Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24CE0218 and 24CE0219 have near-identical descriptions about 225 m apart (funding year 2024; ₱19.11M, ₱28.66M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or expansion of the first, but the first was not labeled as a phase.

Public record entityConstruction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Macamias, Guimba, Nueva Ecija (Phase 2)
LocationGUIMBA (NUEVA ECIJA), NUEVA ECIJA, Region IIIContract 24CE0219
Amount₱28,660,430.44 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Macamias, Guimba, Nueva Ecija (Phase 2)24CE0219Flood control100%September 27, 2024September 20, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 1, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24CE0219",
  "coordinates": {
    "lat": 15.6198,
    "lon": 120.69996
  },
  "municipality": "GUIMBA (NUEVA ECIJA)",
  "distanceMeters": 224.94385838909054,
  "titleSimilarity": 0.8837209302325582
}

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction/Rehabilitation of Flood Control Structures along Rio Chico River, Brgy. Macamias, Guimba, Nueva Ecija (Phase 2).” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/168cd16c-a1ec-4954-84d6-c4ab68ad5328

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaGuimbaCalem
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault34.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.