Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Malabon-Navotas District Engineering Office awarded 107 of 122 recorded flood-control contracts (87.7%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (17.3 percentage points higher; binomial p = 5.2e-06), across 51 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently accurate cost estimates or highly competitive bidding.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Malabon-Navotas District Engineering Office: contracts
107 of 122 contracts (87.7%) at ≥99.5% of ABC · peer baseline 70.4% · gap +17.3 pts · binomial p = 5.2e-6. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22OA0044 | Construction of Pumping Station, Adelfa St., Barangay Tanza 1, Navotas City | DOUBLE Z CONST AND SUPPLY | 101.06% | DPWH |
| 22OA0101 | Construction of Box Culvert along C. Arellano and Sacristia St., Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 101.05% | DPWH |
| 22OA0074 | Construction of Pumping Station, Barangay Tañong, Malabon City | AL-REM KONSTRUCT INC | 101.05% | DPWH |
| 22OA0051 | Construction of Riverwall along Tanza Dike (Phase 2), Barangay Tanza 1, Navotas City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 101.03% | DPWH |
| 22OA0071 | Construction of Riverwall along Muzon River, Baranrangay Muzon, Malabon City | AKN CONST CORP | 101.03% | DPWH |
| 22OA0047 | Construction of Riverwall (Phase 2), Barangay Dampalit, Malabon City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 101.02% | DPWH |
| 22OA0075 | Construction of Drainage in Brgy. Panghulo, Malabon City | GECEL CONST | 101.02% | DPWH |
| 22OA0042 | Construction of Riverwall (Phase 1), Barangay Dampalit, Malabon City | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 101.02% | DPWH |
| 22OA0069 | Construction of Floodwall along Chungkang River (Phase 2), Navotas City | ST TIMOTHY CONST CORP | 100.85% | DPWH |
| 24OA0051 | Construction of Babanse 1 Pumping Station (Phase 2), Barangay North Bay Boulevard South - Kaunlaran, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 100.57% | DPWH |
| 22OA0031 | Construction of Box-Culvert Drainage along C. Arellano St. (Sigwa St. to Sacristia Pumping Station), Malabon City | AL-REM KONSTRUCT INC | 100.48% | DPWH |
| 22OA0089 | Rehabilitation (Completion) of Drainage including Upgrading of Road along F. Pascual St., Brgy Tangos South, Navotas City | SAMARAH CONST AND SUPPLY | 100.22% | DPWH |
| 21OA0030 | Construction of Riverwall along South Pinagkabalian River (Phase 7), Brgy. Panghulo, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.20% | DPWH |
| 22OA0007 | Construction of Riverwall and Road Dike along Batasan River (Phase 13), Brgy. Dampalit, Malabon City | AZUL BUILDERS | 100.19% | DPWH |
| 22OA0011 | Construction of Riverwall and Road Dike along Batasan River (Phase 16), Brgy. Dampalit, Malabon City | B BERNARDO CONST INC | 100.19% | DPWH |
| 22OA0015 | Construction of Flood Control Structures (Riverwall/Road Dike) Phase 16, Barangay Dampalit, Malabon City | TWO DIMENSION CONST | 100.19% | DPWH |
| 22OA0013 | Construction of Riverwall and Road Dike along Batasan River (Phase 18), Brgy. Dampalit, Malabon City | A L SALAZAR CONST INC | 100.17% | DPWH |
| 22OA0008 | Construction of Riverwall and Road Dike along Batasan River (Phase 14), Brgy. Dampalit, Malabon City | AZUL BUILDERS | 100.17% | DPWH |
| 22OA0012 | Construction of Riverwall and Road Dike along Batasan River (Phase 17), Brgy. Dampalit, Malabon City | A L SALAZAR CONST INC | 100.16% | DPWH |
| 22OA0073 | Construction of Asinan Pumping Station, Brgy. San Agustin, Malabon City | AL-REM KONSTRUCT INC | 100.16% | DPWH |
| 22OA0002 | Construction of Box Culvert along R10 Road (Phase IV), Navotas City | C B TAMPENGCO CONST & SUPPLY | 100.12% | DPWH |
| 22OA0006 | Construction of Riverwall and Road Dike along Batasan River (Phase 12), Brgy. Dampalit, Malabon City | MEGAY CONST INC FORMERLY: MEGAY CONST | 100.12% | DPWH |
| 24OA0036 | Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 3), Barangay Muzon, Malabon City | M S RAMOS CONST INC FORMERLY: M S RAMOS | 100.11% | DPWH |
| 22OA0009 | Construction of Riverwall and Road Dike along Batasan River (Phase 15), Brgy. Dampalit, Malabon City | B BERNARDO CONST INC | 100.10% | DPWH |
| 24OA0044 | Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 7), Malabon City | A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.08% | DPWH |
| 24OA0011 | Rehabilitation of Drainage System, Navotas Elementary School, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 100.07% | DPWH |
| 24O00023 | Construction of South Pinagkabalian Pumping Station (Phase 2), Malabon City | E F CHUA CONST INC | 100.05% | DPWH |
| 24OA0016 | Construction of Riverwall along Tanza Dike (Phase 3), Barangay Tanza, Navotas City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.05% | DPWH |
| 22OA0049 | Construction of Remegio Pumping Station, Brgy. Maysilo, Malabon City | AL-REM KONSTRUCT INC | 100.04% | DPWH |
| 22OA0014 | Construction of Riverwall and Road Dike along Batasan River (Phase 19), Brgy. Dampalit, Malabon City | A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.04% | DPWH |
| 23OA0038 | Construction of Martiniko Pumping Station (Boundary of Navotas and Malabon), NBBS Dagat-Dagatan, Navotas City | EMICA BUILDERS AND SUPPLY | 100.03% | DPWH |
| 23OA0059 | Rehabilitation of Riverwall along Tangos River (Phase 9), Navotas City | TOPNOTCH CATALYST BUILDERS INC | 100.03% | DPWH |
| 24OA0029 | Construction of Drainage System along C-4 Road, Navotas City | C B TAMPENGCO CONST & SUPPLY | 100.03% | DPWH |
| 22OA0019 | Construction of Riverwall along South Pinagkabalian River (Phase 8), Brgy. Panghulo, Malabon City | AKN CONST CORP | 100.03% | DPWH |
| 23OA0035 | Construction of Yangco Pumping Station, Brgy. Navotas East, Navotas City | EMICA BUILDERS AND SUPPLY | 100.02% | DPWH |
| 23OA0039 | Construction of Tanza Pumping Station No. 3, Tanza 2, Navotas City | 816 EMBER CONST CORP | 100.02% | DPWH |
| 24OA0012 | Construction of Drainage System along Northbay Boulevard, Navotas City | 721 BUILDERS CORP | 100.02% | DPWH |
| 23OA0034 | Construction of Takino Pumping Station, Bangkulasi, Navotas City | WAY MAKER GEN CONTRACTOR OPC | 100.02% | DPWH |
| 23OA0042 | Construction of Site 8 (Mamale 2) Pumping Station, Brgy. NBBS Dagat-Dagatan, Navotas City | WAY MAKER GEN CONTRACTOR OPC | 100.02% | DPWH |
| 23OA0045 | Construction of Kanduli Pumping Station, Brgy. NBBS Kaunlaran, Navotas City | 721 BUILDERS CORP | 100.02% | DPWH |
| 24OA0035 | Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 2), Barangay Muzon, Malabon City | JTC CRUZ CONST CO INC | 100.02% | DPWH |
| 22OA0108 | Construction of Two (2) Pumping Stations along Navotas Coastal Dike, Phase 4, Navotas City | EIGHT J'S CONST SERVICES | 100.02% | DPWH |
| 24OA0019 | Construction of Pumping Station, Daanghari Creek, Barangay Daanghari, Navotas City | P7 BUILDERS INC | 100.01% | DPWH |
| 24OA0015 | Construction of Riverwall along Tangos River (Phase 2), Navotas City | TOPNOTCH CATALYST BUILDERS INC | 100.01% | DPWH |
| 23OA0070 | Construction of Pumping Station in Batasan River (Phase 1), Malabon City | NEWBIG FOUR J CONST INC FORMERLY FOUR J | 100.01% | DPWH |
| 24OA0043 | Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 6), Malabon City | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 100.01% | DPWH |
| 23OA0044 | Construction of Babanse 1 Pumping Station, Brgy. NBBS Kaunlaran, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 100.01% | DPWH |
| 21OA0029 | Construction of Riverwall along Malabon-Tullahan River, Brgy. San Agustin, Malabon City | MEGAY CONST INC FORMERLY: MEGAY CONST | 100.01% | DPWH |
| 23OA0058 | Construction of Drainage System & Upgrading of Road, Longos, Malabon City | IM CONST CORP | 100.01% | DPWH |
