Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23AJ0061 and 23AJ0006 have near-identical descriptions about 588 m apart (funding year 2023; ₱4.85M, ₱19.19M). Worth checking whether they cover the same works. One project may be a continuation or additional phase of the other, but the first title does not specify a phase.

Public record entityConstruction of Slope Protection along Ingalera River, Barangay Ican, Malasiqui, Pangasinan
LocationMALASIQUI (PANGASINAN), PANGASINAN, Region IContract 23AJ0061
Amount₱4,847,330.62 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection along Ingalera River, Barangay Ican, Malasiqui, Pangasinan23AJ0061Flood control100%September 2, 2023September 1, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: June 21, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23AJ0061",
  "fundingYear": 2023,
  "municipality": "MALASIQUI (PANGASINAN)",
  "distanceMeters": 588.1620649976102,
  "titleSimilarity": 0.9766990291262136
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanMalasiquiCawayan Bogtong
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault19.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.