Barangay
Concepcion
Concepcion, Alicia, Zamboanga Sibugay, Region IX (Zamboanga Peninsula). Rural. Population 1,586 (2024 POPCEN).
PSGC 0908301027 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Concepcion
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
8 records · ₱1,487,293,966.60
- Pr-13, Siay-Gapol Road, Zamboanga Sibugay K1761+473.00-K1797+234.10 Under Adb Loan 3631-Phi: Improving Growth Corridors in Mindanao Road Sector Project₱1,328,722,765.86 · 2021 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Bridge and Road Approaches, Brgy. Concepcion, Alicia, Z.S₱44,908,408.93 · 2018 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River (Upstream), Barangay Concepcion, Alicia, Zamboanga Sibugay₱39,170,821.25 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure(Revetment Wall) Along Sibuguey River, Brgy. Concepcion, Alicia, Zamboanga Sibugay₱26,455,050.00 · 2019 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River, Brgy. Concepcion, Alicia, Zamboanga Sibugay (Sta. 00+002 - Sta. 00+299)₱25,255,836.48 · 2018 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River (Upstream), 0+000-0+192, Barangay Concepcion, Alicia, Zamboanga Sibugay₱16,659,861.30 · 2020 · medium confidence (project coordinates inside the barangay boundary)
How linked: 8 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Concepcion itself. This shows the municipality figure for Alicia.
1 record · ₱381,629,428.29
- Municipality of Alicia, Zamboanga Sibugay₱381,629,428.29 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Concepcion itself. This shows the province figure for Zamboanga Sibugay.
23,420 records · ₱52,342,997,195.22
23,407 placed at Zamboanga Sibugay level itself; the rest in LGUs under it.
- Zamboanga Sibugay₱52,342,997,195.22 · 23,407 awards · high confidence (area of delivery is this province only)
- Basilan, Isabela, Sulu, Tawi-Tawi, Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱38,348,411.40 · 1 awards · low confidence (area of delivery lists several provinces)
- Zamboanga del Sur, Zamboanga Sibugay₱30,455,583.00 · 3 awards · low confidence (area of delivery lists several provinces)
- Basilan, Sulu, Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱8,051,535.72 · 1 awards · low confidence (area of delivery lists several provinces)
- Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱1,107,095.00 · 3 awards · low confidence (area of delivery lists several provinces)
- Zamboanga del Norte, Zamboanga Sibugay₱77,000.00 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 23,407 by area of delivery is this province only; 13 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Concepcion itself. This shows the municipality figure for Alicia.
2 records · ₱9,000,000.00
1 placed at Alicia level itself; the rest in LGUs under it.
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction/Installation of Solar Powered Streetlights at Sitio Tumpukan and Sitio Subanuhan Brgy. Sta. Maria, Alicia, Zamboanga Sibugay₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 2 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
5 records · ₱132,700,000.00
- Construction of Bridge and Road Approaches-Brgy. Concepcion, Alicia, Zamboanga Sibugay₱47,000,000.00 · 2018 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River (Upstream), Barangay Concepcion, Alicia, Zamboanga Sibugay₱40,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River, Brgy. Concepcion, Alicia, Zamboanga Sibugay₱27,000,000.00 · 2019 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+167, Barangay Concepcion, Alicia, Zamboanga Sibugay₱17,000,000.00 · 2020 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure (Revetment Wall) Along Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+167, Barangay Concepcion, Alicia, Zamboanga Sibugay₱1,700,000.00 · 2021 · medium confidence (GAA line text names the place)
How linked: 5 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Badsbro Const and Gen MerchandiseContractor: Badsbro Const and Gen Merchandise
Contractors on linked DPWH projects
All 5 contractors on DPWH projects linked to Concepcion and the LGUs under it. Click a column to sort.
| Qingdao Municipal Const Group CO LTD | 1 | ₱1,328,722,765.86 | 0 |
| Lakewood Const CO | 2 | ₱55,830,682.55 | 0 |
| Badsbro Const And Gen Merchandise | 2 | ₱51,710,886.48 | 1 |
| Esr Const And Development CORP Formerly: Esr Const | 1 | ₱44,908,408.93 | 0 |
| Cpan Engineering | 2 | ₱6,121,222.78 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Concepcion
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
