Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Masbate 2nd District Engineering Office awarded 28 of 28 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 5.4e-05), across 19 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This may be due to consistently competitive bidding or precise cost estimation practices in the office.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Masbate 2nd District Engineering Office: contracts
28 of 28 contracts (100%) at ≥99.5% of ABC · peer baseline 70.4% · gap +29.6 pts · binomial p = 5.4e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 21FI0038 | Construction of Flood Control System, Batuila River, Brgy. Batuila, Baleno, Masbate | EBARAM GEN CONST & SUPPLY | 100.00% | DPWH |
| 22FI0003 | Rehabilitation/Improvement of Narangasan River Control, Milagros, Masbate | GACT ENT | 100.00% | DPWH |
| 21FI0041 | Construction of Flood Control Mitigation Facilities along Manulib River, Milagros, Masbate | 3R3M CONST AND SUPPLY CORP FORMERLY: 3R3M CONST AND SUPPLY | 100.00% | DPWH |
| 23FI0015 | Construction of Flood Protection Measures along Sinalogan River, Brgy. Asid, Masbate City | RED DIAMOND CONST AND SUPPLY CORP FORMERLY: RED DIAMOND CONST | 100.00% | DPWH |
| 23FI0003 | Construction of Flood Control System along Bangon River, Sta. 0+217.00 - Sta. 0+307.00 (Upstream, Right Side), Sta. 0+244.00 - Sta. 0+307.00 (Upstream, Left Sid | RED DIAMOND CONST AND SUPPLY CORP FORMERLY: RED DIAMOND CONST | 100.00% | DPWH |
| 22FI0041 | Construction of Poblacion East Seawall, Milagros, Masbate | YAKAL CONST | 100.00% | DPWH |
| 23FI0022 | Construction of Poblacion West Seawall, Sta. 0+114.00 - Sta. 0+217.00, Milagros, Masbate | HKP CONST AND SUPPLY / DSB CONST & SUPPLY INC FORMERLY: DSB CO | 100.00% | DPWH |
| 23FI0002 | Construction of Poblacion East Seawall, Sta. 0+250.00 - Sta. 0+322.00, Milagros, Masbate | HKP CONST AND SUPPLY / DSB CONST & SUPPLY INC FORMERLY: DSB CO | 100.00% | DPWH |
| 23FI0024 | Construction of Calasuche Seawall, Sta. 1+286.90.00 - Sta. 1+361.90, Milagros, Masbate | SPRING STAR CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0039 | Construction of Calasuche Seawall, Milagros, Masbate | HGG BUILDERS & SUPPLY | 100.00% | DPWH |
| 23FI0032 | Construction of Flood Protection Measures along Sinalogan River, Brgy. Cayabon, Milagros, Masbate | NEXT GENERATION CONST AND SUPPLY CORP | 100.00% | DPWH |
| 23FI0008 | Construction of Flood Control System along Lumbang River, Sta. 4+185.00 - Sta. 4+360.00 (Upstream, Both Sides), Masbate City, Masbate | HKP CONST AND SUPPLY / A3 CONST & SUPPLY | 100.00% | DPWH |
| 23FI0017 | Construction of Flood Control System along Batuila River, Sta. 0+143.40 - Sta. 0+323.40 (Upstream, Both Sides), Baleno, Masbate | SPRING STAR CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0040 | Construction of Milagros Seawall and Boulevard, Milagros, Masbate | HGG BUILDERS & SUPPLY | 100.00% | DPWH |
| 23FI0030 | Construction of Milagros Seawall, Sta. 0+217.00 - Sta. 0+340.50, Milagros, Masbate | HKP CONST AND SUPPLY / DSB CONST & SUPPLY INC FORMERLY: DSB CO | 100.00% | DPWH |
| 22FI0024 | Construction of Poblacion Balud Seawall, Balud, Masbate | LEGACY BSCA CONST AND SUPPLY CORP | 100.00% | DPWH |
| 23FI0016 | Construction of Flood Control System along Bañadero River, Sta. 4+222.00 - Sta. 4+550.00 (Upstream, Right Side), Mobo, Masbate | A3 CONST & SUPPLY / EJ CANTORIA CONST & SUPPLY | 100.00% | DPWH |
| 24FI0030 | Construction of Flood Control Structure, Asid River, Masbate City, Masbate | C L CARANDANG ENT / A3 CONST & SUPPLY | 100.00% | DPWH |
| 24FI0063 | Construction of Flood Mitigation Structure, Barangay Quinyangan Diotay, Balud, Masbate | NEXT GENERATION CONST AND SUPPLY CORP / 3R3M CONST AND SUPPLY CORP FORMERLY: 3R3M CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0012 | Rehabilitation/Improvement of Asid River Control, Masbate City and Milagros, Masbate | HKP CONST AND SUPPLY | 100.00% | DPWH |
| 24FI0061 | Construction of Flood Mitigation Structure, Barangay Mabuhay, Balud, Masbate | HKP CONST AND SUPPLY / A3 CONST & SUPPLY | 100.00% | DPWH |
| 24FI0036 | Construction of Flood Mitigation Structure, Barangay Jamorawon, Milagros, Masbate | HKP CONST AND SUPPLY / A3 CONST & SUPPLY | 100.00% | DPWH |
| 21FI0037 | Construction of Flood Control System, Brgy. Bangon, Aroroy, Masbate | VAEMAR CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0038 | Rehabilitation/Improvement of Bon-bon River Control, Milagros, Masbate | SPRING STAR CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0013 | Rehabilitation/Improvement of Manulib River Control, Milagros, Masbate | 3R3M CONST AND SUPPLY CORP FORMERLY: 3R3M CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0036 | Rehabilitation/Improvement of Tugbo River Control, Masbate City and Mobo, Masbate | ARKY CONST AND SUPPLY | 100.00% | DPWH |
| 22FI0037 | Construction of Seawall, Poblacion, Aroroy, Masbate | JOHNCB CONST & SUPPLIES | 100.00% | DPWH |
| 22FI0025 | Rehabilitation/Improvement of Lanang River Control, Aroroy, Masbate | A3 CONST & SUPPLY | 99.99% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Masbate 2nd District Engineering Office",
"nearAbc": 28,
"trigger": "office_pattern_aggregate",
"officeId": "d163017e-d8b8-5e90-8999-62f2f9a2585c",
"threshold": 0.995,
"binomialTailP": 0.00005397276569519688,
"nearAbcRatePct": 100,
"totalContracts": 28,
"baselineRatePct": 70.4,
"excessPctPoints": 29.6,
"expectedNearAbc": 19.7,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
Possible Innocent Explanations
- This may be due to consistently competitive bidding or precise cost estimation practices in the office.