUCAbra DEO₱142.8M96% reported progressMG SAMIDAN CONST68Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTEIlocos Norte 2nd DEO₱141.9M72% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY74Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 1, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTEIlocos Norte 2nd DEO₱141.9M75% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY74Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BARANGAY STA. ANA, SOLSONA, ILOCOS NORTEIlocos Norte 2nd DEO₱141.4M61% reported progressEUS CONST97Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTERegion I₱140.4M0% reported progressA B TAYLAN CONST & DEVT FORMERLY: ADSM CONST85Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRAAbra DEO₱140.3M86% reported progressMG SAMIDAN CONST67Check in
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL, LAOAG CITY, ILOCOS NORTEIlocos Norte 1st DEO₱139.0M19% reported progressA B TAYLAN CONST93Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION,Abra DEO₱139.0M90% reported progressMG SAMIDAN CONST65Check in
CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRAAbra DEO₱139.0M95% reported progressMG SAMIDAN CONST59Check in
CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRAAbra DEO₱138.9M85% reported progressMG SAMIDAN CONST71Check in
CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRAAbra DEO₱138.9M95% reported progressMG SAMIDAN CONST63Check in
CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRAAbra DEO₱138.9M96% reported progressMG SAMIDAN CONST67Check in
CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRAAbra DEO₱138.8M21% reported progressMG SAMIDAN CONST64Check in
CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRAAbra DEO₱138.8M80% reported progressMG SAMIDAN CONST99Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF CABARUYAN FLOOD CONTROL, CABARUYAN, DAGUIOMAN, ABRAAbra DEO₱138.7M94% reported progressMG SAMIDAN CONST86Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY LIAbra DEO₱138.5M93% reported progressMG SAMIDAN CONST60Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRAAbra DEO₱138.3MReported completeMG SAMIDAN CONST53Check in
CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRAAbra DEO₱138.2M95% reported progressMG SAMIDAN CONST62Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BAAbra DEO₱138.1M95% reported progress739 BUILDERS68Check in
CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRAAbra DEO₱138.0M40% reported progressMG SAMIDAN CONST56Check in
CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRAAbra DEO₱137.8M95% reported progressMG SAMIDAN CONST58Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF MAGMAGUEY FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱137.7M97% reported progressMG SAMIDAN CONST65Check in
CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRAAbra DEO₱137.7M47% reported progressMG SAMIDAN CONST56Check in
CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRAAbra DEO₱137.6M91% reported progressMG SAMIDAN CONST68Check in
CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRAAbra DEO₱137.6M76% reported progressMG SAMIDAN CONST72Check in
CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRAAbra DEO₱137.6M95% reported progressMG SAMIDAN CONST56Check in
CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRAAbra DEO₱137.6M91% reported progressMG SAMIDAN CONST68Check in
CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRAAbra DEO₱137.6M23% reported progressMG SAMIDAN CONST73Check in
CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRAAbra DEO₱137.6M0% reported progressMG SAMIDAN CONST71Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL ALONG ABRA RIVER, BANGBANGCAG, BUCAY, ABRAAbra DEO₱137.5MReported completeMG SAMIDAN CONST68Check in
CONSTRUCTION OF BAGATOY FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱137.5M89% reported progressMG SAMIDAN CONST66Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY SAN GREGORIO,Abra DEO₱137.5M85% reported progressMG SAMIDAN CONST59Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF LAGAYAN FLOOD CONTROL (PHASE 2), LAGAYAN, ABRAAbra DEO₱137.5M99% reported progressMG SAMIDAN CONST71Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF NAGTUPACAN FLOOD CONTROL ALONG ABRA RIVER, NAGTUPACAN, LAGANGILANG, ABRAAbra DEO₱137.5M90% reported progressMG SAMIDAN CONST69Check in
CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRAAbra DEO₱137.5M75% reported progressMG SAMIDAN CONST55Check in
CONSTRUCTION OF NAGTUPACAN-ISIT FLOOD CONTROL, DOLORES, ABRAAbra DEO₱137.5MReported completeMG SAMIDAN CONST63Check in
CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRAAbra DEO₱136.2M80% reported progressMG SAMIDAN CONST92Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI-DAGSIAN FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱135.9M81% reported progressMG SAMIDAN CONST64Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY CAAbra DEO₱135.1M84% reported progressMG SAMIDAN CONST63Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURES (AMBURAYAN RIVER), MINDORO, BANGAR, LA UNIONRegion I₱126.2MReported completeH G LOPEZ CONST74Check in
Rehabilitation of Flood Control Structure On Scoured and Eroded River Bank along Badoc River, barangay Las-ud and San Julian, Badoc, Ilocos NorteBADOC (ILOCOS NORTE), ILOCOS NORTE₱125.4MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP63Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, BARANGAY MABALENG, BATAC CITY, ILOCOS NORTERegion I₱122.7M75% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY74Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, BATAC CITY, ILOCOS NORTERegion I₱115.8MReported completeMEGAPOLITAN BUILDERS AND CONST SUPPLY78Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTERegion I₱115.8MReported completeRCD GEN CONTRACTOR & CONST SUPPLY76Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. BIO-BUCAO - EAST BUCAO - WEST-SAN MIGUEL, TAGUDIN, ILOCOS SURegion I₱115.8MReported completeA P B CONST75Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF SWIP, BARANGAY CAMANDINGAN, CITY OF BATAC, ILOCOS NORTERegion I₱112.3M0% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY84Check in
DISASTER-RELATED AND EMERGENCY REHABILITATION - FLOOD CONTROL SYSTEMS 1.) RECOVERY/RECONSTRUCTION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA 2.) REPAIR/REHABILITATION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRACordillera Administrative Region₱112.3M26% reported progressS D PLATON CONST INC68Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SURIlocos Sur 1st DEO₱112.3M95% reported progress739 BUILDERS36Check in
SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVERBANK PROTECTION AT NANGUNEG WEST AND SAN PEDRO, NARVACAN, ILOCOS SURIlocos Sur 2nd DEO₱112.3M60% reported progressSATRAP CONST CO INC41Check in
Construction of Flood Control Structure along Quiaoit River (Upstream of Barsa Bridge), Sitio Barsa, barangay Nalasin, Paoay, Ilocos NortePAOAY (ILOCOS NORTE), ILOCOS NORTE₱106.1MReported completeST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP78Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTERegion I₱106.1M67% reported progressAMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP90Check in
Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos SurSANTA (ILOCOS SUR), ILOCOS SUR₱104.2MReported completeBET CONST & SUPPLY / M G LUALHATI CONST CORP34Check in
Rehabilitation of Flood Control along Galpac Creek, Paoay, Ilocos NortePAOAY (ILOCOS NORTE), ILOCOS NORTE₱99.0MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY74Check in
Construction of Bato Creek Slope Protection, City of San Fernando, La UnionCITY OF SAN FERNANDO (CAPITAL) (LA UNION), LA UNION₱99.0MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST99Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION, PHASE II, BANTAY, ILOCOS SURRegion I₱98.3MReported completeA P B CONST38Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BAYUDAN-CHICO RIVER FLOOD-EROSION CONTROL PROJECTCordillera Administrative Region₱97.5MReported completeFIAT CONST SERVICES99Check in
Construction of Flood Control Structure, Barangay Cardona, Dolores, AbraDOLORES (ABRA), ABRA₱96.5MReported completeST TIMOTHY CONST CORP67Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF CATACDEGAN FLOOD CONTROL, MANABO, ABRAAbra DEO₱96.5M95% reported progressMG SAMIDAN CONST64Check in
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banglolao - Labon, Bucay, AbraBUCAY (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST66Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF LAGAYAN FLOOD CONTROL STRUCTURE, LAGAYAN, ABRAAbra DEO₱96.5M95% reported progressMG SAMIDAN CONST71Check in
Construction of Flood Control Structure along Abra Major River Basin, Podayan, Patoc, Bucay, AbraLAGANGILANG (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST64Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF KIWAS FLOOD CONTROL, LAGAYAN, ABRAAbra DEO₱96.5M95% reported progressMG SAMIDAN CONST71Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BICAL RIVER, SAN JUAN, ILOCOS SURIlocos Sur 1st DEO₱96.5M98% reported progress739 BUILDERS46Check in
