CDU CONST is listed as a company organization in Philippine public procurement records on this site, with 343 linked DPWH project(s) totaling about ₱9,554,944,124.11. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
CDU CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 343
- Total value
- ₱9,554,944,124.11
- Published flags
- 7
- Region
- Northern Samar 2nd DEO · Region VIII
Online presence
Licensed officers (PCAB)
- Cesar Dolo Uy · Authorized Managing Officer (PCAB license 13915) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for CDU CONST — not an accusation or finding of wrongdoing.
Score: 82.70 / 100 · Projects in sample: 343 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 64.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 64.4
- lateCompletedProjects
- 80
- onTimeCompletedProjects
- 202
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 329
- pastTargetOngoingProjects
- 47
- undatedCompletedProjectsExcluded
- 9
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 343
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 343
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 343
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 6
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 343
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 300 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0861+453 - K0862+355, K0862+380 - K0862+786, K0863+064 - K0863+364, K0863+600 - K0863+685, K0863+685 -25I00161 · ₱151,454,500.00 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0734+578 - K0735+526, K0742+826 - K0745+000, SAMAR 1ST LD24I00093 · ₱147,285,900.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAROYONDOYON CREEK & KAGLANGKOY CREEK, CATARMAN, NORTHERN SAMAR25IH0019 · ₱144,719,500.00 · mapped
- VIILP - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD OPENING / CONCRETING OF HINANGUTDAN, STA. RITA TO SAN ROQUE, VILLAREAL, SAMAR (PHASE I)20I00054 · ₱136,807,903.87 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- (KATUPARAN)- ITBAYAT AIRPORT /NIA CIRCUMFERENTIAL ROAD, ITBAYAT, BATANES22B00038 · ₱106,458,092.94 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD OPENING/CONCRETING OF HINANGUTDAN - STA. RITA TO SAN ROQUE - VILLAREAL, SAMAR (PHASE III), SAMAR 2ND LD21I00011 · ₱99,438,762.14 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAPDAP RIVER, BRGY. DAPDAP, ALANGALANG, LEYTE24I00199 · ₱96,449,160.00 · mapped
- CONST.OF ROAD SLOPE PROTECTION STRUCTURE, CALBAYOG-CATARMAN RD-KO785+(-200)-KO785+(-118),KO785+(-082)-KO785+(051),KO785+000-KO785+050,KO785_071-KO785+182, KO785+198-KO785+285.5, KO785+322-KO785+381, KO785+624-KO785+69521IJ0088 · ₱96,145,479.00 · mapped
- REHAB./RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, SN POLICARPO-ARTECHE-LAPINIG RD. K0852+790-K0852+940; K0853+526-K0853+613; K0854+735-K0854+850; K0857+470-K0857+630; K0858+675-K0858+928, 2ND DISTRICT, NORTHERN SAMAR24II0006 · ₱95,822,774.70 · mapped
- CONSTRUCTION OF ROAD HOMONHON ISLAND, BRGY. CASUGURAN TO BRGY. HABAG, GUIUAN, EASTERN SAMAR25IB0173 · ₱95,549,540.02
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, SN POLICARPO - ARTECHE - LAPINIG RD, K0861+212 - K0862+060, 2ND DISTRICT, NORTHERN SAMAR22II0063 · ₱94,487,433.16 · mapped
- CONSTRUCTION OF NEW PERMANENT BRIDGE PAGNAMITAN (S00188SM) BR., ALONG GUIUAN - SULANGAN PENINSULA RD.25IB0005 · ₱94,392,988.09 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, SN POLICARPO - ARTECHE - LAPINIG RD, K0862+747 - K0863+085, 2ND DISTRICT, NORTHERN SAMAR22II0064 · ₱91,737,234.16 · mapped
- ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - HINABANGAN DIVERSION ROAD, HINABANGAN, SAMAR19I00109 · ₱87,212,694.02 · mapped
- CONSTRUCTION OF ROAD, BRGY. IBOL-BRGY. JIA-AN, BRGY. PANGDAN, JIABONG AND CATBALOGAN CITY22IK0049 · ₱86,847,471.91 · mapped
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0753+635 - K0754+125, K0754+305 - K0755+059, K0759+900 - K0760+200, K0760+220 - K0760+64025I00094 · ₱86,819,800.00 · mapped
- WIDENING OF PERMANENT BRIDGES, BALUD BR. (B00298SM) ALONG CATARMAN-LAOANG RD., SAN ROQUE, NORTHERN SAMAR22II0039 · ₱81,045,126.52 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0702+483 - K0702+800, K0705+122 - K0705+167, K0706+000 - K0706+500, K0707+830 - K0708+000, K0710+630 - K25I00108 · ₱81,009,900.00 · mapped
- ROAD WIDENING SECONDARY ROADS BORONGAN-GUIUAN ROAD (00171SM), K1019+000 - K1020+845, K1022+000 - K1022+29725IB0158 · ₱80,022,558.69
- OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE III, BARANGAY TABAWAN, CALBAYOG CITY, SAMAR25IJ0025 · ₱76,683,389.60 · mapped
- OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BARANGAY STO. NIÑO, GANDARA, SAMAR25IJ0019 · ₱76,659,388.04 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PAMBUJAN FLOOD CONTROL STRUCTURES AND DRAINAGE SYSTEM (DALE/PAMBUJAN RIVER BASIN), PAMBUJAN, NORTHERN SAMAR19II0029 · ₱74,503,921.23 · mapped
- ROAD WIDENING, TERTIARY ROADS, RAWIS-CATUBIG RD., K0797+279-K0797+887; K0799+771-K0801+161, 2ND DISTRICT, NORTHERN SAMAR23II0013 · ₱71,389,796.93 · mapped
- LOCAL PROGRAM : CONCRETING/IMPROVEMENT OF ROAD, BRGY. ALIBABA - BRGY. SAN JOSE, CALBAYOG CITY, SAMAR19IJ0197 · ₱70,715,000.00 · mapped
- PREVENTIVE MAINTENANCE, SECONDARY ROADS, CATARMAN-LAOANG RD, K0771+449-K0772+425, K0772+495-K0774+300, 2ND DISTRICT, NORTHERN SAMAR23II0001 · ₱69,422,182.22 · mapped
- ROAD WIDENING, RAWIS - CATUBIG RD., K0790+823 - K0792+765, K0792+937 - K0793+941, SECOND DISTRICT, NORTHERN SAMAR20II0010 · ₱69,132,785.24 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) K0774+118 - K0774+263,K0774+555 - K0774+64123IJ0063 · ₱67,490,774.70 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0800+140 - K0800+221, K0800+257 - K0800+318, K0800+378 - K0800+41524IJ0028 · ₱67,480,320.85 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION, STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF PALAPAG RIVER CONTROL, PALAPAG RIVER BASIN, PALAPAG, NORTHERN SAMAR19II0025 · ₱62,371,665.65 · mapped
- WIDENING OF PERMANENT BRIDGES, BURABOD BR. 2 (B00304SM) ALONG CATARMAN -LAOANG RD., LAOANG, NORTHERN SAMAR20II0016 · ₱61,484,284.91 · mapped
- Construction of San Andres Flood Control Structure leading to Antiao River, Catbalogan City, Samar23IK0055 · ₱57,899,899.57 · mapped
- ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0729+005 - K0729+428, K0736+000 - K0736+260, K0740+520 - K0741+43025I00058 · ₱57,879,000.00 · mapped
- Construction of Flood Control Structure along Gandara River, Barangay Blanca Aurora, San Jorge, Samar24IJ0017 · ₱57,850,536.76 · mapped
- Construction of Flood Control Structure along Calbayog River (Downstream), Barangay Dagum, Calbayog City, Samar23IJ0007 · ₱57,382,293.04 · mapped
- ROAD WIDENING, SECONDARY ROADS, SN POLICARPO-ARTECHE-LAPINIG RD., K0856+000-K0857+000, 2ND DISTRICT NORTHERN SAMAR24II0015 · ₱57,292,004.59 · mapped
- NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ROQUE BY-PASS ROAD, SAN ROQUE, NORTHERN SAMAR19II0012 · ₱54,537,521.21 · mapped
