Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24OH0043 (₱24.49M) is recorded as completed in 69 days against 219 planned; similar-cost projects take a median of 182 days, putting it in the fastest 4.4%. The contractor may have deployed extra resources or worked overtime to finish ahead of schedule.

Public record entityConstruction of Drainage System, Zone 91, Pandacan, Manila
LocationCITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital RegionContract 24OH0043
Amount₱24,492,317.29 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Drainage System, Zone 91, Pandacan, Manila24OH0043Flood control100%September 27, 2024April 30, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 21, 2024 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2024-02-21T00:00:00.000Z",
  "contractId": "24OH0043",
  "actualEndDate": "2024-04-30T00:00:00.000Z",
  "targetEndDate": "2024-09-26T00:00:00.000Z",
  "contractCostPhp": 24492317.29
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaPandacanBarangay 834
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Active fault7.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA3 (4.01-5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.