Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23GK0001 was awarded at 100.00% of its ABC. Across its 33 recorded contracts, JAIME B CHING ENT was awarded at ≥99.5% of ABC 32 times (97.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor consistently bids very close to the ABC to maximize their chances of winning within legal limits.

Public record entityConstruction of Flood Control Structure with Esplanade of Himoga-an River, Sagay City, Negros Occidental
LocationSAGAY CITY (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VIContract 23GK0001
Amount₱86,848,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure with Esplanade of Himoga-an River, Sagay City, Negros Occidental23GK0001Flood control100%March 14, 2024March 14, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 14, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Occidental 1st District Engineering Office",
  "ratio": 0.9999770382253024,
  "abcPhp": 86849994.23,
  "threshold": 0.995,
  "contractId": "23GK0001",
  "contractor": "JAIME B CHING ENT",
  "contractCostPhp": 86848000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Structure with Esplanade of Himoga-an River, Sagay City, Negros Occidental.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/bd84f8f2-d0bc-4c7a-b2bb-f9c568e6eb1f

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OccidentalCity of SagayFabrica
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Active fault23.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.