| 23OA0050 | Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 2) | AZUL BUILDERS | 100.01% | DPWH |
| 23OA0052 | Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 4) | A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.01% | DPWH |
| 22OA0005 | Construction of Riverwall and Road Dike along Batasan River (Phase 11), Brgy. Dampalit, Malabon City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.01% | DPWH |
| 22OA0072 | Construction of M. Blas Pumping Station including Drainage System, Brgy. Hulong Duhat, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.01% | DPWH |
| 23OA0046 | Construction of Milflores Pumping Station, Brgy. Tanza 2, Navotas City | 5-1 CONST CORP | 100.01% | DPWH |
| 23OA0043 | Construction of Maliputo Pumping Station, Brgy. NBBS Dagat-Dagatan, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 100.01% | DPWH |
| 23OA0051 | Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 3) | DMLC BUILDERS | 100.01% | DPWH |
| 22OA0109 | Construction of Two (2) Pumping Stations along Navotas Coastal Dike, Phase 5, Navotas City | EIGHT J'S CONST SERVICES | 100.01% | DPWH |
| 23OA0060 | Construction of Riverwalls along Tangos River, Navotas City (Phase 1) | TOPNOTCH CATALYST BUILDERS INC | 100.01% | DPWH |
| 23OA0049 | Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 1) | AZUL BUILDERS | 100.01% | DPWH |
| 24OA0022 | Construction of Ablola Pumping Station, Barangay Tangos North, Navotas City | ST TIMOTHY CONST CORP | 100.01% | DPWH |
| 23OA0053 | Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 5) | MEGAY CONST INC FORMERLY: MEGAY CONST | 100.01% | DPWH |
| 24OA0032 | Construction of Dampalit Riverwall (Phase 7), Barangay Dampalit, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.01% | DPWH |
| 24OA0041 | Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 8), Barangay Muzon, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.01% | DPWH |
| 21OA0002 | Construction of Riverwall and Road Dike along Batasan River (Phase 7), Brgy. Dampalit, Malabon City | E L TORRES CONST AND TRADING INC FORMERLY : E L TORRES CONST & TRADING | 100.01% | DPWH |
| 22OA0034 | Construction of Riverwall along Malabon-Tullahan River (Phase 4), Brgy. Potrero, Malabon City | ST TIMOTHY CONST CORP | 100.00% | DPWH |
| 24OA0021 | Construction of Pumping Station, Navotas City Hall, Barangay Sipac-Almacen, Navotas City | STRUKTURA TEKNIKA SERVICES CO | 100.00% | DPWH |
| 23OA0013 | Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 3) | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.00% | DPWH |
| 23OA0036 | Construction of Sagisag Pumping Station, Brgy. Tanza 1, Navotas City | 5-1 CONST CORP | 100.00% | DPWH |
| 23OA0082 | Construction of Dampalit Pumping Station (Phase 2), Malabon City | E F CHUA CONST INC | 100.00% | DPWH |
| 23OA0037 | Construction of Judge Roldan Pumping Station, San Roque, Navotas City | TWO DIMENSION CONST | 100.00% | DPWH |
| 23OA0084 | Rehabilitation of Riverwall along Tullahan River at Brgy. San Agustin to Brgy. Concepcion, Malabon City | L R TIQUI BUILDERS INC | 100.00% | DPWH |
| 22OA0077 | Construction/Installation of Pumping Station including drainage system, Brgy. Longos, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST / NEWBIG FOUR J CONST INC FORMERLY FOUR J | 100.00% | DPWH |
| 24OA0034 | Construction of Flood Mitigation Structure, Dampalit Riverwall (Phase 9), Barangay Dampalit, Malabon City | JTC CRUZ CONST CO INC | 100.00% | DPWH |
| 24OA0040 | Construction of Muzon Riverwall (Phase 7), Barangay Muzon, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.00% | DPWH |
| 23OA0083 | River Improvement Works along Dampalit River, Brgy. Dampalit, Malabon | A L SALAZAR CONST INC / AL-REM KONSTRUCT INC | 100.00% | DPWH |
| 24OA0038 | Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 5), Barangay Muzon, Malabon City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.00% | DPWH |
