Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: Cebu 6th District Engineering Office awarded 50 of 53 recorded flood-control contracts (94.3%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (23.9 percentage points higher; binomial p = 1.7e-05), across 26 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or cost estimates that closely match market prices.

Public record entityData not yet available
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Cebu 6th District Engineering Office: contracts

50 of 53 contracts (94.3%) at ≥99.5% of ABC · peer baseline 70.4% · gap +23.9 pts · binomial p = 1.7e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).

ContractTitleContractor% of ABCSource
22HN0009Construction of Flood Control Structure along Cansaga River, Barangay Polog, Consolacion, CebuPHIL ASIA RESOURCES & DEVELOPMENT CORP / WTG CONST & DEVELOPMENT CORP100.00%DPWH
22HN0078Construction of Slope Protection along Panas Road, Brgy. Panas, Consolacion, Cebu (Package II)QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22HN0075Construction of Slope Protection along Panas Road, Brgy. Panas, Consolacion, Cebu (Package I)QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22HN0080Construction of Slope Protection along Panoypoy Road, Brgy. Panoypoy, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
23HN0093Construction of Flood Control Structure along Cansaga River, Barangay Polog, Phase II, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
23HN0095Construction of Slope Protection Structure along Panoypoy-Panas Road, Consolacion, CebuGONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R100.00%DPWH
22HN0071Construction of Slope Protection along Garing Road, Brgy. Garing, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
24HN0048Construction of Flood Control Structure along Cansaga River, Barangay Tilhaong, Consolacion, CebuGONZALODO ENT / WTG CONST & DEVELOPMENT CORP100.00%DPWH
22HN0073Construction of Slope Protection along Lanipga Road, Brgy. Lanipga, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22HN0008Construction of Flood Control Structure along Cansaga River with Box Culvert, Barangay Danglag, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
22HN0076Construction of Flood Control Structure along Cansag River, Brgy Danglag (Phase IV), Consolacion, CebuA S T BUILDERS100.00%DPWH
23H00059Construction of Flood Mitigation Structure along Tipolo River, Mandaue City, CebuZLREJ TRADING AND CONST CORP / GICAR CONST INC100.00%DPWH
23HN0051Construction of Flood Control/Drainage in barangays Basak and Babag (Phase 3), Lapu-Lapu CityFLORIANE CONST CORP FORMERLY: FLORIANE CONST & SUPPLY100.00%DPWH
22HN0001Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, CebuBNR CONST & DEVELOPMENT CORP100.00%DPWH
23HN0098Construction of Slope Protection System along Panas Road, Barangay Panas (Phase III), Consolacion, CebuGICAR CONST INC100.00%DPWH
22HN0038Construction of Sewage Treatment Plant, Barangay Pajo, Lapu-lapu, CebuMEGA PLUS CONST AND SUPPLY CORP FORMERLY: MEGA PLUS CONST100.00%DPWH
23HN0092Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Polog, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP100.00%DPWH
22H00025Construction of Tayud Causeway, Barangay Tayud, Sta. 0+000 - Sta. 0 + 850, Consolacion, CebuMORTAR MASTERS & CONCRETE BUILDERS / VSP STRUCTURE VENTURES CORP FORMERLY: VIRLO CONST100.00%DPWH
24H00082Construction of Flood Control Structure along Jagobiao Creek, Phase 3, Barangay Casili to Barangay Sacsac, Consolacion, CebuZLREJ TRADING AND CONST CORP99.99%DPWH
23HN0101Construction of Flood Control Structure along Cansaga River,Barangay Garing, Consolacion, CebuGTM BUILDERS & SUPPLY / ECBJ EASTCOAST CONST99.98%DPWH
23HN0056Construction of Flood Control Structure along Basak Creek, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.97%DPWH
24HN0072Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili to Barangay Sacsac, Phase II, Consolacion, CebuRUDHIL CONST & ENT INC FORMERLY R99.97%DPWH
24HN0092Construction of Flood Control Structure along Cansaga River, Barangay Nangka (Phase III), Consolacion, CebuGONZALODO ENT99.94%DPWH
24HN0130Construction of Flood Control Structure along Jagobiao Creek, Poblacion Oriental, Consolacion, CebuGONZALODO ENT99.94%DPWH
23HN0088Construction of Flood Control Structure along Cansaga River, Barangay Danglag, Consolacion, CebuNEOVENTURES CONST99.93%DPWH
25HN0043Construction of Flood Control Structure along Butuanon River (Downstream) Outfall, Barangay Pakna-an, Mandaue City, CebuON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST99.93%DPWH
23HN0089Construction of Flood Control Structure along Jagobiao, Barangay Casili, Consolacion, CebuRUDHIL CONST & ENT INC FORMERLY R / XLA CONST99.93%DPWH
