Barangay

Pandol

Pandol, Can-Avid, Eastern Samar, Region VIII (Eastern Visayas). Rural. Population 405 (2024 POPCEN).

PSGC 0802605016 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Pandol

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

Not yet linked to Pandol itself. This shows the municipality figure for Can-Avid.

100 records · ₱1,198,430,411.36

24 placed at Can-Avid level itself; the rest in LGUs under it.

  1. Improvement of National Roads Along Jct. Taft - Oras - San Policarpio - Arteche Road - Installation of Solar Streetlights - K0891+(-800) - K0903+380 (S000167sm), Eastern Samar Ld₱96,400,220.49 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Improvement of National Roads Along Jct. Taft - Oras - San Policarpio - Arteche Road - Installation of Solar Street Lights, K0903+380 - K0917+073 (S00167sm), Eastern Samar Ld₱96,399,321.79 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Sipag - Access Roads and/Or Bridges From the National Road/S Leading to Major/Strategic Public Buildings/Facilities - Construction of Road Brgy. Canteros - Guiboangan - Jepaco, Can-Avid, Eastern Samar Ld₱96,369,758.84 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  4. Off-Carriageway Improvement Along Jct. Taft - Oras - San Policarpo - Arteche Road (S00167sm), K0898+100 - K0898+480; K0909+000 - K0910+710; K0910+1058 - K0911+010; K0911+174 - K0911+330; K0911+351 - K0912+274; K0912+288 - K0912+732; K0912+844 - K0913+344₱94,663,241.05 · 2018 · medium confidence (project coordinates inside the barangay boundary)
  5. Construction/Opening of A Section Can-Avid, Malogo - Can-Ilay Fmr, Eastern Samar Phase 2₱78,405,758.62 · 2018 · medium confidence (project coordinates inside the barangay boundary)
  6. Retrofitting/Strengthening of Permanent Bridges at 1.) Dalid Bridge (B00520sm); 2.) Can-Avid Bridge (B00514sm) Along Jct. Taft-Oras-San Policarpo - Arteche Road, Eastern Samar₱49,696,507.53 · 2017 · medium confidence (project coordinates inside the barangay boundary)

How linked: 76 by project coordinates inside the barangay boundary; 24 by project title names the place.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Pandol itself. This shows the municipality figure for Can-Avid.

2 records · ₱365,327,033.44

1 placed at Can-Avid level itself; the rest in LGUs under it.

  1. Municipality of Can-Avid, Eastern Samar₱364,329,343.44 · high confidence (the LGU itself is the buyer)
  2. Barangay Malogo, Can-Avid, Eastern Samar₱997,690.00 · high confidence (the LGU itself is the buyer)

How linked: 2 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Pandol itself. This shows the province figure for Eastern Samar.

20,604 records · ₱62,126,364,189.74

20,082 placed at Eastern Samar level itself; the rest in LGUs under it.

  1. Eastern Samar₱62,126,364,189.74 · 20,082 awards · high confidence (area of delivery is this province only)
  2. Biliran, Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱743,171,851.61 · 183 awards · low confidence (area of delivery lists several provinces)
  3. Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱378,221,917.42 · 160 awards · low confidence (area of delivery lists several provinces)
  4. Eastern Samar, Leyte, Northern Samar, Samar₱115,043,836.36 · 28 awards · low confidence (area of delivery lists several provinces)
  5. Eastern Samar, Northern Samar, Samar₱105,706,083.00 · 35 awards · low confidence (area of delivery lists several provinces)
  6. Biliran, Eastern Samar, Leyte, Northern Samar, Samar₱74,244,709.72 · 10 awards · low confidence (area of delivery lists several provinces)

How linked: 20,082 by area of delivery is this province only; 522 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

1 record · ₱4,000,000.00

  1. Construction of Level Ii Potable Water Supply System at Brgy. Pandol₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)

How linked: 1 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

1 record · ₱3,500,000.00

  1. Construction of Multipurpose Building in Brgy Pandol, Can-Avid, Eastern Samar₱3,500,000.00 · 2017 · medium confidence (GAA line text names the place)

How linked: 1 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Pandol itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Can-Avid.

  • Contractor Concentration (Flood Control)Cdu ConstContractor: Cdu Const

See all 1 published flag in Can-Avid

Contractors on linked DPWH projects

None linked to Pandol itself; showing Can-Avid.

Share card: Pandol

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Pandol

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG