Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22AE0023 and 23AE0012 have near-identical descriptions about 417 m apart (funding years 2022, 2023; ₱48.02M, ₱49.00M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or expansion of the first, or covers additional repairs not included in the initial contract.

Public record entityRehabilitation of Baroro River Control, barangay Dangdangla, San Juan, La Union
LocationSAN JUAN (LA UNION), LA UNION, Region IContract 23AE0012
Amount₱48,998,252.87 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Baroro River Control, barangay Dangdangla, San Juan, La Union23AE0012Flood control100%October 3, 2023August 24, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 10, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23AE0012",
  "fundingYear": 2023,
  "municipality": "SAN JUAN (LA UNION)",
  "distanceMeters": 417.0732723084327,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)La UnionSan JuanDangdangla
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Tapah 2025
Hazard exposure
Active fault18.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.