Construction of Flood Mitigation Structure23BI0043

Infrastructure/ Facilities - Construction of Barat Flood Control Structure along Sta. Cruz River, Bambang, Nueva Vizcaya

Infrastructure/ Facilities - Construction of Barat Flood Control Structure along Sta. Cruz River, Bambang, Nueva Vizcaya is a DPWH-tracked public work in BAMBANG (NUEVA VIZCAYA), NUEVA VIZCAYA, Region II. Reported contract value: ₱48,987,038.54. Status: Reported complete (DPWH). Contractor on record: E T LATAWAN CONST. Figures trace to sumbong.

BAMBANG (NUEVA VIZCAYA), NUEVA VIZCAYA, Region II
Region: Region II

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Infrastructure/ Facilities - Construction of Barat Flood Control Structure along Sta. Cruz River, Bambang, Nueva Vizcaya
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Nueva Vizcaya District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

49 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF CANAN BRIDGE, LA PAZ, ABRA

Abra DEO, Cordillera Administrative Region

2024₱140.2M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE I, CALABA, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱139.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE 2, CALABA, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱139.8M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF OTIP BRIDGE, TUBO, ABRA

Abra DEO, Cordillera Administrative Region

2024₱138.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE APPROACHES, PALAO, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱137.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱137.4M
Past target date (DPWH On-Going)
View all 49 projects →

4. Implementation

Contract Amount

₱48,987,038.54

Progress

Reported complete (DPWH)

Start Date

March 13, 2023

Target End

October 28, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.