SHANLEY CONST is listed as a company organization in Philippine public procurement records on this site, with 37 linked DPWH project(s) totaling about ₱343,542,405.39. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
SHANLEY CONST
AGrade by Love the Philippines based on public DPWH project records. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 37
- Total value
- ₱343,542,405.39
- Published flags
- 0
- Region
- Isabela 4th DEO · Region II
Licensed officers (PCAB)
- Patrick Aguila Taguinod · Authorized Managing Officer (PCAB license 35633) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for SHANLEY CONST — not an accusation or finding of wrongdoing.
Score: 90.80 / 100 · Projects in sample: 37 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 93.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 93.2
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 32
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 37
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 37
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 37
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 37
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 37
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
37 geotagged projects — Open full map
- Repair/Rehabilitation/Improvement of Flood Control And Drainage Structure Along Magat River, Bangar Section 2, Brgy. Bangar, Solano, Nueva Vizcaya21BI0047 · ₱29,700,000.00 · mapped
- Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 2, Brgy. Salinas, Bambang, Nueva Vizcaya21BI0052 · ₱29,700,000.00 · mapped
- Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Magat River, Bangar Section 1, Brgy. Bangar, Solano, Nueva Vizcaya21BI0048 · ₱29,700,000.00 · mapped
- Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya21BI0051 · ₱29,700,000.00 · mapped
- CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, BALLESTEROS, CAGAYAN (PHASE 4)22BC0126 · ₱19,600,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, PUROK 5,22BI0053 · ₱14,700,000.00 · mapped
- CONSTRUCTION OF THREE-STOREY (6 CLASSROOMS) 1 SCIENCE LABORATORY 2 ICT BUILDING18BH0096 · ₱14,301,858.37 · mapped
- CONCRETING OF TUROD SUR - MALAPAT- CADAANAN FMR20BH0144 · ₱12,437,500.00 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) 2 ICT LABORATORY BUILDING18BH0091 · ₱9,881,776.09 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) 2 ICT LABORATORY BUILDING18BH0093 · ₱9,789,000.90 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) 2 REGULAR WORKSHOP BUILDING18BH0092 · ₱9,507,549.73 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) 2 SCIENCE LABORATORY BUILDING18BH0072 · ₱9,410,762.57 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) 2 ICT LABORATORY BUILDING18BH0066 · ₱8,998,836.17 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS) 2 ICT LABORATORY BUILDING18BH0063 · ₱8,998,836.17 · mapped
- CONSTRUCTION OF TWO-STOREY 2 ICT LABORATORY BUILDING18BH0122 · ₱8,721,000.00 · mapped
- CONSTRUCTION OF TWO-STOREY (4 CLASSROOMS)18BH0119 · ₱8,720,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SANTIAGO CITY18BH0020 · ₱6,758,295.61 · mapped
- CONSTRUCTION OF 2 STY 4-CL SGT. PROSPERO BELLO HS16BH0057 · ₱5,825,437.91 · mapped
- CONSTRUCTION OF 2 STY 4-CL IMELDA MARCOS HS16BH0051 · ₱5,823,918.97 · mapped
- CONSTRUCTION OF 1 STY 5-CL OF SANTIAGO NORTH CS SPED CENTER (BUILDING 2)17BH0097 · ₱5,804,800.00 · mapped
- CONSTRUCTION OF 1 STY 5-CL OF SANTIAGO NORTH CS SPED CENTER (BUILDING 1)17BH0096 · ₱5,804,800.00 · mapped
- COMPLETION/ UPGRADING/ EXPANSION AND UPGRADING OF EXISTING BUILDING (PHASE II OF III) ECHAGUE DISTRICT HOSPITAL18BH0171 · ₱5,581,000.00 · mapped
- CONCRETING OF BRGY. SAN MIGUEL - BRGY. PLANAS FMR19BH0055 · ₱4,975,000.00 · mapped
- CONCRETING OF BARANGAY RANIAG TO BARANGAY VILLA MARCOS IN RAMON19BH0037 · ₱4,950,000.00 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING BARANGAY GABUT, DUPAX DEL SUR, NUEVA VIZCAYA21BJ0027 · ₱4,751,878.65 · mapped
- CONSTRUCTION/COMPLETION OF A NEW COMMUNITY CENTER (MULTI PURPOSE BUILDING)18BH0035 · ₱4,737,219.77 · mapped
- CONSTRUCTION OF EVACUATION CENTER18BH0127 · ₱4,680,000.00 · mapped
- CONSTRUCTION OF 1 STY 4-CL OF SANTIAGO NORTH CS17BH0092 · ₱4,474,800.00 · mapped
- CONSTRUCTION OF 1 STY 4-CL OF BUGALLON NORTE ES17BH0093 · ₱4,474,800.00 · mapped
- CONSTRUCTION OF 1 STY 4-CLASSROOM OF SAGANA ES17BH0087 · ₱4,356,000.00 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS)18BH0068 · ₱3,166,200.00 · mapped
- CONSTRUCTION OF ONE-STOREY (2 CLASSROOMS) REGULAR WORKSHOP18BH0124 · ₱2,804,000.00 · mapped
- CONSTRUCTION OF ONE-STOREY (2 CLASSROOMS) REGULAR WORKSHOPS18BH0125 · ₱2,774,905.19 · mapped
- CONSTRUCTION OF ONE-STOREY (2 CLASSROOM)18BH0090 · ₱2,666,000.00 · mapped
- CONSTRUCTION OF ONE-STOREY (2 CLASSROOM)18BH0085 · ₱2,666,000.00 · mapped
- CONSTRUCTION OF 1 STY 2-CL OF SANTIAGO NORTH CS17BH0060 · ₱2,306,700.00 · mapped
- CONSTRUCTION (COMPLETION) OF TWO-STOREY 2 ICT LAB18BH0182 · ₱293,529.29 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