23HN0104Construction of Slope Protection System along Panoypoy Road (Phase III), Barangay Panoypoy, Consolacion, CebuVICENTE T LAO CONST99.92%DPWH
23HN0094Construction of Slope Protection Structure along Garing-Panas Road, Phase II, Consolacion, CebuGONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R99.91%DPWH
24HN0090Construction of River Capacity Enhancement Structure along Butuanon River, Barangay Casuntingan-Barangay Cabancalan, Mandaue City, Cebu, (Phase 6)QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0064Construction/Improvement of Flood Control Structure along Butuanon River (Phase VIII), Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST / ZLREJ TRADING AND CONST CORP99.90%DPWH
23HN0114Construction of Flood Control Structure along Basak Creek, Mandaue City, Cebu, Phase IIQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0113Construction of Flood Control Structure along Butuanon River (Phase IX) Upstream, Brgy. Tabok, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
24HN0024Construction of Flood Control Structure along Cansaga River, Barangay Garing, Phase 3, Consolacion, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0071Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Tabok, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0049Construction of Flood Control Structure along Butuanon River (Phase VII), Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
23HN0128Construction of Flood Control Structure along Butuanon River Upstream, Barangay Maguikay, Mandaue City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.89%DPWH
23HN0050Construction/Improvement of Flood Control Structure along Butuanon River, Brgy. Alang-Alang, Mandaue City, CebuON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST99.87%DPWH
24HN0191Construction of Flood Control Structure along Orel Creek, Barangay Banilad, Mandaue CityZLREJ TRADING AND CONST CORP99.85%DPWH
23H00057Construction of Flood Mitigation Structure along Butuanon River (Upstream - Phase 2), Barangay Maguikay, Mandaue City, CebuZLREJ TRADING AND CONST CORP / GICAR CONST INC99.83%DPWH
24HN0102Construction of Flood Control Structure along Butuanon River, Phase 5, Barangay Tingub - Barangay Canduman, Mandaue City, CebuZLREJ TRADING AND CONST CORP99.83%DPWH
23HN0090Construction of Flood Control Structure along Jagobiao Creek, Barangay Casili, Mandaue City, Cebu, Phase 2PHIL ASIA RESOURCES & DEVELOPMENT CORP / WTG CONST & DEVELOPMENT CORP99.81%DPWH
22HN0070Rehabilitation of Drainage with Sidewalk at G. Ouna St., Alang Alang Mandaue CityPLD CONST AND DEVELOPMENT INC FORMERLY: PLD CONST99.80%DPWH
23HN0091Construction of Flood Control Structure along Cansaga River, Barangay Danglag to Barangay Garing, Consolacion, Cebu, Phase 6ZLREJ TRADING AND CONST CORP / GICAR CONST INC99.80%DPWH
24HN0162Construction of Drainage System, Barangay Casuntingan, Mandaue City, CebuON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST99.78%DPWH
25HN0034Construction of Drainage Structure, Barangay Sacsac, Consolacion, CebuXLA CONST99.78%DPWH
24HN0075Construction of Drainage System along R. A. Ouano Road, Barangay Opao, Mandaue City, CebuA S T BUILDERS99.74%DPWH
24HN0122Construction of Drainage System, Barangay Tipolo, Mandaue City, CebuEMMARC CONST99.69%DPWH
23HN0087Construction of Flood Control Structure along Pitogo River, Phase III, Consolacion, CebuKYLE CONST SERVICES99.67%DPWH
23HN0107Construction of Flood Control Project, Brgy. Caubian, Olango Island, Lapu-Lapu City, CebuFLORIANE CONST CORP FORMERLY: FLORIANE CONST & SUPPLY99.62%DPWH
21HN0069Construction of Flood Control/Drainage, Barangay Marigondon, Basak and Babag, Lapu-lapu City, CebuEDANNA CONST / GOLDFIN CONST & DEVELOPMENT CORP FORMERLY: GOLDFIN CONST96.98%DPWH
21HN0071Construction of Flood Control/Drainage in barangays Marigondon Phase 2, Basak and Babag, Lapu-Lapu CityGOLDFIN CONST & DEVELOPMENT CORP FORMERLY: GOLDFIN CONST92.41%DPWH
23HN0106Rehabilitation of Road and Drainage System along George Tampus Road, Brgy. Basak, Lapu-Lapu CityFLORIANE CONST CORP FORMERLY: FLORIANE CONST & SUPPLY57.89%DPWH

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Completion schedule is shown for project and contractor flags only.

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Implementing office awards near-ABC contracts far more often than the flood-control baseline

{
  "office": "Cebu 6th District Engineering Office",
  "nearAbc": 50,
  "trigger": "office_pattern_aggregate",
  "officeId": "e7575b92-69cd-50a9-b55c-fb061f832d8c",
  "threshold": 0.995,
  "binomialTailP": 0.00001676319939130731,
  "nearAbcRatePct": 94.3,
  "totalContracts": 53,
  "baselineRatePct": 70.4,
  "excessPctPoints": 23.9,
  "expectedNearAbc": 37.3,
  "baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}