Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 5 contracts awarded to A C SOLIVEN CONST & GEN MERCHANDISE by the same office started within 73 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. These projects may have been planned as separate flood control works for different rivers or creeks within the same area.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Tarlac River - O'Donnell River Control, Balanti-Armenia Section (Segment N), Tarlac City, Tarlac24CJ0032Flood control | 100% | July 19, 2024 | July 19, 2024 | — | completedsumbong source |
Start: January 26, 2024 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold in one municipality
{
"deo": "Tarlac District Engineering Office",
"contractId": "24CJ0032",
"contractor": "A C SOLIVEN CONST & GEN MERCHANDISE",
"windowDays": 120,
"clusterSize": 5,
"thresholdPhp": 50000000,
"contractCostPhp": 44099535.44,
"maxInOneMunicipality": 3
}Source documents