Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Negros Oriental 2nd District Engineering Office awarded 27 of 27 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 7.7e-05), across 11 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or careful cost estimation.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Negros Oriental 2nd District Engineering Office: contracts
27 of 27 contracts (100%) at ≥99.5% of ABC · peer baseline 70.4% · gap +29.6 pts · binomial p = 7.7e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22HK0042 | Reconstruction of Ocoy River Control, Sibulan, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 21HK0084 | Reconstruction/ Rehabilitation of Ocoy River Control, Calabnugan, Sibulan, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 23HK0059 | Rehabilitation of Tanjay River Control, Pamplona Section, Simborio, Pamplona, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 22HK0084 | Construction of Flood Mitigation Structure (Shore Protection), Barangay Calindagan (from the mouth of Banica River) to Barangay Mangnao, Dumaguete City, Negros | SUPREME MEGA STRUCTURE BUILDERS INC / SYNDTITE CONST CORP FORMERLY: R C TAGALA CONST | 100.00% | DPWH |
| 23HK0120 | Rehabilitation of Lala-an Seawall, Barangay Sto. Niño, San Jose, Negros Oriental | UY CONDEV CORP FORMERLY:UY CONST & | 100.00% | DPWH |
| 23HK0063 | Construction of Tamogong River Control, Bais City, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 23HK0104 | Construction of Banica River Control, Dumaguete City, Negros Oriental (Phase 1) | UY CONDEV CORP FORMERLY:UY CONST & | 100.00% | DPWH |
| 22HK0030 | Construction of Drainage Canal, Barangay Banilad, Dumaguete City, Negros Oriental | ASHLEYKA CONST AND SUPPLIES | 100.00% | DPWH |
| 24HK0106 | Construction of Tanjay River Control Structure, Tanjay City, Negros Oriental | QM BUILDERS | 100.00% | DPWH |
| 22HK0043 | Reconstruction of Tamogong River Control, Bais City, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 23HK0070 | Rehabilitation of Lumbangan River Control, Mabinay, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 23HK0090 | Flood Management Program - Rehabilitation of Tanjay River Control, Pamplona Section, Simborio, Pamplona, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 24HK0059 | Construction of Calabnugan CIS Flood/Slope Protection Works/ River Sill, Sibulan, Negros Oriental | ASHLEYKA CONST AND SUPPLIES | 100.00% | DPWH |
| 24HK0050 | Construction of Flood Control Dike, Barangay Panalaan, Bais City, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 22HK0085 | Construction of Shore Protection, Brgy. Ajong, Sibulan, Negros Oriental | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 22HK0045 | Construction of Tanjay River Control, Tanjay City, Negros Oriental | LEGACY CONST CORP FORMERLY: LEGACY CONST / MIGHTY HOK SUMMIT CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23HK0062 | Rehabilitation of Ocoy River Control, Magatas, Sibulan, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 21HK0085 | Construction of Ocoy River Control, Calabnugan, Sibulan, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 23HK0060 | Rehabilitation of Tamogong River Control, Bais City, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 23HK0091 | Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 100.00% | DPWH |
| 21HK0083 | Reconstruction/ Rehabilitation of Tanjay River Control, Datagon And Balayong Pamplona Section, Negros Oriental | UY CONDEV CORP FORMERLY:UY CONST & | 100.00% | DPWH |
| 23HK0057 | Construction of Shore Protection/Seawall, Brgy. 4, Tanjay City, Negros Oriental | D K JOCSON CONST | 100.00% | DPWH |
| 23HK0061 | Construction of Namangyan River Control, Mabinay, Negros Oriental | MIGHTY HOK SUMMIT CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23HK0053 | Construction of Banica River Control, Junob, Dumaguete City, Negros Oriental | ASHLEYKA CONST AND SUPPLIES | 100.00% | DPWH |
| 22HK0089 | Repair/Rehabilitation of Cogon Flood Control, Barangay San Jose, Tanjay City, Negros Oriental | R E SINGSON CONST AND DEVELOPMENT INC FORMERLY: R E SINGSON CONST | 100.00% | DPWH |
| 22HK0044 | Reconstruction of Tugas-Polo Seawall, Tanjay City, Negros Oriental | QM BUILDERS | 100.00% | DPWH |
| 23HK0044 | Construction of Drainage Canal, Barangay Boloc-boloc, Sibulan, Negros Oriental | 8G CONST AND GEN SERVICES | 99.94% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Negros Oriental 2nd District Engineering Office",
"nearAbc": 27,
"trigger": "office_pattern_aggregate",
"officeId": "7eb6f822-6fdb-5d08-b5c3-14c293b0995f",
"threshold": 0.995,
"binomialTailP": 0.00007666497635142192,
"nearAbcRatePct": 100,
"totalContracts": 27,
"baselineRatePct": 70.4,
"excessPctPoints": 29.6,
"expectedNearAbc": 19,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
