Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24OE0041 and 24OE0043 have near-identical descriptions about 253 m apart (funding year 2024; ₱144.07M, ₱144.72M). Worth checking whether they cover the same works. These could be separate booster pumps installed at two nearby esteros under the same package.

Public record entityInstallation of Booster Pump at Estero dela Reina (Package 1b), Binondo, Manila City
LocationCITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital RegionContract 24OE0041
Amount₱144,066,590.10 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Skipped: this map coordinate is shared by many projects, so the pin may not mark the exact worksite.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Installation of Booster Pump at Estero dela Reina (Package 1b), Binondo, Manila City24OE0041Flood control100%July 11, 2024June 7, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 13, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24OE0041",
  "coordinates": {
    "lat": 14.602906,
    "lon": 120.97274
  },
  "municipality": "CITY OF MANILA (METROPOLITAN MANILA)",
  "distanceMeters": 253.16198962161718,
  "titleSimilarity": 0.8805031446540881
}

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaBinondoBarangay 293
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Active fault10.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA2 (3.01-4 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.