Construction of Baybayatin Flood Control, Lagayan, AbraLAGAYAN (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST71Check in
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Cabaroan, Tayum, AbraTAYUM (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST60Check in
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, AbraBANGUED (CAPITAL) (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST53Check in
Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain ProvinceBAUKO (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE₱96.5MReported completeMG SAMIDAN CONST / R S SEPIAN CONST & TRUCKING100Check in
Construction of ABIT Flood Control along Abit River, Tadian, Mountain ProvinceTADIAN (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE₱96.5MReported completeOLSIM CONST / BALLIGI CONST DEVELOPMENT CORP FORMERLY:BALLIGI CONST / RODEKOM GEN CONST AND ENT99Check in
Construction of Manicbel Flood Control, Sallapadan, AbraABRA₱96.5MReported complete739 BUILDERS71Check in
Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, BenguetBENGUET₱96.5MReported completeRODEKOM GEN CONST AND ENT96Check in
CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS (VILP) - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, (RIGHT SIDE) BRGY. PUDOC EAST, TAGUDIN, ILOCOS SURRegion I₱96.5MReported completeA P B CONST74Check in
Construction of Flood Control and Drainage Structure along Payas Creek, Brgy. San Marcos, San Nicolas, Ilocos NorteSAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeMEGAPOLITAN BUILDERS AND CONST SUPPLY89Check in
Construction of Flood Control Structure along Padsan River and Tributary, Brgy. #24, Nagrebcan, San Nicolas, Ilocos NorteSAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeMEGAPOLITAN BUILDERS AND CONST SUPPLY92Check in
Construction of Flood Control Structure along Badoc River, Brgy. Bato, Badoc, Ilocos NorteBADOC (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP64Check in
Construction of Flood Control Structure along Badoc River, Brgy. Balbaldez, Badoc, Ilocos NorteBADOC (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP65Check in
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST74Check in
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Boli, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST74Check in
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Cacanan 1, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST74Check in
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan 2, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP75Check in
Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging 2, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP75Check in
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP75Check in
Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP75Check in
Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Sinabaan, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST TIMOTHY CONST CORP74Check in
Construction of Flood Mitigation Structure along Madungon River, both bank, barangay Bagbago, Solsona, Ilocos NorteSOLSONA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeRCD GEN CONTRACTOR & CONST SUPPLY / A P B CONST94Check in
Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos NorteNUEVA ERA (ILOCOS NORTE), ILOCOS NORTE₱96.5MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST75Check in
Rehabilitation of Flood Control Structure along Gantay River at Barangay Salincob, Bacnotan, La UnionBACNOTAN (LA UNION), LA UNION₱96.5MReported completeMY BUILDERS AND CONST90Check in
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Bagalay, Tayum, AbraTAYUM (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST65Check in
Construction of Flood Control along Mestizo River, Barangay Tamag, Vigan City, Ilocos SurCITY OF VIGAN (CAPITAL) (ILOCOS SUR), ILOCOS SUR₱96.5MReported completeA P B CONST / AB DIAMOND23 CONST31Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SEAWALL, BRGY. PAGDARAOAN, CITY OF SAN FERNANDO, LA UNIONLa Union 1st DEO₱96.5MReported completeANORE CONST100Check in
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2)Region I₱96.5M0% reported progressRS RODRIGUEZ CONST & SUPPLIES67Check in
Construction of Pulot - Kiwas Flood Control, Lagayan, AbraABRA₱96.5MReported completeSEJ CONST & AGGREGATES / EGB CONST CORP FORMERLY: EGB CONST70Check in
Construction of San Juan Flood Control, Manabo, AbraABRA₱96.5MReported completePHESCO INC64Check in
Construction of Patoc Flood Control Bucay, AbraBUCAY (ABRA), ABRA₱96.5MReported completePHESCO INC65Check in
