Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23GH0045 was awarded at 99.99% of its ABC. Across its 22 recorded contracts, IBC INTERNATIONAL BUILDERS CORP was awarded at ≥99.5% of ABC 21 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding where the winning bidder offered just below the ABC.

Public record entityConstruction of Flood Control Structure, Barangay Malayuan, Ajuy, Iloilo
LocationAJUY (ILOILO), ILOILO, Region VIContract 23GH0045
Amount₱86,452,076.5099.99% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Barangay Malayuan, Ajuy, Iloilo23GH0045Flood control100%July 3, 2024July 3, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 17, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Iloilo 3rd District Engineering Office",
  "ratio": 0.999862098676906,
  "abcPhp": 86464000,
  "threshold": 0.995,
  "contractId": "23GH0045",
  "contractor": "IBC INTERNATIONAL BUILDERS CORP",
  "contractCostPhp": 86452076.5
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding where the winning bidder offered just below the ABC.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)Iloilo
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Active fault66.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)no layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideno layer coverage for this provinceUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.