Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23CC0256 was awarded at 100.00% of its ABC. Across its 21 recorded contracts, YPR GEN CONTRACTOR AND CONST SUPPLY INC was awarded at ≥99.5% of ABC 20 times (95.2%), versus 70.4% for flood-control contracts overall. This could be due to precise cost estimation or competitive bidding that matched the ABC exactly.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830)23CC0256Flood control | 100% | December 22, 2023 | December 22, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: March 28, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Bulacan 1st District Engineering Office",
"ratio": 0.9999921436671957,
"abcPhp": 72374734.39,
"threshold": 0.995,
"contractId": "23CC0256",
"contractor": "YPR GEN CONTRACTOR AND CONST SUPPLY INC",
"contractCostPhp": 72374165.79
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This could be due to precise cost estimation or competitive bidding that matched the ABC exactly.
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Structure at Barangay Hinukay, Baliuag, Bulacan (K004+530 to K004+830).” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/5bac519d-baf9-4c59-91ae-486374d309b1
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.