Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24HF0008 and 23HF0021 have near-identical descriptions about 138 m apart (funding years 2023, 2024; ₱19.50M, ₱19.40M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or expansion of the previous year's work at the same site.

Public record entityRehabilitation of Flood Mitigation Structure at Combado River, Barangay Cantuod, Balamban, Cebu
LocationBALAMBAN (CEBU), CEBU, Region VIIContract 23HF0021
Amount₱19,403,655.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Flood Mitigation Structure at Combado River, Barangay Cantuod, Balamban, Cebu23HF0021Flood control100%July 29, 2023July 28, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 2, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23HF0021",
  "fundingYear": 2023,
  "municipality": "BALAMBAN (CEBU)",
  "distanceMeters": 137.83765618329434,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuBalambanCantuod
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Active fault13.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.