Cross-Source Mismatch (PhilGEPS vs DPWH)

Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: PhilGEPS award 23CG0134 lists ₱70.20M to STO. CRISTO CONSTRUCTION AND TRADING ., while DPWH records contract 23CG0134 at ₱91.19M to STO CRISTO CONST & TRADING INC FOR: STO CRISTO CONST & TRADING. The difference may be due to a contract variation, amendment, or a clerical error in recording the contractor's name or contract amount.

Public record entityConstruction of Slope Protection Works at Malasik River, Phase II (San Agustin Section) Barangay San Agustin, Candaba, Pampanga.
LocationCANDABA (PAMPANGA), PAMPANGA, Region IIIContract 23CG0134
Amount₱91,192,478.11 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection Works at Malasik River, Phase II (San Agustin Section) Barangay San Agustin, Candaba, Pampanga.23CG0134Flood control100%February 3, 2024February 3, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 12, 2023 · Source fetched October 21, 2026

Rule Definition

Compares linked award and project contractor/cost above tolerance.

Triggering Data & citations

Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record

{
  "linkId": "c6bfdcb4-99b7-4a4e-9b6c-28e11a833e51",
  "awardId": "1485db26-92d9-44a9-827d-9dabe7228407",
  "linkScore": 1,
  "nameMismatch": true,
  "amountMismatch": true,
  "awardAmountPhp": 70203736.33,
  "linkValidation": "philgeps_ref equals DPWH contract ID",
  "projectCostPhp": 91192478.11,
  "philgepsAwardee": "STO. CRISTO CONSTRUCTION AND TRADING ."
}

Possible Innocent Explanations

  • The difference may be due to a contract variation, amendment, or a clerical error in recording the contractor's name or contract amount.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaCandabaSan Agustin
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Active fault40.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.