Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 4)
Construction of Flood Mitigation Structure along Tanza River and Malabon-Navotas River, Malabon City (Phase 4) is a DPWH-tracked public work in CITY OF MALABON (METROPOLITAN MANILA), MALABON CITY, National Capital Region. Reported contract value: ₱62,725,000.00. Status: Reported complete (DPWH). Contractor on record: A L SALAZAR CONST INC / ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST. Figures trace to sumbong.
Total Contract Cost


