Love the Philippines

Anomaly / indicator worth examining β€” not an accusation.

Ito ay istatistikong anomalya o indikador na dapat suriin β€” hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Bid-Ceiling Hugging

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining β€” not proof of wrongdoing, fraud, or corruption against any person.

Indicator: Cebu 6th District Engineering Office awarded 50 of 53 recorded flood-control contracts (94.3%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (23.9 percentage points higher; binomial p = 1.7e-05), across 26 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or cost estimates that closely match market prices.

Public record entityData not yet available
Locationβ€”
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Cebu 6th District Engineering Office: contracts

50 of 53 contracts (94.3%) at β‰₯99.5% of ABC Β· peer baseline 70.4% Β· gap +23.9 pts Β· binomial p = 1.7e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).

ContractTitleContractor% of ABCSource
22HN0009Construction of Flood Control Structure along Cansaga River, Barangay Polog, Consolacion, CebuPHIL ASIA RESOURCES & DEVELOPMENT CORP / WTG CONST & DEVELOPMENT CORP100.00%DPWH
22HN0078Construction of Slope Protection along Panas Road, Brgy. Panas, Consolacion, Cebu (Package II)QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22HN0075Construction of Slope Protection along Panas Road, Brgy. Panas, Consolacion, Cebu (Package I)QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22HN0080Construction of Slope Protection along Panoypoy Road, Brgy. Panoypoy, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
23HN0093Construction of Flood Control Structure along Cansaga River, Barangay Polog, Phase II, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
23HN0095Construction of Slope Protection Structure along Panoypoy-Panas Road, Consolacion, CebuGONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R100.00%DPWH
22HN0071Construction of Slope Protection along Garing Road, Brgy. Garing, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
24HN0048Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, CebuGONZALODO ENT / WTG CONST & DEVELOPMENT CORP100.00%DPWH
22HN0073Construction of Slope Protection along Lanipga Road, Brgy. Lanipga, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22HN0008Construction of Flood Control Structure along Cansaga River with Box Culvert, Barangay Danglag, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
22HN0076Construction of Flood Control Structure along Cansag River, Brgy Danglag (Phase IV), Consolacion, CebuA S T BUILDERS100.00%DPWH
23H00059Construction of Flood Mitigation Structure along Tipolo River, Mandaue City, CebuZLREJ TRADING AND CONST CORP / GICAR CONST INC100.00%DPWH
23HN0051Construction of Flood Control/Drainage in barangays Basak and Babag (Phase 3), Lapu-Lapu CityFLORIANE CONST CORP FORMERLY: FLORIANE CONST & SUPPLY100.00%DPWH
22HN0001Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, CebuBNR CONST & DEVELOPMENT CORP100.00%DPWH
23HN0098Construction of Slope Protection System along Panas Road, Barangay Panas (Phase III), Consolacion, CebuGICAR CONST INC100.00%DPWH
22HN0038Construction of Sewage Treatment Plant, Barangay Pajo, Lapu-lapu, CebuMEGA PLUS CONST AND SUPPLY CORP FORMERLY: MEGA PLUS CONST100.00%DPWH
23HN0092Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Polog, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22H00025Construction of Tayud Causeway, Barangay Tayud, Sta. 0+000 - Sta. 0 + 850, Consolacion, CebuMORTAR MASTERS & CONCRETE BUILDERS / VSP STRUCTURE VENTURES CORP FORMERLY: VIRLO CONST100.00%DPWH
24H00082Construction of Flood Control Structure along Jagobiao Creek, Phase 3, Barangay Casili to Barangay Sacsac, Consolacion, CebuZLREJ TRADING AND CONST CORP99.99%DPWH
23HN0101Construction of Flood Control Structure along Cansaga River,Barangay Garing, Consolacion, CebuGTM BUILDERS & SUPPLY / ECBJ EASTCOAST CONST99.98%DPWH
23HN0056Construction of Flood Control Structure along Basak Creek, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.97%DPWH
24HN0072Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili to Barangay Sacsac, Phase II, Consolacion, CebuRUDHIL CONST & ENT INC FORMERLY R99.97%DPWH
24HN0092Construction of Flood Control Structure along Cansaga River, Barangay Nangka (Phase III), Consolacion, CebuGONZALODO ENT99.94%DPWH
24HN0130Construction of Flood Control Structure along Jagobiao Creek, Poblacion Oriental, Consolacion, CebuGONZALODO ENT99.94%DPWH
23HN0088Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, CebuNEOVENTURES CONST99.93%DPWH
25HN0043Construction of Flood Control Structure along Butuanon River (Downstream) Outfall, Barangay Pakna-an, Mandaue City, CebuON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST99.93%DPWH
