Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 23A00188 and 22A00010 have near-identical descriptions about 584 m apart (funding years 2022, 2023; ₱91.67M, ₱101.33M). Worth checking whether they cover the same works. It is possible that these are sequential phases or adjacent segments of a larger flood mitigation project, but the titles do not specify any distinction.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure along Bued River, Brgy. Anonang, San Fabian, Pangasinan, Phase II22A00010Flood control | 100% | April 27, 2023 | March 24, 2023 | — | completedsumbong source |
Start: February 24, 2022 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "22A00010",
"fundingYear": 2022,
"municipality": "SAN FABIAN (PANGASINAN)",
"distanceMeters": 584.3667166432388,
"titleSimilarity": 1
}Source documents
Possible Innocent Explanations
- Phased construction seasons
- Upstream/downstream segments recorded separately