Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23AI0088 lists a cost of ₱19.74M, 0.72% above its Approved Budget for the Contract of ₱19.60M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a late adjustment to the ABC that was not reflected in the records.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II)23AI0088Flood control | 100% | February 10, 2024 | February 10, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: July 17, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Pangasinan 3rd District Engineering Office",
"ratio": 1.007197148979592,
"abcPhp": 19600000,
"threshold": 0.995,
"contractId": "23AI0088",
"contractor": "BUILDERS EXPONENT EMPIRE CORP FORMERLY: BUILDERS EXPONENT ENT",
"contractCostPhp": 19741064.12
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to a data entry error or a late adjustment to the ABC that was not reflected in the records.
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II).” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/d194976a-9e79-4387-92b0-54dbed936f3c
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.