Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 11 contracts awarded to A C SOLIVEN CONST & GEN MERCHANDISE by the same office started within 46 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 9 in the same municipality. It is possible that these are separate projects for different sections or riverbanks, all scheduled in the same period for efficiency.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, San Jose-San Bartolome Section (Package C), Gerona, Tarlac23CJ0016Flood control | 100% | July 29, 2023 | June 19, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: January 30, 2023 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold in one municipality
{
"deo": "Tarlac District Engineering Office",
"contractId": "23CJ0016",
"contractor": "A C SOLIVEN CONST & GEN MERCHANDISE",
"windowDays": 120,
"clusterSize": 11,
"thresholdPhp": 50000000,
"contractCostPhp": 48016060.76,
"maxInOneMunicipality": 9
}Source documents
