CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, PACKAGE 2, BARANGAY STA. BARBARA SECTION, IMELDA, ZAMBOANGA SIBUGAY
CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, PACKAGE 2, BARANGAY STA. BARBARA SECTION, IMELDA, ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱153,625,286.00. Status: Past target date (DPWH On-Going). Contractor on record: BADSBRO CONST AND GEN MERCHANDISE. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
