Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22CL0080 and 22CL0072 have near-identical descriptions about 774 m apart (funding year 2022; ₱37.62M, ₱39.30M). Worth checking whether they cover the same works. It is possible that one contract is a continuation or a separate phase of the same project, but the titles do not make this clear.

Public record entityConstruction of Flood Mitigation Structure,Tambak River (Upstream), Iba, Zambales
LocationIBA (CAPITAL) (ZAMBALES), ZAMBALES, Region IIIContract 22CL0072
Amount₱39,303,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure,Tambak River (Upstream), Iba, Zambales22CL0072Flood control100%September 30, 2022September 28, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 4, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22CL0072",
  "coordinates": {
    "lat": 15.327896,
    "lon": 120.01131
  },
  "municipality": "IBA (CAPITAL) (ZAMBALES)",
  "distanceMeters": 773.6379896911126,
  "titleSimilarity": 0.9866666666666667
}

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesIbaPalanginan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault4.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA2 (3.01-4 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.