23HN0089Construction of Flood Control Structure along Jagobiao, Barangay Casili, Consolacion, CebuRUDHIL CONST & ENT INC FORMERLY R / XLA CONST99.93%DPWH
23HN0104Construction of Slope Protection System along Panoypoy Road (Phase III), Barangay Panoypoy, Consolacion, CebuVICENTE T LAO CONST99.92%DPWH
23HN0094Construction of Slope Protection Structure along Garing-Panas Road, Phase II, Consolacion, CebuGONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R99.91%DPWH
24HN0090Construction of River Capacity Enhancement Structure along Butuanon River, Barangay Casuntingan-Barangay Cabancalan, Mandaue City, Cebu, (Phase 6)QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0064Construction/Improvement of Flood Control Structure along Butuanon River (Phase VIII), Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP99.90%DPWH
23HN0114Construction of Flood Control Structure along Basak Creek, Mandaue City, Cebu, Phase IIQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0113Construction of Flood Control Structure along Butuanon River (Phase IX) Upstream, Brgy. Tabok, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
24HN0024Construction of Flood Control Structure along Cansaga River, Barangay Garing, Phase 3, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0071Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Tabok, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0049Construction of Flood Control Structure along Butuanon River (Phase VII), Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0128Construction of Flood Control Structure along Butuanon River Upstream, Barangay Maguikay, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.89%DPWH
23HN0050Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Alang-Alang, Mandaue City, CebuON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST99.87%DPWH
24HN0191Construction of Flood Control Structure along Orel Creek, Barangay Banilad, Mandaue CityZLREJ TRADING AND CONST CORP99.85%DPWH
23H00057Construction of Flood Mitigation Structure along Butuanon River (Upstream - Phase 2), Barangay Maguikay, Mandaue City, CebuZLREJ TRADING AND CONST CORP / GICAR CONST INC99.83%DPWH
24HN0102Construction of Flood Control Structure along Butuanon River, Phase 5, Barangay Tingub - Barangay Canduman, Mandaue City, CebuZLREJ TRADING AND CONST CORP99.83%DPWH
23HN0090Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili, Mandaue City, Cebu, Phase 2PHIL ASIA RESOURCES & DEVELOPMENT CORP / WTG CONST & DEVELOPMENT CORP99.81%DPWH
22HN0070Rehabilitation of Drainage with Sidewalk at G. Ouna St., Alang Alang Mandaue CityPLD CONST AND DEVELOPMENT INC FORMERLY: PLD CONST99.80%DPWH
23HN0091Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Garing, Consolacion, Cebu, Phase 6ZLREJ TRADING AND CONST CORP / GICAR CONST INC99.80%DPWH
24HN0162Construction of Drainage System, Barangay Casuntingan, Mandaue City, CebuON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST99.78%DPWH
25HN0034Construction of Drainage Structure, Barangay Sacsac, Consolacion, CebuXLA CONST99.78%DPWH
24HN0075Construction of Drainage System along R. A. Ouano Road, Barangay Opao, Mandaue City, CebuA S T BUILDERS99.74%DPWH
24HN0122Construction of Drainage System, Barangay Tipolo, Mandaue City, CebuEMMARC CONST99.69%DPWH
23HN0087Construction of Flood Control Structure along Pitogo River, Phase III, Consolacion, CebuKYLE CONST SERVICES99.67%DPWH
23HN0107Construction of Flood Control Project, Brgy. Caubian, Olango Island, Lapu-Lapu City, CebuFLORIANE CONST CORP FORMERLY: FLORIANE CONST & SUPPLY99.62%DPWH
21HN0069Construction of Flood Control/Drainage, Barangay Marigondon, Basak and Babag, Lapu-lapu City, CebuEDANNA CONST / GOLDFIN CONST & DEVELOPMENT CORP FORMERLY: GOLDFIN CONST96.98%DPWH
21HN0071Construction of Flood Control/Drainage in barangays Marigondon Phase 2, Basak and Babag, Lapu-Lapu CityGOLDFIN CONST & DEVELOPMENT CORP FORMERLY: GOLDFIN CONST92.41%DPWH
23HN0106Rehabilitation of Road and Drainage System along George Tampus Road, Brgy. Basak, Lapu-Lapu CityFLORIANE CONST CORP FORMERLY: FLORIANE CONST & SUPPLY57.89%DPWH

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β€” not inferred beyond those columns.

Completion schedule is shown for project and contractor flags only.

Rule Definition

ContractCost / ABC β‰₯ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Implementing office awards near-ABC contracts far more often than the flood-control baseline

{
  "office": "Cebu 6th District Engineering Office",
  "nearAbc": 50,
  "trigger": "office_pattern_aggregate",
  "officeId": "e7575b92-69cd-50a9-b55c-fb061f832d8c",
  "threshold": 0.995,
  "binomialTailP": 0.00001676319939130731,
  "nearAbcRatePct": 94.3,
  "totalContracts": 53,
  "baselineRatePct": 70.4,
  "excessPctPoints": 23.9,
  "expectedNearAbc": 37.3,
  "baselineDefinition": "share of all Sumbong flood-control contracts awarded at β‰₯99.5% of ABC"
}

Possible Innocent Explanations

Data not yet available (source: rule metadata)