Barangay
Ormocay
Ormocay, Mayorga, Leyte, Region VIII (Eastern Visayas). Rural. Population 956 (2024 POPCEN).
PSGC 0803735008 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Ormocay
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Ormocay itself. This shows the municipality figure for Mayorga.
52 records · ₱1,115,380,817.20
- Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (Lt) - K0949+288 - K0953+093, Leyte 2nd Ld₱152,272,988.76 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin(Downstream),Barangay Liberty, Mayorga,Leyte₱96,449,168.88 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239 - Preventive Maintenance - Primary Roads Along Maharlika Highway - K0945+000 - K0945+910, Leyte 2nd Ld₱82,058,271.82 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Asset Preservation of Nat'L. Roads-Preventive Maint. Based On Pavement Management System / Highway Development and Management-4 (Hdm-4) - Primary Roads, Daang Maharlika Ko950+761 -Ko953+098; Ko953+098 - Ko953+572; Ko954+247 -Ko954+776, Leyte 2nd Ld₱64,637,761.42 · 2017 · medium confidence (project coordinates inside the barangay boundary)
- Bridge Program-Widening of Permanent Bridges-Hibuga Bridge(B00479lt) Along Mayorga-La Paz Road,Mayorga,Leyte₱64,614,635.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin, Mayorga, Leyte₱55,482,311.18 · 2023 · medium confidence (project coordinates inside the barangay boundary)
How linked: 52 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Ormocay itself. This shows the municipality figure for Mayorga.
3 records · ₱70,006,380.89
1 placed at Mayorga level itself; the rest in LGUs under it.
- Municipality of Mayorga, Leyte₱69,677,480.89 · high confidence (the LGU itself is the buyer)
- Barangay Burgos, Mayorga, Leyte₱199,000.00 · high confidence (the LGU itself is the buyer)
- Barangay San Roque, Mayorga, Leyte₱129,900.00 · high confidence (the LGU itself is the buyer)
How linked: 3 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Ormocay itself. This shows the province figure for Leyte.
151,037 records · ₱325,903,601,493.13
150,372 placed at Leyte level itself; the rest in LGUs under it.
- Leyte₱325,903,601,493.13 · 150,372 awards · high confidence (area of delivery is this province only)
- Biliran, Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱743,171,851.61 · 183 awards · low confidence (area of delivery lists several provinces)
- Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱378,221,917.42 · 160 awards · low confidence (area of delivery lists several provinces)
- Biliran, Leyte, Southern Leyte₱131,322,906.90 · 21 awards · low confidence (area of delivery lists several provinces)
- Eastern Samar, Leyte, Northern Samar, Samar₱115,043,836.36 · 28 awards · low confidence (area of delivery lists several provinces)
- Leyte, Samar₱81,350,863.81 · 89 awards · low confidence (area of delivery lists several provinces)
How linked: 150,372 by area of delivery is this province only; 665 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Ormocay itself. This shows the municipality figure for Mayorga.
11 records · ₱64,009,860.00
4 placed at Mayorga level itself; the rest in LGUs under it.
- Lgsf_gef₱30,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Lgsf_gef₱6,229,860.00 · 2022 · high confidence (location columns in the DBM release)
- Construction of 450 Linear Meters of Farm-to-Market Road at Barangay Poblacion Zone Iii to Barangay Burgos₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Construction and Installation of Solar Street Lights at Barangay Union₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Lgsf_gef₱2,780,000.00 · 2025 · high confidence (location columns in the DBM release)
- Provision of Renewable Energy-Based Electrification at Brgy. A. Bonifacio, Mayorga, Leyte₱2,500,000.00 · 2025 · high confidence (location columns in the DBM release)
How linked: 11 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
Not yet linked to Ormocay itself. This shows the municipality figure for Mayorga.
24 records · ₱450,562,000.00
15 placed at Mayorga level itself; the rest in LGUs under it.
- Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin (Downstream), Barangay Liberty, Mayorga, Leyte₱100,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structures Along Talisay River, Mayorga, Leyte₱68,085,000.00 · 2020 · high confidence (GAA line text names the place)
- Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin, Mayorga, Leyte₱57,500,000.00 · 2023 · high confidence (GAA line text names the place)
- Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin, Sta. 0+106 - Sta. 0+677, Brgy. General Luna, Mayorga, Leyte₱50,000,000.00 · 2022 · high confidence (GAA line text names the place)
- Construction of Hibuga Flood Control Structure and Drainage, Hibuga River Basin, Barangay General Luna, Mayorga, Leyte₱42,377,000.00 · 2021 · high confidence (GAA line text names the place)
- Construction of Liberty Bridge, Barangay Liberty, Mayorga, Leyte₱30,000,000.00 · 2025 · medium confidence (GAA line text names the place)
How linked: 24 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Ormocay itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Mayorga.
- Contractor Concentration (Flood Control)Lanoy ConstContractor: Lanoy Const
Contractors on linked DPWH projects
None linked to Ormocay itself; showing Mayorga.
- AQUALINE CONST CORP FORMERLY: AQUALINE CONST2 projects · ₱166,841,003.16
- FAIRCHILD BUILDERS4 projects · ₱162,819,005.23
- FAIRCHILD BUILDERS & DEVELOPERS INC3 projects · ₱156,045,630.35
- DUROS DEVELOPMENT CORP2 projects · ₱99,647,543.51
- MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP1 project · ₱64,637,761.42
- VIGUZ CONST CORP1 project · ₱64,614,635.00
- LADY OF ASSUMPTION ENT INC FORMERLY: LADY OF ASSUMPTION ENT2 projects · ₱62,225,710.05
- GES CONST3 projects · ₱54,909,078.32
- WP ALVERO CONST SERVICES2 projects · ₱44,034,116.97
- ROCKWORLD INDUSTRIES1 project · ₱42,812,422.07