Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24DL0015 and 23DL0083 have near-identical descriptions about 86 m apart (funding years 2023, 2024; ₱19.60M, ₱24.50M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or extension of the first project, but this is not labeled in the titles.

Public record entityConstruction of Breakwater, Alabat, Quezon
LocationALABAT (QUEZON), QUEZON, Region IV-AContract 24DL0015
Amount₱19,599,888.56 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Breakwater, Alabat, Quezon24DL0015Flood control100%November 6, 2024November 6, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 12, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24DL0015",
  "fundingYear": 2024,
  "municipality": "ALABAT (QUEZON)",
  "distanceMeters": 85.79338512815133,
  "titleSimilarity": 0.975725900116144
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Quezon
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault3.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)no layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideno layer coverage for this provinceUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.