Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23AI0088 lists a cost of ₱19.74M, 0.72% above its Approved Budget for the Contract of ₱19.60M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a late adjustment to the ABC that was not reflected in the records.

Public record entityConstruction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II)
LocationCITY OF URDANETA (PANGASINAN), PANGASINAN, Region IContract 23AI0088
Amount₱19,741,064.12100.72% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II)23AI0088Flood control100%February 10, 2024February 10, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: July 17, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Pangasinan 3rd District Engineering Office",
  "ratio": 1.007197148979592,
  "abcPhp": 19600000,
  "threshold": 0.995,
  "contractId": "23AI0088",
  "contractor": "BUILDERS EXPONENT EMPIRE CORP FORMERLY: BUILDERS EXPONENT ENT",
  "contractCostPhp": 19741064.12
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a late adjustment to the ABC that was not reflected in the records.

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction/Maintenance of Flood Mitigation Structures and Drainage Systems along Labit River, Brgy. Labit West Zone 1, Urdaneta City, Pangasinan (Phase II).” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/d194976a-9e79-4387-92b0-54dbed936f3c

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanCity of UrdanetaLabit West
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault19.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.