VIGUZ CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 59 linked DPWH project(s) totaling about ₱1,746,088,723.31. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
VIGUZ CONST CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 59
- Total value
- ₱1,746,088,723.31
- Published flags
- 0
- Region
- Leyte 1st DEO · Region VIII
Licensed officers (PCAB)
- Leonilo Julio V. De Guzman · Authorized Managing Officer (PCAB license 08178) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for VIGUZ CONST CORP — not an accusation or finding of wrongdoing.
Score: 84.00 / 100 · Projects in sample: 59 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 74.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 74.2
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 48
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 58
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 59
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 59
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 59
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 59
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 52 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY GUINGAUAN, TANAUAN, LEYTE25IC0014 · ₱96,456,062.26 · mapped
- BRIDGE - WIDENING OF PERMANENT BRIDGES - BITO BR. (B00536LT) ALONG DAANG MAHARLIKA (LT), BRGY. BITO, JAVIER, LEYTE21I00045 · ₱82,791,431.01 · mapped
- BRIDGE - WIDENING OF PERMANENT BRIDGES - SAN JOAQUIN BR. (B00033LT) ALONG DAANG MAHARLIKA (LT), PALO, LEYTE21I00016 · ₱66,634,766.89 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TANAUAN - DAGAMI RD. K0932+600 - K0934+915.4, LEYTE 2ND LD20I00049 · ₱66,130,945.34 · mapped
- BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-HIBUGA BRIDGE(B00479LT) ALONG MAYORGA-LA PAZ ROAD,MAYORGA,LEYTE24ID0067 · ₱64,614,635.00 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - CABAC-AN BRIDGE (B00058LT) ALONG MAINIT-SAN MIGUEL-SANTOL ROAD, SAN MIGUEL, LEYTE25IC0049 · ₱52,979,985.00 · mapped
- CONSTRUCTION OF 2 UNITS 4 STOREY SIXTEEN CLASSROOM SCHOOL BUILDING DULAG NATIONAL HIGH SCHOOL,DULAG,LEYTE16ID0073 · ₱50,108,821.08
- CONSTRUCTION OF UYAWAN BRIDGE,BARANGAY UYAWAN,CARIGARA,LEYTE19ID0049 · ₱49,500,000.00 · mapped
- FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONST. OF FLOOD CONTROL ALONG CAVITE EAST - COGON CREEK, PALO, LEYTE20IC0047 · ₱49,004,259.14 · mapped
- WIDENING OF PERMANENT BRIDGES-CANOMANTAG BRIDGE(B00488LT) ALONG BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD,BARUGO,LEYTE21ID0035 · ₱48,999,590.76 · mapped
- ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS BURAUEN-MAHAGNAO ROAD K0987+405-K0987+542,K0987+597-K0987+66521ID0075 · ₱48,875,801.94 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CAYARE, SAN MIGUEL, LEYTE23IC0060 · ₱46,043,029.12 · mapped
- WIDENING OF PERMANENT BRIDGES, EMBARKADERO BRIDGE (B00036LT) ALONG DAANG MAHARLIKA (LT) ROAD, TANAUAN, LEYTE18IC0009 · ₱45,570,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD;CONCRETE REBLOCKING JARO-DAGAMI-BURAUEN-LA PAZ ROADK0942+110.00-K0942+462.00, K0947+192.00-K0947+640.20K0956+020.00-K0957+000.00, K0957+150.00-K0957+500.00K0958+841.00-K0959+050.00, K0969+800.00-K0969+900.00K0971+00018ID0052 · ₱43,978,485.10 · mapped
- BRIDGE WIDENING OF PERMANENT BRIDGES - SAN JOAQUIN BR., (B00033LT) ALONG DAANG MAHARLIKA (LT), LEYTE 1ST LD22I00017 · ₱43,482,867.20 · mapped
- WIDENING OF BRIDGES TO MORE THAN TWO (2) LANES, HIBUGA BRIDGE (B00069LT) ALONG DAANG MAHARLIKA (LT), KO948+613, GEN. LUNA, MAYORGA, LEYTE16I00038 · ₱43,187,999.78
- CONST./UPGRADING/IMPRVT. OF DRAINAGE ALONG NATIONAL ROADS, PALO - CARIGARA - ORMOC ROAD, KO964+215 - KO964+862; KO969+298 - KO970+015; KO970+308 - KO972+115, CAPOOCAN, LEYTE16I00074 · ₱41,570,971.42 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BURAYAN RIVER, BARANGAY 81, MARASBARAS, TACLOBAN CITY23IM0079 · ₱39,357,131.62 · mapped
- ASSET PRESERVATION-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS,JARO-DAGAMI-BURAUEN-LA PAZ RD. K0964+814-K0965+84419ID0014 · ₱39,260,240.71 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - PALO-CARIGARA-ORMOC ROAD - K0971+094 - K0971+214, CAPOOCAN, LEYTE22ID0049 · ₱39,193,672.03 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS BURAUEN-MAHAGNAO ROAD ,K0987+665-K0987+78021ID0072 · ₱39,006,668.93 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES, MANGONBANGON BR. 1 (B00294LT) ALONG NAGA-NAGA ANIBONG RD, TACLOBAN CITY21IM0040 · ₱36,381,316.79 · mapped
- WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES, HIAGSAM BRIDGE (B000452LT) ALONG PALO - CARIGARA - ORMOC ROAD, KO945+284.00, JARO, LEYTE15I00075 · ₱35,782,240.02
- REHAB./MAJOR REPAIR OF FLOOD CONTROL STRUCTURE -REHAB. OF FLOOD CONTROL WALL ALONG BANGON RIVER, PALO, SECTION, BRGY. ARADO, PALO, LEYTE19IC0016 · ₱34,735,817.58 · mapped
- CONSTRUCTION OF EVACUATION CENTER, BARANGAY STO. NIÑO, JARO LEYTE21I00077 · ₱34,682,627.54 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BURAYAN RIVER BRGY. 81, MARASBARAS, TACLOBAN CITY23IM0105 · ₱34,261,446.96 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMS (HDM-4) ALONG MAINIT-SAN MIGUEL-SANTOL ROAD(S00061LT) K0947+097 - K0947+558, K0950+042 - K0950+362, K0951+767 - K0951+1278, SAN MIGUEL, LEYTE17IC0025 · ₱34,256,543.44 · mapped
- WIDENING OF PERMANENT BRIDGES, SOLANO BRIDGE (B00035LT) ALONG DAANG MAHARLIKA (LT) ROAD, TANAUAN, LEYTE18IC0013 · ₱31,115,000.00 · mapped
- BRIDGE - WIDENING OF PERMANENT BRIDGES - MALAGUICAY BRIDGE I (B00519LT) ALONG TANAUAN-DAGAMI ROAD, TANAUAN, LEYTE23IC0020 · ₱30,818,343.12 · mapped
- WIDENING OF BRIDGE-BARUGUAN BRIDGE (B00019LT) ALONG LEYTE SAMAR ROAD (VIA GUINTIGUI-AN), TACLOBAN CITY18IM0033 · ₱29,769,682.12 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING -TERTIARY ROADS - BAGAHUPI-BABATNGON-STA CRUZ-BARUGO-CARIGARA RD - K0929 + 000 - K0929 + 591, BABATNGON, LEYTE25IC0057 · ₱29,178,995.00 · mapped
- BRIDGE - WIDENING OF PERMANENT BRIDGES - KAHUMAYHUMAYAN BRIDGE (B00522LT) ALONG TANAUAN-DAGAMI ROAD, TANAUAN, LEYTE24IC0019 · ₱24,660,027.59 · mapped