| 23OA0014 | Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 4) | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 23OA0015 | Construction of Flood Mitigation Structure, Barangay Dampalit, Malabon City (Phase 5) | E L TORRES CONST AND TRADING INC FORMERLY : E L TORRES CONST & TRADING | 100.00% | DPWH |
| 21OA0005 | Construction of Riverwall and Road Dike along Batasan River (Phase 10), Brgy. Dampalit, Malabon City | JUSTBILT BUILDERS | 100.00% | DPWH |
| 22OA0033 | Construction of Riverwall along Malabon-Tullahan River (Phase 3), Brgy. Potrero, Malabon City | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 24OA0042 | Construction of Flood Mitigation Structure along Muzon and Dampalit River (Phase 1), Malabon City | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 100.00% | DPWH |
| 21OA0004 | Construction of Riverwall and Road Dike along Batasan River (Phase 9), Brgy. Dampalit, Malabon City | TWO DIMENSION CONST | 100.00% | DPWH |
| 21OA0003 | Construction of Riverwall and Road Dike along Batasan River (Phase 8), Brgy. Dampalit, Malabon City | DREAMWORX BUILDER & TRADING INC / QUATRIX CONST AND SUPPLY INC | 100.00% | DPWH |
| 24OA0027 | Construction of Box Culvert along M. Naval St., from Badeo 2 to F. Pascual St., Navotas City | IM CONST CORP | 100.00% | DPWH |
| 22OA0061 | Construction of Box-Culvert Drainage along Sanciangco St. (Gov. Pascual Ave. to Bustamante St.), Malabon City | SKYSCRAPERPH CONST CORP | 100.00% | DPWH |
| 22OA0048 | Construction of Box-Culvert Drainage along Sanciangco St. (P. Aquino St. To Catmon Bridge), Malabon City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.00% | DPWH |
| 24OA0039 | Construction of Muzon Riverwall (Phase 6), Barangay Muzon, Malabon City | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 100.00% | DPWH |
| 24OA0023 | Construction of Tambak Uno Pumping Station, Barangay Tanza 2, Navotas City | 721 BUILDERS CORP | 100.00% | DPWH |
| 22OA0078 | Construction (Completion) of Riverwall along Cut-Off Channel, Barangay Bagumbayan North, Navotas City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 100.00% | DPWH |
| 22OA0036 | Construction of Bacog Pumping Station, Navotas City | AYANA CONST AND TRADING | 100.00% | DPWH |
| 23OA0068 | Construction of Box Culvert (from Gov. Pascual to Judge Roldan), San Roque, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 100.00% | DPWH |
| 24OA0071 | Construction of Flood Mitigation System at R10, Barangay North Bay Boulevard South - Proper, Navotas City, Metro Manila | JONOR DC CONST | 100.00% | DPWH |
| 24OA0033 | Construction of Flood Mitigation Structure, Dampalit Riverwall (Phase 8), Barangay Dampalit, Malabon City | ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 100.00% | DPWH |
| 22OA0017 | Construction of Box Culvert along M. Naval St. from Badeo 5 to F. Pascual St., Navotas City | CATTECORYLL CONST & TRADING CORP | 100.00% | DPWH |
| 24OA0010 | Construction of Drainage System in Barangay Tanza, Navotas City | 721 BUILDERS CORP | 100.00% | DPWH |
| 23OA0040 | Construction of B. Cruz Pumping Staiton, Brgy. Tangos North, Navotas City | TWO DIMENSION CONST | 100.00% | DPWH |
| 24OA0004 | Construction (Completion) of Box Culvert Canal along C-4 Road from Lizan to 100 Interior Bagumbayan South, Navotas City | TRI-DAN-J CONST AND TRADING | 99.99% | DPWH |
| 23OA0057 | Rehabilitation of Floodwall along Malabon-Tullahan River, Brgy. Potrero, Malabon City | AL-REM KONSTRUCT INC | 99.99% | DPWH |
| 23OA0069 | Construction of Box Culvert Oliveros to J. Pascual Buenaventura, Tangos North, Navotas City | 721 BUILDERS CORP | 99.99% | DPWH |
| 22OA0055 | Construction of Bonifacio Pumping Station, Brgy. Flores, Malabon City | AL-REM KONSTRUCT INC | 99.99% | DPWH |
| 22OA0043 | Construction of R-10 Pumping Station, Navotas City | CATTECORYLL CONST & TRADING CORP | 99.99% | DPWH |
