Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: L R TIQUI BUILDERS INC holds 52 flood-control contracts worth ₱4.56B, 4.49× the 95th-percentile contractor total (₱1.01B); up to 28 ran at the same time. This is a capacity question worth examining. The contractor may have unusually high capacity or specialization in flood-control projects.

Public record entityL R TIQUI BUILDERS INCOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 40Ongoing: 0Delayed: 0Status unknown: 0
Show 34 more projects in this bucket
Construction of Flood Control Structure along Bulo River, Sta. 13+600 - Sta. 14+200, Sta. Lucia, San Miguel, Bulacan22CD0159Flood control100%June 23, 2023May 26, 2023—completedsumbong source
Construction of Flood Control Structure along Bulo River, Sta. 14+200 - Sta. 14+800, Sta. Lucia, San Miguel, Bulacan22CD0160Flood control100%June 23, 2023April 18, 2023—completedsumbong source
Construction of Flood Control Structure along Santa Maria River and Its Tributaries, Sta. 16+252-Sta. 16+552 (San Jose Patag - Pulong Buhangin Section), Santa Maria, Bulacan24CD0034Flood control100%December 12, 2024December 12, 2024—completedsumbong source
Construction of Flood Control Structure along Santa Maria River and Its Tributaries, Sta. 16+552-Sta. 16+852 (San Jose Patag - Pulong Buhangin Section), Santa Maria, Bulacan24CD0035Flood control100%December 4, 2024December 4, 2024—completedsumbong source
Construction of Flood Control Structure at Barangay Pagala, Baliuag, Bulacan (K003+161 to K003+461)23CC0252Flood control100%December 22, 2023December 6, 2023—completedsumbong source
Construction of flood control Structure at the Langka-Libtong tributaries of Meycauayan River (Left and Right)23CD0089Flood control100%September 17, 2023September 17, 2023—completedsumbong source
Construction of Flood Control Structure including outfall along Barangay Virgen Delos Flores, Sta. Barbara and Tiaong, Baliuag, Bulacan22CC0308Flood control100%March 30, 2023March 30, 2023—completedsumbong source
Construction of Flood Control Structure Mag-asawang Sapa Creek, San Ildefonso, Bulacan22CD0046Flood control100%October 26, 2022October 26, 2022—completedsumbong source
Construction of Flood Control Structure, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Ilog Bayan River, San Jose Del Monte City, Bulacan22CD0056Flood control100%December 12, 2022November 23, 2022—completedsumbong source
Construction of Flood Control Structure, Dulong Bayan (Phase III), City of San jose Del Monte, Bulacan23CD0065Flood control100%December 29, 2023October 16, 2023—completedsumbong source
Construction of Flood Control Structure, Ilog Bayan River, San Jose Del Monte City, Bulacan22CD0055Flood control100%December 12, 2022November 23, 2022—completedsumbong source
Construction of Flood Mitigation Structure along Meycauayan River (Liputan - Nagbalon), Sta. 04+000 - Sta. 04+400, Meycauayan, Bulacan22CD0086Flood control100%July 14, 2023July 14, 2023—completedsumbong source
Construction of River Control Project at Barangay Pagala, Sta. 00+500 to Sta. 00+900, Baliuag, Bulacan23CC0146Flood control100%December 9, 2023December 6, 2023—completedsumbong source
Construction of River Control Project at Barangay Piel, Sta. 01+000 to Sta. 01+400, Baliuag, Bulacan23CC0129Flood control100%December 9, 2023November 10, 2023—completedsumbong source
Construction of River Control Project at Barangay Tangos, Sta. 00+300 to Sta. 00+700, Baliuag, Bulacan23CC0161Flood control100%December 9, 2023November 30, 2023—completedsumbong source
Construction of Riverwall at Barangay Piel, Sta. 01+410 to Sta. 01+810, Baliuag, Bulacan23CC0130Flood control100%December 9, 2023November 10, 2023—completedsumbong source
Construction of Riverwall at Barangay Sulivan, Sta. 02+310 to Sta. 02+710, Baliuag, Bulacan23CC0144Flood control100%December 9, 2023December 5, 2023—completedsumbong source
Improvement along Nangka River, Left Side Facing Upstream, from Sta. 5+156.00 to Sta. 5+524.8022OB0201Flood control100%December 12, 2022December 12, 2022—completedsumbong source
Improvement along Nangka River, Left Side Facing Upstream, from Sta. 5+524.80 to Sta. 5+893.6022OB0202Flood control100%December 11, 2022December 11, 2022—completedsumbong source
Improvement Marikina River at Sta. 17 + 490 to Sta. 18 + 510, Marikina City23OB0408Flood control100%February 3, 2024February 3, 2024—completedsumbong source
Improvement of Balanti Creek and Russet Pumping Station, Brgy. Concepcion Dos, Marikina City21OB0261Flood control100%March 1, 2023March 1, 2023—completedsumbong source
Improvement of Marikina River, Barangay Tumana, Marikina City (Phase 1)24OB0327Flood control100%September 17, 2024September 16, 2024—completedsumbong source
Improvement of Marikina River, Barangay Tumana, Marikina City (Phase 2)24OB0328Flood control100%September 27, 2024September 2, 2024—completedsumbong source
Improvement of Nangka River, Marikina City24OB0329Flood control100%February 20, 2025October 21, 2024—completedsumbong source
Improvement of Poblacion - Sta. Clara Creek, Sta. Maria River Improvement, Sta. Maria, Bulacan22CD0043Flood control100%April 15, 2023April 15, 2023—completedsumbong source
Rehabilitation of Drainage System at Barangay Concepcion Dos, Marikina City21OB0264Flood control100%March 12, 2023March 12, 2023—completedsumbong source
Rehabilitation of Riverwall along Tullahan River at Brgy. San Agustin to Brgy. Concepcion, Malabon City23OA0084Flood control100%April 12, 2024April 5, 2024—completedsumbong source
Rehabilitation of Road Dike at Barangay Malanday, Marikina City22OB0198Flood control100%January 14, 2023January 14, 2023—completedsumbong source
Rehabilitation of Waterways and Construction of Concrete Slope Protection with Steel Sheet Piles along Bocaue River, K009 + 840 to K009 + 990, Bambang, Bocaue, Bulacan23CC0094Flood control100%December 8, 2023November 28, 2023—completedsumbong source
Bank Improvement of Slope Protection along Marikina River (Package 3), Pasig City22OB0072100%October 17, 2023October 17, 2023—completedsumbong source
Construction of Dike along Santo Cristo River, Barangay Kaypian, San Jose del Monte City, Bulacan24CD0078100%December 17, 2024December 17, 2024—completedsumbong source
Construction of Drainage Outfall, Twinville Subdivision, Marikina City22OB0339100%April 6, 2023April 6, 2023—completedsumbong source
Construction of Drainage System along Olive St., Marikina City22OB0338100%May 10, 2023May 10, 2023—completedsumbong source
Construction of Revetment along Imus River (Tributary to Manila Bay), Brgy. Fatima, Dasmariñas City, Cavite22DQ0005100%April 18, 2023April 18, 2023—completedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "L R TIQUI BUILDERS INC",
  "projectCount": 52,
  "totalValuePhp": 4557212006.919999,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name