- WIDENING OF PERMANENT BRIDGE;PINAMITINAN BRIDGE(B00001LT)ALONG PALO-CARIGARA-ORMOC ROAD(S00074LT)K0961+568.00,CAPOOCAN,LEYTE16ID0046 · ₱21,466,025.69
- BRIDGE - WIDENING OF PERMANENT BRIDGES - TAB-ANG BRIDGE (B00060LT) ALONG BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD, BABATNGON, LEYTE23IC0027 · ₱20,100,001.53 · mapped
- WIDENING OF PERMANENT BRIDGES - APITONG BR. (B00030LT) ALONG APITONG-PATERNO RD24IM0114 · ₱19,587,510.48 · mapped
- BRIDGE - WIDENING OF PERMANENT BRIDGES, MALAGUICAY BRIDGE 2 (B00520LT) ALONG TANAUAN-DAGAMI ROAD, TANAUAN, LEYTE23IC0022 · ₱18,145,577.55 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - MANGONBANGON BR. 2 (B00029LT) ALONG RIZAL AVENIDA EXT. RD.22IM0061 · ₱17,565,230.25 · mapped
- ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS,TANAUAN-DAGAMI ROAD K0930+(-056)-K0932+300,K0932+586-K0935+000 & K0935+430-K0936+02019ID0013 · ₱15,686,488.16 · mapped
- CONSTRUCTION OF BRIDGE, BRGY. CANTARIWIS, TOLOSA, LEYTE24IC0087 · ₱14,663,419.77 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - RIZAL AVENIDA EXT RD - K0905 + (-867) - K0905 + (-843) , K0905 + (-900) - K0905 + (-867), K0905 + (-904) - K0905 + (-900), K0905 + (-908) - K0905 + (-904), K0905 + (-926)..24IM0041 · ₱14,647,897.44 · mapped
- WIDENING OF BRIDGES TO MORE THAN TWO (2) LANES, MATADBATAD BRIDGE (B00066LT) ALONG DAANG MAHARLIKA (LT), KO941+506, DULAG, LEYTE16I00040 · ₱14,529,876.51
- WIDENING OF BRIDGE-SUHI BRIDGE (B00021LT) ALONG LEYTE SAMAR ROAD (VIA GUINTIGUI-AN), TACLOBAN CITY19IM0042 · ₱13,959,206.42 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT. - 4 (HDM-4) (INTERMITTENT SECTIONS),BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD S00069LT K0938+852 - K0939+352, (BARUGO15ID0219 · ₱13,665,678.75 · mapped
- CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS CONST. OF NEW PERMANENT BRIDGES, ASLUM BRIDGE ALONG KILING-TABONTABON-JULITA ROAD, BRGY. ASLUM, JULITA, LEYTE16ID0012 · ₱13,070,560.54 · mapped
- WIDENING OF BRIDGE-KAWAYAN BR. (B00022LT) ALONG LEYTE SAMAR RD. (VIA GUINTIGUI-AN), TACLOBAN CITY19IM0046 · ₱13,028,048.81 · mapped
- CONCRETING OF BRGY. SAN JUAN FMR, BRGY. SAN JUAN, STA. FE, LEYTE24IC0181 · ₱12,925,216.21 · mapped
- CONCRETING OF BRGY. SAN ANTONIO TO BRGY. CABARASAN DAKU FMR, BRGY. SAN ANTONIO AND BRGY. CABARASAN DAKU, PALO, LEYTE23IC0140 · ₱12,427,503.86 · mapped
- ASSET PRESERVATION-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS,BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA RD.,K0944+785-K0945+313,CARIGARA,LEYTE24ID0074 · ₱9,759,055.64 · mapped
- ASSET PRESERVATION PREVENTIVE MAINTENANCE-TERTIARY ROADS,JARO-DAGAMI-BURAUEN-LA PAZ RD. K0961+800-K0962+550, K0962+784+K0963+050,K0978+050+K0979+200, K0980+100-K0981+000, K0982+000-K0983+000 & K0984+000-K0985+00019ID0015 · ₱7,854,696.27 · mapped
- WIDENING OF PERMANENT BRIDGES, MANGONBANGON BR. 2 (B00029LT) ALONG RIZAL AVENIDA EXT RD23IM0084 · ₱7,772,189.88 · mapped
Equipment & capacity
PCAB license
- License no.