- Construction of Flood Control Structure along Gandara River at Buenavista Bridge, Barangay Buenavista, San Jorge, Samar23IJ0022 · ₱53,013,228.80 · mapped
- WIDENING OF PERMANENT BRIDGES, IRAWAHAN BR. (B00326SM) ALONG RAWIS-CATUBIG RD, CATUBIG, NORTHERN SAMAR22II0040 · ₱52,108,006.70 · mapped
- Construction of Seawall (Phase I) Along Bantayan Bay, San Roque, Northern Samar23II0017 · ₱50,411,055.55 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BASEY - MARABUT - PINAMITINAN RD (S00124SM) - K0937+808 - K0940+100, SAMAR 2ND21I00008 · ₱50,366,895.15 · mapped
- NETWORK DEVELOPMENT: ROAD WIDENING - PRIMARY ROADS, DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR), K0814+000 - K0814+858, JIABONG, SAMAR23IK0054 · ₱50,172,096.65 · mapped
- Rehabilitation of Flood Control at Municipal Port, Brgy. Del Sur, Lapinig, Northern Samar22II0053 · ₱49,491,713.80 · mapped
- Rehabilitation of Seawall, Brgy. Del Norte, Lapinig, Northern Samar22II0054 · ₱49,004,700.00 · mapped
- ASSET PRESERVATION - REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - BASEY-MARABUT-PINAMITINAN ROAD, K0909+000 - K0910+100; K0910+800 - K0911+000; K0911+830 - K0912+193, BRGY. IBA, BASEY, SAMAR22IK0058 · ₱48,998,956.40 · mapped
- OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE C, SAMAR23IJ0017 · ₱48,997,057.84 · mapped
- PREVENTIVE MAINT.-PRIMARY ROADS ALONG DAANG MAHARLIKA, K0853+000 - K0853+514; K0853+547 - K0854+000; K0855+108 - K0855+730; K0855+730 - K0855+967; K0863+000 - K0864+566, PINABACDAO, SAMAR22IK0066 · ₱48,995,986.87 · mapped
- CONSTRUCTION OF GAMAY FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, GAMAY RIVER BASIN, GAMAY, NORTHERN SAMAR25II0018 · ₱48,979,900.00 · mapped
- Construction of Pambujan Flood Control Structure, Pambujan River Basin, Pambujan, Northern Samar24II0038 · ₱48,969,801.32 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS, CALBAYOG - CATARMAN RD. K0795+700 - K0795+80024IJ0021 · ₱48,962,467.18 · mapped
- CSSP: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), ALMAGRO CIRCUMFERENTIAL ROAD, ALMAGRO, SAMAR23IJ0029 · ₱48,960,961.75 · mapped
Equipment & capacity
PCAB license
- License no.
- 13915
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Apr 8, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 13915); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
47 evaluations listed across 7 GPPB CPES releases; average final rating 92.7% over 17 rated projects; 47 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 6, 2025 | DPWH | ₱76,659,388.00 | On-going | 90.8% | — | 40th, p. 58 |
| Jun 6, 2025 | DPWH | ₱48,702,349.00 | On-going | 90.9% | — | 40th, p. 58 |
| Jun 6, 2025 | DPWH | ₱43,834,400.00 | On-going | 91.0% | — | 40th, p. 58 |
| Jun 4, 2025 | DPWH | ₱48,979,900.00 | On-going | 91.7% | — | 40th, p. 58 |
| Mar 22, 2025 | DPWH | ₱95,822,774.00 | Completed | 92.1% | 95.2% | 40th, p. 58 |
| Mar 20, 2025 | DPWH | ₱147,285,900.00 | Completed | 93.6% | 95.7% | 40th, p. 58 |
| Feb 22, 2025 | DPWH (JV) | ₱35,252,593.00 | On-going | 91.1% | — | 40th, p. 58 |
| Nov 8, 2024 | DPWH (JV) | ₱35,648,303.00 | On-going | 89.4% | — | 39th (rev), p. 193 |
| Aug 21, 2024 | DPWH (JV) | ₱35,252,593.00 | On-going | 80.6% | — | 38th, p. 48 |
| Jul 25, 2024 | DPWH (JV) | ₱139,909,552.00 | On-going | 98.4% | — | 38th, p. 210 |
| Jul 25, 2024 | DPWH | ₱147,285,900.00 | On-going | 97.1% | — | 38th, p. 47 |
| Jul 24, 2024 | DPWH | ₱95,824,356.00 | On-going | 97.3% | — | 38th, p. 47 |
Showing the 12 most recent of 47.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →