Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23CC0256 was awarded at 100.00% of its ABC. Across its 21 recorded contracts, YPR GEN CONTRACTOR AND CONST SUPPLY INC was awarded at ≥99.5% of ABC 20 times (95.2%), versus 70.4% for flood-control contracts overall. This could be due to precise cost estimation or competitive bidding that matched the ABC exactly.

Public record entityConstruction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830)
LocationCITY OF BALIUAG (BULACAN), BULACAN, Region IIIContract 23CC0256
Amount₱72,374,165.79100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830)23CC0256Flood control100%December 22, 2023December 22, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 28, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 1st District Engineering Office",
  "ratio": 0.9999921436671957,
  "abcPhp": 72374734.39,
  "threshold": 0.995,
  "contractId": "23CC0256",
  "contractor": "YPR GEN CONTRACTOR AND CONST SUPPLY INC",
  "contractCostPhp": 72374165.79
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This could be due to precise cost estimation or competitive bidding that matched the ABC exactly.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830).” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/5bac519d-baf9-4c59-91ae-486374d309b1

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCity of Baliwag
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Active fault34.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.