BADSBRO CONST AND GEN MERCHANDISE is listed as a company organization in Philippine public procurement records on this site, with 245 linked DPWH project(s) totaling about ₱11,953,255,439.17. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
BADSBRO CONST AND GEN MERCHANDISE
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 245
- Total value
- ₱11,953,255,439.17
- Published flags
- 1
- Region
- Zamboanga Sibugay 1st DEO · Region IX
Online presence
Google Maps: Badsbro Construction & General Merchandise★ 4.3 (6 reviews)Google Maps, 2026-10-22
QHHM+XG3, Ipil, Zamboanga Sibugay
Licensed officers (PCAB)
- Romulo Bernardino Bajada · Authorized Managing Officer (PCAB license 32876) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for BADSBRO CONST AND GEN MERCHANDISE — not an accusation or finding of wrongdoing.
Score: 75.30 / 100 · Projects in sample: 245 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 48.5/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 48.5
- lateCompletedProjects
- 61
- onTimeCompletedProjects
- 111
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 232
- pastTargetOngoingProjects
- 60
- undatedCompletedProjectsExcluded
- 13
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 245
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 245
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 245
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 245
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 239 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SINDANGAN-BAYOG-LAKEWOOD ROAD, PACKAGE 1, ZAMBOANGA DEL NORTE24J00023 · ₱208,248,500.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, BARANGAY DICAYAS, DIPOLOG CITY, ZAMBOANGA DEL NORTE25J00228 · ₱173,321,200.00 · mapped
- ROAD WIDENING INCLUDING DRAINAGE PAGADIAN CITY - ZAMBOANGA CITY ZAMBOANGA DEL SUR20J00009 · ₱169,690,075.46 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROAD - PAGADIAN CITY - ZAMBOANGA CITY ROAD24J00062 · ₱164,332,851.00 · mapped
- ROAD WIDENING- PRIMARY ROADS- MAHARLIKA HIGHWAY (LANAO- PAGADIAN - ZAMBOANGA CITY RD)25J00062 · ₱159,337,850.25
- ROAD OPENING/CONSTRUCTION OF DIVERSION ROAD, INCLUDING ROW AND CONSTRUCTION OF BRIDGES, JUNCTION NATIONAL HIGHWAY AT BARANGAY PANGI-GUITOAN-TAWAY-SUCLEMA, JUNCTION NATIONAL HIGHWAY AT BARANGAY TIAYON, ZAMBOANGA SIBUGAY, STA. 000+235.00 TO STA. 0010+486.2016J00010 · ₱155,384,914.67 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS SINDANGAN-BAYOG-LAKEWOOD ROAD, PACKAGE 2, ZAMBOANGA DEL NORTE24J00024 · ₱154,588,175.00 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, PACKAGE 2, BARANGAY STA. BARBARA SECTION, IMELDA, ZAMBOANGA SIBUGAY25J00027 · ₱153,625,286.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - LANAO - PAGADIAN CITY - ZAMBOANGA CITY ROAD24J00066 · ₱152,825,119.00 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- PRIMARY ROADS, DIPOLOG- SINDANGAN- LILOY ROAD24J00108 · ₱145,291,760.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS - SINDANGAN - BAYOG -LAKEWOOD ROAD, ZAMBOANGA DEL NORTE23J00012 · ₱144,986,425.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - LANAO - PAGADIAN CITY - ZAMBOANGA CITY ROAD24J00067 · ₱144,228,707.00 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS ALONG JCT IMELDA-ALICIA ROAD, ZAMBOANGA SIBUGAY (S01114MN) K1751+756 - K1751+847, K1753+424 - K1754+016, K1756+537.50 - K1756+788.50, K1762+000 - K1762+363.50, K1762+400.50 - K1764+198.5024JI0060 · ₱144,026,250.00 · mapped
- ROAD WIDENING LANAO - PAGADIAN - ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY 2ND DEO, K1763+300.00 - K1763+489.00, K1763+631.00 - K1766+037.00, K1766+165.00 - K1768+196.12, K1788+196.12 - K1768+700.00, NET LENGTH: 10.26 LANE KM/5,130.00 LN.M./5.130 KM18J00080 · ₱136,453,688.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF DIPOLOG RIVER FLOOD CONTROL DEVELOPMENT PROJECT, BARANGAY TURNO AND BARRA, DIPOLOG CITY24J00027 · ₱131,183,625.00 · mapped
- ROAD WIDENING LANAO - PAGADIAN - ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY 2ND DEO, K1758+296.00 - K1759+182.00, K1759+335.00 - K1760+071.00, K1760+222.00 - K1763+300.00, NET LENGTH: 9.40 LANE KM/4,700.00 LN.M./4.700 KM18J00079 · ₱130,706,337.54 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PUNTA RIVER (UPSTREAM), BARANGAY PUNTA, DIPOLOG CITY, ZAMBOANGA DEL NORTE25JC0020 · ₱125,249,999.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAPATAN RIVER (UPSTREAM), DON JOSE AGUIRRE, MANUKAN, ZAMBOANGA DEL NORTE25JC0033 · ₱125,235,082.00 · mapped
