Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CN0080 was awarded at 100.00% of its ABC. Across its 36 recorded contracts, DALCON CONST was awarded at ≥99.5% of ABC 35 times (97.2%), versus 70.4% for flood-control contracts overall. It is possible the contractor bid exactly at the ABC to maximize their chance of winning within legal limits.

Public record entityConstruction of Subsub River Control Structure, Brgy. Davil-davilan, Dingalan, Aurora
LocationDINGALAN (AURORA), AURORA, Region IIIContract 24CN0080
Amount₱16,887,500.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Subsub River Control Structure, Brgy. Davil-davilan, Dingalan, Aurora24CN0080Flood control100%September 20, 2024September 20, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 30, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Aurora District Engineering Office",
  "ratio": 1,
  "abcPhp": 16887500,
  "threshold": 0.995,
  "contractId": "24CN0080",
  "contractor": "DALCON CONST",
  "contractCostPhp": 16887500
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraDingalanDavildavilan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Man-Yi 2024
Hazard exposure
Active fault2.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.