Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23PE0018 was awarded at 99.98% of its ABC. Across its 16 recorded contracts, UNIVERSAL DE LEON CONST AND AGGREGATES was awarded at ≥99.5% of ABC 16 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid close to the ABC to remain competitive while maximizing their potential profit.

Public record entityConstruction of Flood Mitigation Structure along Bauang River, Section 2 (Bolo Creek), La Trinidad, Benguet
LocationLA TRINIDAD (CAPITAL) (BENGUET), BENGUET, Cordillera Administrative RegionContract 23PE0018
Amount₱96,480,000.0099.98% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Bauang River, Section 2 (Bolo Creek), La Trinidad, Benguet23PE0018Flood control100%February 25, 2024December 22, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 27, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Benguet 1st District Engineering Office",
  "ratio": 0.9997927461139896,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "23PE0018",
  "contractor": "UNIVERSAL DE LEON CONST AND AGGREGATES",
  "contractCostPhp": 96480000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Mitigation Structure along Bauang River, Section 2 (Bolo Creek), La Trinidad, Benguet.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/fe5b9960-dba3-4463-a525-31f107c040b4

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetLa TrinidadPoblacion
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025
Hazard exposure
Active fault5.7 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.