Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23D00077 was awarded at 100.00% of its ABC. Across its 21 recorded contracts, YPR GEN CONTRACTOR AND CONST SUPPLY INC was awarded at ≥99.5% of ABC 20 times (95.2%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.

Public record entityConstruction of Flood Control Structure along Bilibiran Creek, Binangonan, Rizal
LocationBINANGONAN (RIZAL), RIZAL, Region IV-AContract 23D00077
Amount₱106,149,946.50100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Bilibiran Creek, Binangonan, Rizal23D00077Flood control100%February 4, 2024February 4, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 11, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Rizal 1st District Engineering Office",
  "ratio": 0.9999994959962317,
  "abcPhp": 106150000,
  "threshold": 0.995,
  "contractId": "23D00077",
  "contractor": "YPR GEN CONTRACTOR AND CONST SUPPLY INC",
  "contractCostPhp": 106149946.5
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalBinangonanTagpos
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Active fault12.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.