Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 21EI0172 lists a cost of ₱9.90M, 1.03% above its Approved Budget for the Contract of ₱9.80M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-bid adjustment that was not reflected in the ABC field.

Public record entityConstruction of Flood Control Structure - Mauhao River, Bagong Sikat Section, Bulalacao, Oriental Mindoro
LocationORIENTAL MINDORO, Region IV-BContract 21EI0172
Amount₱9,899,953.64101.03% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure - Mauhao River, Bagong Sikat Section, Bulalacao, Oriental Mindoro21EI0172Flood control100%September 23, 2022September 23, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 7, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Southern Mindoro District Engineering Office",
  "ratio": 1.0102532634950758,
  "abcPhp": 9799477.02,
  "threshold": 0.995,
  "contractId": "21EI0172",
  "contractor": "ANDREM CONST SERVICE",
  "contractCostPhp": 9899953.64
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a post-bid adjustment that was not reflected in the ABC field.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOriental MindoroBulalacaoBagong Sikat
Storms whose wind field reached it
Koto 2025Kalmaegi 2025Bualoi 2025Prapiroon 2024
Hazard exposure
Active fault9.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.