- PAVING OF UNPAVED ROADS - TERTIARY ROADS SINDANGAN-BAYOG-LAKEWOOD ROAD, ZAMBOANGA DEL SUR23J00103 · ₱121,298,469.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO - PAGADIAN - ZAMBOANGA CITY ROAD (S01112MN)22J00050 · ₱114,530,494.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY KAHAYAGAN, BAYOG, ZAMBOANGA DEL SUR, PHASE III23J00106 · ₱114,521,199.00 · mapped
- ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD)25J00075 · ₱112,106,367.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PUNTA RIVER (DOWNSTREAM), BARANGAY PUNTA, DIPOLOG CITY, ZAMBOANGA DEL NORTE25JC0019 · ₱109,395,981.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD), K1773+361.00 - K1775+181.0025J00037 · ₱107,231,489.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF DIPOLOG RIVER FLOOD CONTROL DEVELOPMENT PROJECT, BARANGAY TURNO AND BARRA, DIPOLOG CITY, ZAMBOANGA DEL NORTE23J00016 · ₱106,149,989.73 · mapped
- ROAD WIDENING - DIPOLOG-SINDANGAN-LILOY RD -K1861+760 - K1863+66025JC0055 · ₱103,854,912.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY - PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA DEL SUR20J00007 · ₱103,310,868.33 · mapped
- ROAD WIDENING - PRIMARY ROADS - LILOY - IPIL ROAD21J00023 · ₱101,469,100.00 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BACALAN BR. SECTION (B00497MN), LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01113MN), IPIL, ZAMBOANGA SIBUGAY23J00040 · ₱100,205,424.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - LANAO - PAGADIAN - ZAMBOANGA CITY ROAD23J00034 · ₱100,205,424.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO - PAGADIAN - ZAMBOANGA CITY ROAD (S01112MN)22J00052 · ₱99,784,860.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD23J00097 · ₱98,889,872.90 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - LANAO - PAGADIAN - ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY23J00029 · ₱98,882,845.00 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS - IMELDA - BAYOG - KUMALARANG - LAPUYAN - MARGOSATUBIG RD, ZAMBOANGA SIBUGAY 1ST DEO22J00047 · ₱98,008,645.30 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROAD - PAGADIAN CITY - ZAMBOANGA CITY ROAD24J00123 · ₱97,436,520.00 · mapped
- Construction of Flood Control Structure (revetment Wall) along Sibuguey River, Barangay Santa Barbara, Imelda, Zamboanga Sibugay23J00033 · ₱96,499,965.23 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS DAMAGE PAVED ROADS - PRIMARY ROADS20J00168 · ₱96,227,691.60 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS, MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) K1711+000.00 - K1712+810.00, K1712+810 - K 1712+834.0025J00024 · ₱96,001,847.00 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DIPOLOG-SINDANGAN-LILOY RD - K1873 + 740 - K1874 + 49424JC0032 · ₱95,854,270.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD24J00111 · ₱95,750,259.00 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS ALONG IMELDA-PAYAO-SIAY RD - K1757 + (-899) - K1759 + 176.5024JI0001 · ₱95,535,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SINDANGAN-SIAYAN-DUMINGAG-MAHAYAG RD (S01060MN) K1924+000.00 - K1924+725.00; K1924+968.00 - K1929+436.00; K1929+475.00 - K1929+750.0025JC0038 · ₱95,060,000.00 · mapped
- ROAD WIDENING - SECONDARY ROADS - LILOY - SIOCON ROAD23J00020 · ₱94,844,141.00 · mapped
- ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD21J00037 · ₱93,779,696.06 · mapped
- ROAD UPGRADING (ASPHALT TO CONCRETE) ALONG LILOY TO IPIL ROAD, K1981+108.50 - K1984+359.24, K1984+703.20 - K1986+074.84, TAMPILISAN, ZAMBOANGA DEL NORTE20JC0001 · ₱93,745,890.00 · mapped
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS ALONG SINDANGAN-BAYOG-LAKEWOOD RD - K1731+138 - K1731+490, BRGY. DEPASE, BAYOG, ZAMBOANGA DEL SUR23JG0036 · ₱91,401,760.43 · mapped
- ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD)25J00057 · ₱90,909,691.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGH-WAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD) K1813+842.00-K1814+000.00, K1829+364.00-K1830+300.00, K1830+375.00-K1832+010.0025J00069 · ₱88,207,494.45 · mapped
- REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIP / SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD)25J00053 · ₱85,886,693.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS SINDANGAN - BAYOG - LAKEWOOD, PACKAGE 2, ZAMBOANGA DEL NORTE21J00072 · ₱83,534,046.73 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
