PERSAN CONST INC FORMERLY: PERSAN CONST 2852 is listed as a company organization in Philippine public procurement records on this site, with 145 linked DPWH project(s) totaling about ₱8,807,568,255.49. No delivery grade published yet (insufficient linked public records).
PERSAN CONST INC FORMERLY: PERSAN CONST 2852
N/GRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 145
- Total value
- ₱8,807,568,255.49
- Published flags
- 0
- Region
- Metro Manila 3rd DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for PERSAN CONST INC FORMERLY: PERSAN CONST 2852 — not an accusation or finding of wrongdoing.
Not graded yet — the Public Record Grade has not been computed for this contractor.
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
50 geotagged project(s) — Open full map
- CONSTRUCTION OF 4 STOREY W/ BASEMENT PARKING AND ROOF DECK DPWH REGIONAL OFFICE XI, ADMINISTRATIVE, MANPOWER DEVELOPMENT AND FINANCIAL MANAGEMENT BUILDING, R. MAGSAYSAY COR. CHAVEZ STS., DAVAO CITY20L00132 · ₱341,456,028.44 · mapped
- CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES-GENERAL ALEJO SANTOS BRIDGE (BO0013LZ) ALONG BALIWAG-BUSTOS ROAD, PROVINCE OF BULACAN16C00074 · ₱282,746,283.85 · mapped
- CLUSTER 2 1.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (BUSDI BR.), MALAYBALAY CITY 2.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (MATILOM BR.), IMPASUG-ONG, BUKIDNON 3.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD19KA0138 · ₱260,147,547.66 · mapped
- CONSTRUCTION OF MILITARY POLICE BATALLION ADMINISTRATION BUILDING, FORT ANDRES BONIFACIO, TAGUIG CITY20O00014 · ₱231,590,998.26 · mapped
- ROAD WIDENING OF MARINDUQUE CIRCUMFERENTIAL ROAD, KO016+000.00-KO018+351.00, MARINDUQUE21E00042 · ₱228,355,630.17 · mapped
- REPLACEMENT OF WEAK BRIDGES - BINAYAAN BRIDGE (B00037SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, STA. 27+718.40 - STA. 28+226.50, ROMBLON22E00055 · ₱221,912,364.93 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA24C00181 · ₱192,999,969.37 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE-PHASE 3-BALER, AURORA, PROVINCE OF AURORA25C00003 · ₱189,202,290.09 · mapped
- CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 123D00143 · ₱187,214,202.29 · mapped
- CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 223D00142 · ₱187,212,862.78 · mapped
- SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE23E00007 · ₱185,858,997.05 · mapped
- CLUSTER BUK-01 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (MALUSIKOB BR.) MALAYBALAY CITY, BUKIDNON = PHP65,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL STRUCT...20K00369 · ₱185,713,115.49 · mapped
- IMPROVEMENT/WIDENING OF MARINDUQUE CIRCUM. ROAD, SECT. 1: KO070+420 KO072+380 (STA. 70+420-STA. 72+480); SECT. 2: KO092+000-KO092+977 (STA. 92+000-STA. 92+977): SECT. 3: KO098+060-KO098+980 (STA. 98+060-STA. 98+980), MARINDUQUE17E00001 · ₱144,741,732.69 · mapped
- CONSTRUCTION OF BRIDGE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - BRGY. MACAPARI, DAMULOG -SITIO TALASAN, BRGY. PINAMANGGUHAN ROAD, KADINGILAN, BUKIDNON (PACKAGE III)22K00314 · ₱140,696,849.10 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 224D00190 · ₱139,957,436.44 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 324D00207 · ₱137,365,268.11 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 124D00189 · ₱137,125,724.61 · mapped
- BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 424D00208 · ₱131,724,934.97 · mapped
- CLUSTER BUK1-02 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (KULAMAN BR.) MALAYBALAY CITY, BUKIDNON = PHP70,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL ...20K00370 · ₱127,154,662.80 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-JCT BATASAN-SN MATEO-RODRIGUEZ BYPASS LINK ROAD, RIZAL25DO0076 · ₱124,413,132.58 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BOAC-MOGPOG BYPASS ROAD, MARINDUQUE20E00002 · ₱106,149,975.68 · mapped
- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- BOAC-MOGPOG BY-PASS ROAD, MARINDUQUE23E00001 · ₱102,620,734.89 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT ALONG IMUS RIV19DQ0010 · ₱97,464,244.01 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MATEO - RODRIGUEZ RD - K0021+(-418) - K0022+025, K0021+(-463) - K0021+(-418), K0022+025 - K0023+00023DO0003 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYATING RIVER (SEGMENT 5), CAMILING, TARLAC25CJ0010 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REPAIR/REHABILITATION OF MANILA EAST ROAD K0056+000 TO K0064+000 PILILLA, RIZAL21DO0008 · ₱96,500,000.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG GOV JJ LINAO ROAD (SO4822LZ) KO141+600-KO143+147, KO143+345-KO146+000, KO148+365-KO148+820, BATAAN 2ND DISTRICT21CB0053 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-JCT BATASAN-SAN MATEO-RODRIGUEZ BYPASS LINK ROAD, RIZAL24DO0072 · ₱96,500,000.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG ROMAN EXPRESSWAY (SO1313LZ) KO119+000-KO119+200, KO119+800-KO119+923, KO120+000-KO120+665, KO121+871-KO122+067, KO122+113-KO122+531, KO125+466-KO126+1821CB0052 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHANGE (MVUC) AS PER R.A. 11239 - REPAIR/REHABILITATION OF SAN MATEO RODRIGUEZ ROAD, RODRIGUEZ RIZAL K0027+500 - K0034+07821DO0007 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - MARIKINA-INFANTA RD - K0069+200 - K0072+069 TANAY, RIZAL, 2ND LD23DO0017 · ₱96,500,000.00 · mapped
- SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - CONSTRUCTION/REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BAGAC - MARIVELES ROAD KO177+020-KO177+140, BATAAN 2ND DISTRICT21CB0051 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 CONSTRUCTION/REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PAG-ASA - TALA ROAD LEADING TO MT. NATIB, BATAAN NATIONAL PARK,21CA0098 · ₱96,499,999.84 · mapped
- NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH OFFICE BUILDING OF RIZAL 2ND DEO, BARAS, RIZAL25DO0042 · ₱96,361,182.44 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) DR. DAMIAN REYES ROAD (TORRIJOS SIDE) STA. 45+141-STA.47+470.80; T16E00003 · ₱95,807,052.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANK OF SHELTERVILLE CREEK, BARANGAY 171, CALOOCAN CITY18OD0198 · ₱93,917,846.60 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL25DO0012 · ₱92,156,557.61 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF MATARIK, BARANGAY 176 (PHASE 3), CALOOCAN CITY25OD0036 · ₱89,931,184.37 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL23DO0092 · ₱86,850,000.00 · mapped
- REPLACEMENT OF BAMBANG BRIDGE BOCAUE, BULACAN19CC0287 · ₱74,249,494.29 · mapped
- CONSTRUCTION OF 2 UNITS- 4 STOREY - 24 CLASSROOM PARADA NHS, STA. MARIA, BULACAN16CD0205 · ₱73,570,080.00 · mapped
- ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NANGKA RIVER (STA. 0+3823DO0090 · ₱69,480,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (BULONAY BR.), IMPASUG-ONG, BUKIDNON20KA0102 · ₱69,300,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, DR. DAMIAN REYES RD (BOAC SIDE) - K0010+276 - K0011+01421EA0138 · ₱65,869,916.65 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MANILA EAST RD. - K0043+000 - K0044+000, K0046+400 - K0047+305 CARDONA AND MORONG, RIZAL20DO0033 · ₱63,708,280.28 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL/ RIPRAPPING ALONG THE BANK OF CREEKS IN PHASE 7, BARANGAY 176 (PHASE 2), CALOOCAN CITY21OD0096 · ₱61,633,605.84 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEK, PHASE 9, BARANGAY 176, CALOOCAN CITY (PHASE 2)25OD0097 · ₱61,564,008.09 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF F. RODRIGUEZ ...22DO0033 · ₱57,900,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL/ RIPRAPPING ALONGTHE BANK OF CREEKS IN BARANGAY 179 (PHASE 3), CALOOCAN CITY21OD0095 · ₱56,976,882.78 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE BARANGAY TANZA, NAVOTAS CITY25OA0017 · ₱51,473,770.25 · mapped
