Rehabilitation / Major Repair of Flood Control Structure21BI0051

Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya

Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya is a DPWH-tracked public work in NUEVA VIZCAYA, Region II. Reported contract value: ₱29,700,000.00. Status: Reported complete (DPWH). Contractor on record: SHANLEY CONST. Figures trace to sumbong.

NUEVA VIZCAYA, Region II
Region: Region II

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱30,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-21-0014076 · ₱272,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱28,799,704 · SHANLEY CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-05 → 2020-02-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Nueva Vizcaya

Based on the coordinates published with the DPWH record and NOAH file NuevaVizcaya.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0014076

₱272,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0007842

₱50,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0005356

₱5,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0013813

₱3,000,000.00 · FY2021

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Local Program-Flood Control and Drainage-Flood Con

₱28,799,703.81 · SHANLEY CONSTRUCTION

Award / contract ref: 21BI0051

Contractor

A

37 projects · ₱343.5M total · 0 flags

4. Implementation

Contract Amount

₱29,700,000.00

Progress

Reported complete (DPWH)

Start Date

January 12, 2022

Target End

September 30, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.