Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24CJ0004 lists a cost of ₱92.95M, 2.59% above its Approved Budget for the Contract of ₱90.61M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a clerical error or a post-bid adjustment that was not reflected in the ABC field.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Rio Chico River (Section C), Victoria, Tarlac24CJ0004Flood control | 100% | October 5, 2024 | October 5, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: February 13, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Tarlac District Engineering Office",
"ratio": 1.0259067357512954,
"abcPhp": 90606745,
"threshold": 0.995,
"contractId": "24CJ0004",
"contractor": "ROYAL CROWN MONARCH CONST & SUPPLIES CORP",
"contractCostPhp": 92954070
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to a clerical error or a post-bid adjustment that was not reflected in the ABC field.
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Structure along Rio Chico River (Section C), Victoria, Tarlac.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/217ac000-a6af-4818-84a5-514f8a72086a
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.