Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23FG0039 was awarded at 100.00% of its ABC. Across its 23 recorded contracts, HGG BUILDERS & SUPPLY was awarded at ≥99.5% of ABC 22 times (95.7%), versus 70.4% for flood-control contracts overall. It is possible that the bid was calculated to exactly match the ABC, which is allowed but rare.

Public record entityConstruction of Flood Control System of Mahaba Creek leading to Tambang River (Phase 2), Sitio Palayan, Brgy. Lamon, Goa, Camarines Sur
LocationGOA (CAMARINES SUR), CAMARINES SUR, Region VContract 23FG0039
Amount₱95,536,200.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control System of Mahaba Creek leading to Tambang River (Phase 2), Sitio Palayan, Brgy. Lamon, Goa, Camarines Sur23FG0039Flood control100%April 1, 2024April 1, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 26, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Camarines Sur 4th District Engineering Office",
  "ratio": 1,
  "abcPhp": 95536200,
  "threshold": 0.995,
  "contractId": "23FG0039",
  "contractor": "HGG BUILDERS & SUPPLY",
  "contractCostPhp": 95536200
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurGoaLamon
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Matmo 2025Bualoi 2025
Hazard exposure
Active fault48.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.