| 23OA0047 | Construction of Kahunari Pumping Station, Brgy. San Jose, Navotas City | AYANA CONST AND TRADING | 99.98% | DPWH |
| 24OA0005 | Construction of Box Culvert along Judge Roldan St. (Phase 2), Barangay San Roque, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 99.98% | DPWH |
| 22OA0035 | Construction of Flood Control Structure (Floodwall) along Chungkang River, Navotas City | A L SALAZAR CONST INC / TOPNOTCH CATALYST BUILDERS INC | 99.98% | DPWH |
| 23OA0048 | Construction of Mamale 1 Pumping Station, NBBS Dagat Dagatan, Navotas City | WAY MAKER GEN CONTRACTOR OPC | 99.97% | DPWH |
| 22OA0060 | Construction of Marala Pumping Station, Navotas City | CATTECORYLL CONST & TRADING CORP | 99.96% | DPWH |
| 22OA0095 | Rehabilitation (Completion) of Spine Canal, Navotas City | EARTHWORK BUILDERS INC FORMERLY: EARTHWORK MOVERS | 99.77% | DPWH |
| 22OA0037 | Construction of C-4 Centennial Park Pumping Station, Navotas City | AYANA CONST AND TRADING | 99.39% | DPWH |
| 21OA0055 | Construction of River Wall along Cut-Off Channel, Barangay Bagumbayan North, Navotas City | JAGONBUILD CONST CORP FOR JAGON BUILDERS | 98.85% | DPWH |
| 22OA0032 | Construction of Riverwall along Malabon-Tullahan River (Phase 2), Brgy. Potrero, Malabon City | A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 98.68% | DPWH |
| 22OA0038 | Construction of Riverwall and Road Dike along Batasan River (Phase 20), Brgy. Dampalit, Malabon City | A L SALAZAR CONST INC | 98.49% | DPWH |
| 22OA0058 | Construction of Box-Culvert along R-10 Road (North Bound) from C-3 Road to Lapu-Lapu Avenue, Navotas City | PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP | 98.48% | DPWH |
| 22OA0039 | Construction of Riverwall and Road Dike along Batasan River (Phase 21), Brgy. Dampalit, Malabon City | A L SALAZAR CONST INC | 98.48% | DPWH |
| 22OA0064 | Closing of Remaining Gaps along Malabon-Tullahan River (Potrero Section), Malabon City | A L SALAZAR CONST INC | 98.48% | DPWH |
| 22OA0040 | Construction of Riverwall and Road Dike along Batasan River (Phase 22), Brgy. Dampalit, Malabon City | A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 98.47% | DPWH |
| 22OA0018 | Construction of Riverwall along Malabon-Tullahan River, Brgy. Niugan, Malabon City | MEGAY CONST INC FORMERLY: MEGAY CONST / MGY BUILDERS CORP | 98.47% | DPWH |
| 22OA0063 | Closing of Remaining Gaps along Malabon-Tullahan River (Catmon, Tenajeros and PNR Station), Malabon City | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP / CALCON ENGINEERING | 98.46% | DPWH |
| 22OA0026 | Construction of Box Culvert along Gov. A. Pascual St., From Judge A. Roldan to T. Gonzales St. connecting to Bacog Pumping Station, Navotas City | IM CONST CORP | 98.46% | DPWH |
| 22OA0062 | Closing of Gaps along Malabon-Navotas & Tullahan River, Malabon City | NEWBIG FOUR J CONST INC FORMERLY FOUR J | 98.43% | DPWH |
| 21OA0056 | Construction of Floodwall and Upgrading of Road with Drainage System along Adelfa St., Barangay Tanza 1, Navotas City | IM CONST CORP | 98.41% | DPWH |
| 24OA0050 | Construction of Flood Control Structure, Barangay Tañong to Barangay Dampalit, Malabon City | A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST | 96.99% | DPWH |
| 23OA0041 | Construction of B. Caseñas Pumping Station, Brgy. Tangos North, Navotas City | BLACK HARDHAT INC FORMERLY: JCHARDHAT INC | 96.97% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Malabon-Navotas District Engineering Office",
"nearAbc": 107,
"trigger": "office_pattern_aggregate",
"officeId": "30380523-e30d-5c4f-8114-3addfd3f9990",
"threshold": 0.995,
"binomialTailP": 0.000005204905740777006,
"nearAbcRatePct": 87.7,
"totalContracts": 122,
"baselineRatePct": 70.4,
"excessPctPoints": 17.3,
"expectedNearAbc": 85.9,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents