Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CC0192 was awarded at 100.00% of its ABC. Across its 14 recorded contracts, SYMS CONST TRADING was awarded at ≥99.5% of ABC 14 times (100.0%), versus 70.4% for flood-control contracts overall. This could be due to precise cost estimation or competitive bidding that exactly matches the ABC.

Public record entityConstruction of Reinforced Concrete Flood Control Structure, Barangay Sagrada Familia (Purok 4 to Purok 5), Hagonoy, Bulacan
LocationHAGONOY (BULACAN), BULACAN, Region IIIContract 24CC0192
Amount₱67,549,901.28100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Reinforced Concrete Flood Control Structure, Barangay Sagrada Familia (Purok 4 to Purok 5), Hagonoy, Bulacan24CC0192Flood control100%November 5, 2024June 11, 2024—completedsumbong source

Start: March 11, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 1st District Engineering Office",
  "ratio": 1.0000014296118311,
  "abcPhp": 67549804.71,
  "threshold": 0.995,
  "contractId": "24CC0192",
  "contractor": "SYMS CONST TRADING",
  "contractCostPhp": 67549901.28
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This could be due to precise cost estimation or competitive bidding that exactly matches the ABC.