- 08178
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jan 25, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 08178); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 5 GPPB CPES releases; average final rating 92.7% over 5 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | ₱64,614,695.00 | Completed | 93.6% | 92.9% | 40th, p. 320 |
| Mar 17, 2025 | DPWH | ₱24,660,027.00 | Completed | 94.3% | 96.5% | 40th, p. 320 |
| Nov 4, 2024 | DPWH | ₱64,614,635.00 | On-going | 92.5% | — | 39th (rev), p. 224 |
| Aug 1, 2024 | DPWH | ₱24,660,028.00 | On-going | 97.9% | — | 38th, p. 254 |
| Aug 23, 2023 | DPWH (JV) | ₱95,390,566.00 | Final | 93.6% | 89.7% | 36th, p. 223 |
| Mar 11, 2020 | DPWH | ₱13,959,206.00 | Completed | 93.5% | 92.4% | 40th, p. 320 |
| Nov 13, 2019 | DPWH | ₱13,959,206.00 | On-going | 91.7% | — | 37th, p. 115 |
| Nov 13, 2019 | DPWH | ₱34,735,818.00 | Completed | 92.9% | 91.9% | 37th, p. 115 |
| Nov 12, 2019 | DPWH | ₱46,549,984.00 | On-going | 92.5% | — | 37th, p. 115 |
| Aug 27, 2019 | DPWH | ₱35,698,720.00 | On-going | 89.9% | — | 37th, p. 115 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 71 awards · ₱1,694,382,332.06
- NIA Infrastructure: 13 awards · ₱180,807,961.63
- Municipality of Palo, Leyte Infrastructure: 1 award · ₱16,089,156.79
- Province of Leyte Infrastructure: 4 awards · ₱13,841,089.39
- NIA Goods & services: 1 award · ₱13,833,313.80
- City of Quezon Infrastructure: 2 awards · ₱3,715,358.38
- Municipality of Carigara, Leyte Infrastructure: 3 awards · ₱2,838,548.92
- Municipality of Carigara, Leyte Goods & services: 1 award · ₱1,055,000.00
- CID No. 25IC0107 (Readvertisement)₱4,889,999.54· 2025-11-08· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 25IC0057 (Readvertisement)₱29,178,995.00· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 25IC0049₱52,979,985.00· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 25IC0031 (Readvertisement)₱4,890,530.82· 2025-02-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 25IC0014₱96,456,062.26· 2025-02-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 25IC0076₱4,877,676.61· 2025-02-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- 24IM0114₱19,587,510.48· 2024-09-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TACLOBAN CITY SDEO
- Contract ID No. 24IC0087₱14,663,419.77· 2024-09-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 24IC0181₱12,925,216.21· 2024-07-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- 24IM0041-READVERTISE₱14,647,891.94· 2024-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TACLOBAN CITY SDEO
- 24ID0067 Readvertised₱64,614,635.00· 2024-04-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 2ND DEO
- 24ID0080₱9,759,055.64· 2024-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 2ND DEO
- CID No. 24IC0019₱24,660,027.59· 2024-01-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 23IC0060₱46,043,010.09· 2023-11-10· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- 23ID0092₱5,975,792.29· 2023-09-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 2ND DEO
- 23IM0084-Readvertise₱7,772,189.88· 2023-08-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TACLOBAN CITY SDEO
- 23IM0105₱34,261,446.96· 2023-08-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TACLOBAN CITY SDEO
- CID No. 23IC0140₱12,427,498.01· 2023-06-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- 23IM0079₱39,357,131.62· 2023-06-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TACLOBAN CITY SDEO
- CID No. 23IC0027₱20,100,001.53· 2023-04-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 23IC0022₱18,145,577.55· 2023-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- CID No. 23IC0020₱30,818,343.12· 2023-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 1ST ED
- 22ID0063₱1,564,156.18· 2022-08-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 2ND DEO
- 21ID0072 Readvertised₱39,006,668.93· 2022-07-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 2ND DEO
- 21ID0075 Readvertised₱48,875,801.94· 2022-07-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - LEYTE 2ND DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →