Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 12 contracts awarded to W J P CONST AND SUPPLY by the same office started within 79 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 10 in the same municipality. It is possible these are separate phases or segments of a larger flood control program scheduled for efficiency.

Public record entityConstruction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 4)
LocationBINALONAN (PANGASINAN), PANGASINAN, Region IContract 24AI0017
Amount₱48,819,534.05 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 4)24AI0017100%September 8, 2024April 29, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 21, 2024 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold in one municipality

{
  "deo": "Pangasinan 3rd District Engineering Office",
  "contractId": "24AI0017",
  "contractor": "W J P CONST AND SUPPLY",
  "windowDays": 120,
  "clusterSize": 12,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48819534.05,
  "maxInOneMunicipality": 10
}

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanBinalonanMangcasuy
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault4.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.