Construction of Patoc-Dugong Flood Control, Bucay, AbraABRA₱96.5MReported completePHESCO INC66Check in
Construction of Flood Control Structure, Canan - Poblacion, Barangay Canan and Poblacion, La Paz, AbraLA PAZ (ABRA), ABRA₱96.5MReported completeST TIMOTHY CONST CORP63Check in
CONSTRUCTION OF MALABBAGA FLOOD CONTROL, LA PAZ, ABRAAbra DEO₱96.5MReported completeST TIMOTHY CONST CORP68Check in
CONSTRUCTION OF UPPER CARDONA FLOOD CONTROL, DOLORES, ABRAAbra DEO₱96.5MReported completeST TIMOTHY CONST CORP67Check in
Construction of Canan Flood Control, La Paz, AbraLA PAZ (ABRA), ABRA₱96.5MReported completeST TIMOTHY CONST CORP63Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CALABA, BANGUED,Abra DEO₱96.5M95% reported progressNORTH TECH BUILDERS AND CONST SUPPLY57Check in
Construction of Buli Flood Control Structure, Buli, La Paz, AbraLA PAZ (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST66Check in
Construction of Sidongan Flood Control Structure, Barangay Luis, La Paz, AbraLA PAZ (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST68Check in
Construction of Flood Control Structure along Abra Major River Basin, Paga, Cardona, Dolores, AbraLAGANGILANG (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST67Check in
Construction of Pagala Flood Control, Bucay, AbraABRA₱96.5MReported completeST TIMOTHY CONST CORP66Check in
Rechanneling of Baay River, Lagangilang Section, Lagangilang, AbraLAGANGILANG (ABRA), ABRA₱96.5MReported completeST TIMOTHY CONST CORP69Check in
Construction of Tayum Flood Control Structure, Tayum, AbraTAYUM (ABRA), ABRA₱96.5MReported completeMG SAMIDAN CONST61Check in
CONSTRUCTION OF BARBARSIC FLOOD CONTROL, SAN JUAN, ABRAAbra DEO₱96.5MReported completePHESCO INC 14571Check in
Construction of Sinalang Flood Control, Peñarrubia, AbraABRA₱96.5MReported completeST TIMOTHY CONST CORP58Check in
Construction of Patiao Flood Control, Peñarrubia, AbraABRA₱96.5MReported completeST TIMOTHY CONST CORP58Check in
Construction of Pantoc-Pakiling Flood Control, Bucay, AbraABRA₱96.5MReported completeST TIMOTHY CONST CORP65Check in
Construction of Toon-San Gregorio Flood Control, La Paz, AbraLA PAZ (ABRA), ABRA₱96.5MReported complete739 BUILDERS59Check in
Construction of Wayangan Flood Control, Tubo, AbraABRA₱96.5MReported complete739 BUILDERS71Check in
Construction of Malanas Flood Control Structure, Culliong, San Juan, AbraSAN JUAN (ABRA), ABRA₱96.5MReported completeROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES71Check in
Construction of Malanas Flood Control Structure, Guimba and Daoidao, San Juan, AbraSAN JUAN (ABRA), ABRA₱96.5MReported completeROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES / UNIMAX STEEL STRUCTURE AND CONST CORP70Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF SAN GREGORIO FLOOD CONTROL STRUCTURE, SAN GREGORIO, LA PAZ, ABRAAbra DEO₱96.5MReported completeMG SAMIDAN CONST61Check in
CONSTRUCTION OF DEET-POBLACION FLOOD CONTROL, TAYUM, ABRAAbra DEO₱96.5MReported complete739 BUILDERS61Check in
Construction of Flood Mitigation Structure along Maluyo River, Barangay Sablut, Balaoan, La UnionBALAOAN (LA UNION), LA UNION₱96.5MReported completeSILVERWOLVES CONST CORP82Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAGPAT, BANTAY, ILOCOS SURIlocos Sur 1st DEO₱96.4M95% reported progressA P B CONST33Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. AMBALAYAT-PALLOGAN-PULA, TAGUDIN, ILOCOS SUR, STA. 0+000 - STRegion I₱96.1MReported completeALPHA76Check in
Construction of Cardona Flood Control Structure, Barangay Cardona, Dolores, AbraDOLORES (ABRA), ABRA₱95.6MReported completeMG SAMIDAN CONST67Check in
Construction of Paga Flood Control, Dolores, AbraDOLORES (ABRA), ABRA₱95.5MReported completeMG SAMIDAN CONST68Check in
DREDGING / RECHANNELING OF ALONG SAN GREGORIO-CANAN, LAPAZ, ABRA, LA PAZ, ABRAAbra DEO₱95.4MReported completePHESCO INC 14560Check in
Construction of Flood Control Structure, Barangay Mudeng, La Paz, AbraLA PAZ (ABRA), ABRA₱95.2MReported completeMG SAMIDAN CONST / RM30 PSG CONST CORP57Check in
DREDGING / RECHANNELING OF ALONG POBLACION-MALABBAGA, LAPAZ, ABRA, LA PAZ, ABRAAbra DEO₱95.2MReported completePHESCO INC 14567Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PALAQUIO FLOOD CONTROL STRUCTURE, BUCAY, ABRAAbra DEO₱95.1M95% reported progressMG SAMIDAN CONST68Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NANGUNEG WEST AND SAN PEDRO FLOOD CONTROL STRUCTURE, BARANGAY NANGUNEG WEST AND BARANGAY SAN PEDRO NARVACAN, ILOCOS SURRegion I₱94.5M42% reported progressSATRAP CONST CO INC41Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱94.3M78% reported progress739 BUILDERS66Check in
Construction of Flood Control Structure, Barangay Isit, Dolores, AbraDOLORES (ABRA), ABRA₱94.1MReported completeMG SAMIDAN CONST65Check in
Construction of Flood Control Structure, Coribot, Barangay Mudeng, La Paz, AbraLA PAZ (ABRA), ABRA₱94.1MReported complete739 BUILDERS59Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY CALABA, BANGUED, ABRAAbra DEO₱93.6M49% reported progress739 BUILDERS54Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GANTAY RIVER, BARANGAY SIPULO, BACNOTAN, LA UNIONRegion I₱93.6M96% reported progressMY BUILDERS AND CONST88Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SINALANG FLOOD CONTROL STRUCTURE, BANGUED, ABRAAbra DEO₱92.7M90% reported progressMG SAMIDAN CONST55Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BULI FLOOD CONTROL, LA PAZ, ABRAAbra DEO₱92.5MReported completeMG SAMIDAN CONST68Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABOLOAN, BANGUEDAbra DEO₱92.5MReported complete739 BUILDERS54Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, PALAO, BANGUED, ABRAAbra DEO₱92.3M90% reported progressMG SAMIDAN CONST55Check in
Construction of Soot Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱92.1MReported complete739 BUILDERS58Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY BANGBANGAR, BANGUED, ABRAAbra DEO₱91.9M74% reported progressMG SAMIDAN CONST54Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF BUCAY FLOOD CONTROL STRUCTURE, BUCAY, ABRAAbra DEO₱91.9MReported completeMG SAMIDAN CONST66Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY BANGBANGAR, BANGUED, ABRAAbra DEO₱91.7M85% reported progressMG SAMIDAN CONST54Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABAROAN, DANGLASAbra DEO₱91.7M98% reported progressMG SAMIDAN CONST63Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY SAN ANTONIO, BANGUED, ABRAAbra DEO₱91.7M77% reported progressMG SAMIDAN CONST54Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY MUDENG, LA PAZ, ABRAbra DEO₱91.7M91% reported progress739 BUILDERS58Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, PAGA, MALABBAGA, LA PAAbra DEO₱91.7MReported completeMG SAMIDAN CONST68Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY PALAO, BANGUED, ABRAAbra DEO₱91.7M10% reported progress739 BUILDERS55Check in
Construction of Flood Control along Bantaoay River, San Vicente, Ilocos SurSAN VICENTE (ILOCOS SUR), ILOCOS SUR₱91.7MReported completeA P B CONST / FIT CONST32Check in
Construction of Flood Control along Bungro River, Sto. Domingo, Ilocos SurSANTO DOMINGO (ILOCOS SUR), ILOCOS SUR₱91.7MReported completeA P B CONST38Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY PALAO, BANGUED, ABRAAbra DEO₱91.7M86% reported progress739 BUILDERS55Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MALABBAGA FLOOD CONTROL, LA PAZ, ABRAAbra DEO₱91.6MReported completeMG SAMIDAN CONST68Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE II, BARANGAY CALABA, BANGUED, ABRAAbra DEO₱91.6M49% reported progressMG SAMIDAN CONST54Check in
REPAIR / REHABILITATION / IMPROVEMENT OF BAAC FLOOD CONTROL, LANGIDEN, ABRACordillera Administrative Region₱91.6MReported completeMONOLITHIC CONST52Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SINALANG RIVER, SINALANG, BANGUED, ABRAAbra DEO₱91.6M77% reported progressMG SAMIDAN CONST55Check in
Construction of Malabbaga Flood Control Structure (Phase III), Sta. 6 + 820 - Sta. 7 + 820, La Paz, AbraLA PAZ (ABRA), ABRA₱91.5MReported completeMG SAMIDAN CONST68Check in
Construction of Flood Control Structure, Malabbaga, La Paz, AbraLA PAZ (ABRA), ABRA₱91.4MReported completeMG SAMIDAN CONST68Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL , BATAC CITY, ILOCOS NORTERegion I₱91.3MReported completeMEGAPOLITAN BUILDERS AND CONST SUPPLY76Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTERegion I₱91.1MReported completeALPHA74Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL, BUCAY, ABRAAbra DEO₱90.9M94% reported progressMG SAMIDAN CONST68Check in
Share card: Tapah (Lannie) 2025: flood-control projects in its path

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Track: IBTrACS v04r01, NOAA National Centers for Environmental Information (Knapp et al., 2010), including JTWC data. Recent storms use provisional tracks that may change. Local name assigned by PAGASA. Projects: DPWH flood-control project list; distance is from the project’s reported coordinates to the track line.