Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 23GG0111 and 22GG0093 have near-identical descriptions about 7576 m apart (funding years 2022, 2023; ₱48.51M, ₱43.22M). Worth checking whether they cover the same works. These may be separate segments of flood control along the same river, funded in different years.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Jalaur River, Pototan, Iloilo22GG0093Flood control | 100% | September 10, 2022 | October 29, 2023 | — | completedsumbong source |
Start: March 29, 2022 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "22GG0093",
"fundingYear": 2022,
"municipality": "POTOTAN (ILOILO)",
"distanceMeters": 7575.570945869223,
"titleSimilarity": 1
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately
