Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Nueva Vizcaya District Engineering Office awarded 60 of 64 recorded flood-control contracts (93.8%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (23.3 percentage points higher; binomial p = 4.1e-06), across 19 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or careful cost estimation in the district.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Nueva Vizcaya District Engineering Office: contracts
60 of 64 contracts (93.8%) at β₯99.5% of ABC Β· peer baseline 70.4% Β· gap +23.3 pts Β· binomial p = 4.1e-6. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 24BI0063 | Construction of Tuao North-Tuao South Flood Control Structure along Magat River, Sitio Dumayop, Tuao North-Tuao South, Bagabag, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 24BI0051 | Construction of Flood Control and Drainage Structure along Cupaz River, San Leonardo Section, Bambang, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 21BI0048 | Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Magat River, Bangar Section 1, Brgy. Bangar, Solano, Nueva Vizcaya | SHANLEY CONST | 100.00% | DPWH |
| 23BI0044 | Construction of Sto. Domingo Flood Control Structure along Magat River, Bambang, Nueva Vizcaya | BRG CONST | 100.00% | DPWH |
| 24BI0058 | Construction of Flood Control and Drainage Structure along Magat River, Tuao South Section, Bagabag, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 21BI0046 | Rehabilitation/Improvement of Flood Control and Drainage Structure along Sta. Cruz River, Salinas Section 1, Bambang, Nueva Vizcaya | SHANLEY CONST / ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22BI0020 | Rehabilitation of Flood Control/Drainage Structure along Matuno River, San Leonardo Section, Bambang, Nueva Vizcaya | J E L CONST & SUPPLY | 100.00% | DPWH |
| 24BI0021 | Construction of Flood Control and Drainage Structures (FCDS- Package 6) along Magat River, Santa Lucia Section, Bagabag, Nueva Viscaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BI0028 | Construction of Magat River Control, Paitan Section (Sta. 0+000 - Sta. 0+580), Bayombong, Nueva Vizcaya | ERIC VAN P SESBRENO CONST / V B GINES CONST | 100.00% | DPWH |
| 23BI0023 | Construction of Busilac - Magsaysay Flood Control along Magat River, Bayombong, Nueva Vizcaya | TRIPLE P CONST | 100.00% | DPWH |
| 24BI0050 | Construction of Flood Control and Drainage Structure along Matuno River, Manamtam Section, Bambang, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 23BI0028 | Construction of Flood Control and Drainage Structures (FCDS) along Magat River, Kinacao Section, Bagabag, Nueva Vizcaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BI0055 | Construction of Sto. Domingo Flood Control, Sto. Domingo, Bambang, Nueva Vizcaya | E T LATAWAN CONST | 100.00% | DPWH |
| 24BI0060 | Construction of Flood Control and Drainage Structure along Magat River, Baretbet Section, Bagabag, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 22BI0035 | Construction of Busilac - Magsaysay Flood Control (Busilac Section) at Barangay Busilac, Bayombong, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 23BI0010 | Rehabilitation of Flood Control along Cupas River, San Leonardo Section, Bambang, Nueva Vizcaya | J E L CONST & SUPPLY | 100.00% | DPWH |
| 24BI0077 | Construction of San Fernando Section 2, Bambang, Nueva Vizcaya | CITRUS COUNTRY CONST | 100.00% | DPWH |
| 24BI0059 | Construction of Flood Control and Drainage Structure along Magat River, Magapuy Section, Bayombong, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 24BI0015 | Construction of Flood Control and Drainage Structures (FCDS- Package 8) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BI0056 | Construction of Sta. Fe River Control Structure, Almaguer South Section, Bambang, Nueva Vizcaya | BRG CONST | 100.00% | DPWH |
| 24BI0038 | Rehabilitation of Flood Control Structure along Magat River, (Phase 1) Barangay Busilac, Bayombong, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 21BI0050 | Construction of Flood Control, Almaguer South, Bambang, Nueva Vizcaya | M R VARGAS CONST CORP FORMERLY: M R VARGAS CONST | 100.00% | DPWH |
| 24BI0039 | Construction of Manamtam Floos Control along Matuno River (Section 2), Bambang, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 21BI0052 | Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 2, Brgy. Salinas, Bambang, Nueva Vizcaya | SHANLEY CONST | 100.00% | DPWH |
| 24BI0049 | Construction of Flood Control and Drainage Structure along Matuno River, Barat Section, Bambang, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 23BI0017 | Rehabilitation of Flood Control along Sta. Cruz River, Barat Section, Bambang, Nueva Vizcaya | J E L CONST & SUPPLY | 100.00% | DPWH |
| 24BI0019 | Rehabilitation of Flood Control Structure along Santa Cruz River, Barangay Salinas, Bambang, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 24BI0062 | Construction of Nalubbunan Flood Control Structure, Angadanan River, Nalubbunan, Quezon, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 23BI0013 | Construction of Bonfal Proper Flood Control along Magat River, Bayombong, Nueva Vizcaya | R O BUILDERS & DEVELOPMENT CORP | 100.00% | DPWH |
| 24BI0048 | Construction of Buliwao Flood Control Structure, Angadanan River, Buliwao, Quezon, Nueva Vizcaya | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 100.00% | DPWH |
| 24BI0007 | Construction of Flood Control and Drainage Structures (FCDS- Package 2) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 24BI0025 | Construction of Flood Control Structure along Magat River, Barangay Magsaysay, Bayombong, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 24BI0020 | Construction of Flood Control Structure along Santa Fe River, Barangay Aliaga, Bambang, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 23BI0018 | Rehabilitation of Flood Control Structure along Magat River, Santa Rosa Section, Bayombong, Nueva Vizcaya | ERIC VAN P SESBRENO CONST / V B GINES CONST | 100.00% | DPWH |
| 24BI0041 | Construction of Bakir Flood Control Structure along Lamut River, Barangay Bakir, Bagabag, Nueva Vizcaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 22BI0019 | Construction of Abian Flood Control Structure along Magat River, Bambang, Nueva Vizcaya | CITRUS COUNTRY CONST | 100.00% | DPWH |
| 24BI0040 | Construction of Bambang Cupas CIS Canal Lining and Flood Control Structure, Bambang, Nueva Vizcaya | N-J CONST | 100.00% | DPWH |
| 23BI0004 | Construction of San Fernando - Macate - Abinganan Flood Control along San Fernando River, Bambang, Nueva Vizcaya | BRG CONST | 100.00% | DPWH |
| 23BI0078 | Construction of Drainage Canal, Bambang, Nueva Vizcaya | BRG CONST | 100.00% | DPWH |
| 22BI0036 | Construction of Homestead Flood Control Structure along Sta. Fe River, Bambang, Nueva Vizcaya | BRG CONST | 100.00% | DPWH |
| 23BI0005 | Construction of Macate Flood Control Structure along Magat River, Bambang, Nueva Vizcaya | M R VARGAS CONST CORP FORMERLY: M R VARGAS CONST | 100.00% | DPWH |
| 24BI0055 | Rehabilitation of Flood Control Structure along Magat River, Sto. Vista Alegra Section, Package 1, Bayombong, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 24BI0056 | Rehabilitation of Flood Control Structure along Magat River, Sto. Domingo Section, Package 2, Bambang, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 24BI0057 | Construction of Flood Control and Drainage Structure along Magat River, Tuao North Section, Bagabag, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 22BI0017 | Construction of Magat River Control, Magapuy Section (Sta. 0+000 - Sta. 0+484), Bayombong, Nueva Vizcaya | BRG CONST | 100.00% | DPWH |
| 24BI0008 | Construction of Flood Control and Drainage Structures (FCDS- Package 7) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BI0062 | Construction of Buenavista - Busilac Flood Control Structure along Magat River, Bayombong, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 23BI0026 | Construction of Flood Control and Drainage Structures (FCDS) along Sta. Fe River, Almaguer North Section, Bambang, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 24BI0037 | Rehabilitation of Flood Control Structure along Magat River (Phase 2), Barangay Sta. Rosa, Bayombong, Nueva Vizcaya | DALCON CONST | 100.00% | DPWH |
| 21BI0047 | Repair/Rehabilitation/Improvement of Flood Control And Drainage Structure Along Magat River, Bangar Section 2, Brgy. Bangar, Solano, Nueva Vizcaya | SHANLEY CONST | 100.00% | DPWH |
| 21BI0049 | Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure along Magat River, Macate Section, Brgy. Macate, Bambang, Nueva Vizcaya | JANN-NORRIS CONST AND SUPPLIES INC FORMELY: JANN-NORRIS CONST AND SUPPLIES | 100.00% | DPWH |
| 24BI0061 | Construction of Sta. Lucia Flood Control Structure along Lamut River, Barangay Sta. Lucia, Bagabag, Nueva Vizcaya | V B MANUBAY CONST | 100.00% | DPWH |
| 22BI0046 | Rehabilitation of Flood Control and Drainage Structures along Magat River, Vista Alegre Section (Phase 5), Sta. 0 + 363.85 - Sta. 0 + 413.85, Sta. 0 + 593.85 - | G M PAJARILLAGA CONST & SUPPLY | 100.00% | DPWH |
| 22BI0010 | Construction of Buenavista River Control along Magat River, Buenavista Section, Bayombong, Nueva Vizcaya | A J LAVA BUILDERS CORP FORMERLY: A J LAVA BUIL / R O BUILDERS & DEVELOPMENT CORP | 100.00% | DPWH |
| 24BI0009 | Construction of Flood Control and Drainage Structures (FCDS- Package 3) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 21BI0051 | Repair/Rehabilitation/Improvement of Flood Control and Drainage Structure Along Sta. Cruz River, Salinas Section 1, Brgy. Salinas, Bambang, Nueva Vizcaya | SHANLEY CONST | 100.00% | DPWH |
| 24BI0034 | Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva Viscaya | EGB CONST CORP FORMERLY: EGB CONST | 100.00% | DPWH |
| 23BI0027 | Rehabilitation of Flood Control Structure along Santa Fe River, Indiana Section, Bambang, Nueva Vizcaya | CITRUS COUNTRY CONST | 100.00% | DPWH |
| 23BI0014 | Construction of Nalubbunan Flood Control along Magat River, Quezon, Nueva Vizcaya | R O BUILDERS & DEVELOPMENT CORP | 100.00% | DPWH |
| 23BI0043 | Infrastructure/ Facilities - Construction of Barat Flood Control Structure along Sta. Cruz River, Bambang, Nueva Vizcaya | E T LATAWAN CONST | 99.97% | DPWH |
| 23BI0090 | Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal River - Busilac Section along Magat River, Bayombong, Nueva V | J E L CONST & SUPPLY | 98.97% | DPWH |
| 23BI0016 | Rehabilitation of Flood Control along Sta. Cruz River, Aliaga Section, Bambang, Nueva Vizcaya | J E L CONST & SUPPLY | 94.96% | DPWH |
| 21B00068 | Construction of Flood Control System, Brgy. Salinas, Bambang, Nueva Vizcaya | J H PAJARA CONST CORP | 93.56% | DPWH |
| 21BI0045 | Improvement of Manamtam River Control along Matuno River, Manamtam Section, Sta. 0+360 - Sta. 0+510, Bambang, Nueva Vizcaya | J E L CONST & SUPPLY | 83.40% | DPWH |
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC β₯ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Nueva Vizcaya District Engineering Office",
"nearAbc": 60,
"trigger": "office_pattern_aggregate",
"officeId": "81d4104a-5024-58f6-9405-afe8ac7a6cef",
"threshold": 0.995,
"binomialTailP": 0.0000041017235112484435,
"nearAbcRatePct": 93.8,
"totalContracts": 64,
"baselineRatePct": 70.4,
"excessPctPoints": 23.3,
"expectedNearAbc": 45.1,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at β₯99.5% of ABC"
}Source documents
Possible Innocent Explanations
Data not yet available (source: rule metadata)