Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 3 contracts awarded to FLORDES CONST & TRADING CORP FORMERLY FLO by the same office started within 1 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible these are separate flood control projects at different locations within Manila, each requiring its own contract.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Retention Basin along Estero de Sampaloc (Phase I), Manila City22OE0009Flood control | 100% | February 26, 2023 | February 26, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: February 16, 2022 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "North Manila District Engineering Office",
"contractId": "22OE0009",
"contractor": "FLORDES CONST & TRADING CORP FORMERLY FLO",
"windowDays": 120,
"clusterSize": 3,
"thresholdPhp": 50000000,
"contractCostPhp": 47470673.29,
"averageTitleSimilarity": 0.9439438414144244
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program